Sl.No |
IP Name |
Plot/Shed No. |
Structure Type |
Area(Sq.M) |
Area(Acrs) |
Updation Date |
Status |
Remarks |
1 |
GROWTH CENTRE BOBBILI |
10_A |
PLOT |
10918.0 |
02.70 |
01-MAR-21 |
Vacant |
|
2 |
GROWTH CENTRE BOBBILI |
10_B |
PLOT |
11455.0 |
02.83 |
12-DEC-22 |
Vacant but Unallottable |
|
3 |
GROWTH CENTRE BOBBILI |
119 |
PLOT |
1500.0 |
00.37 |
31-MAY-24 |
Vacant but Unallottable |
The Applicant should pay the cost of existing structures of Rs 5,06,756/- in the Plot in addition to the land Cost |
4 |
GROWTH CENTRE BOBBILI |
12 |
PLOT |
28937.0 |
07.15 |
18-JAN-16 |
Vacant |
|
5 |
GROWTH CENTRE BOBBILI |
132 |
PLOT |
1500.0 |
00.37 |
31-MAY-24 |
Vacant but Unallottable |
The Applicant should pay the cost of existing structures of Rs 9,69,877/- in the Plot in addition to the land Cost |
6 |
GROWTH CENTRE BOBBILI |
140 |
PLOT |
997.0 |
00.25 |
16-SEP-20 |
Vacant |
|
7 |
GROWTH CENTRE BOBBILI |
140/A |
PLOT |
2959.0 |
00.73 |
18-JAN-16 |
Vacant |
|
8 |
GROWTH CENTRE BOBBILI |
142 |
PLOT |
7148.0 |
01.77 |
21-MAR-11 |
Vacant but Unallottable |
Refund under process |
9 |
GROWTH CENTRE BOBBILI |
143 |
PLOT |
7148.0 |
01.77 |
21-MAR-11 |
Vacant but Unallottable |
Plot Allotted and submitted to Government for approval/ratification |
10 |
GROWTH CENTRE BOBBILI |
145/C |
PLOT |
2696.0 |
00.67 |
05-SEP-19 |
Vacant but Unallottable |
The allotment of M/s DKV Industries was cancelled and the Plot was resumed on 13.3.2024 and Cancellation deed to be executed |
11 |
GROWTH CENTRE BOBBILI |
147 |
PLOT |
4343.0 |
01.07 |
31-JUL-23 |
Vacant but Unallottable |
The Allotment of M/s. Balaji Industries was cancelled and Plot was resumed on 03.07.2023 and Deed of Cancellation to be executed |
12 |
GROWTH CENTRE BOBBILI |
148 |
PLOT |
4400.0 |
01.09 |
20-JUN-24 |
Vacant but Unallottable |
The Allotment of M/s Sri Ram Dev Industries was cancelled and deed of cancellation was executed and refund under process |
13 |
GROWTH CENTRE BOBBILI |
153_A |
PLOT |
6071.0 |
01.50 |
05-AUG-20 |
Vacant |
|
14 |
GROWTH CENTRE BOBBILI |
153_B |
PLOT |
2152.0 |
00.53 |
01-MAR-21 |
Vacant |
|
15 |
GROWTH CENTRE BOBBILI |
156_B |
PLOT |
4042.73 |
01.00 |
20-JUN-24 |
Vacant |
|
16 |
GROWTH CENTRE BOBBILI |
156_F |
PLOT |
1368.2 |
00.34 |
20-JUN-24 |
Vacant but Unallottable |
The Allotment of M/s. Vijaya Industries was cancelled and Plot resumed on 27.3.2021 and Cancellation deed to be executed |
17 |
GROWTH CENTRE BOBBILI |
157 |
PLOT |
14673.0 |
03.63 |
18-JAN-16 |
Vacant |
|
18 |
GROWTH CENTRE BOBBILI |
158_A |
PLOT |
10500.0 |
02.59 |
01-AUG-23 |
Vacant but Unallottable |
the Allotment of M/s. Sri Ganesh Ispat was cancelled due to Non implementation of the Unit and Plot was resumed on 03.7.2023 |
19 |
GROWTH CENTRE BOBBILI |
158_B |
PLOT |
10500.0 |
02.59 |
31-JUL-23 |
Vacant but Unallottable |
The Allotment of M/s. RANI SATI ENTERPRISES was cancelled and Plot was resumed on 03.07.2023 and Deed of Cancellation to be executed |
20 |
GROWTH CENTRE BOBBILI |
159_B |
PLOT |
10500.0 |
02.59 |
31-JUL-23 |
Vacant but Unallottable |
The Allotment of M/s. LC Enterprises was cancelled and Plot was resumed on 03.07.2023 and Deed of Cancellation to be executed |
21 |
GROWTH CENTRE BOBBILI |
161_Part_2 |
PLOT |
16023.0 |
03.96 |
03-JUN-22 |
Vacant |
|
22 |
GROWTH CENTRE BOBBILI |
162 |
PLOT |
34777.36 |
08.59 |
20-JUN-24 |
Vacant but Unallottable |
The allotment of M/s Vennar Engg Works was cancelled and the Plot was resumed on 10.3.2016 and Cancellation deed to be executed |
23 |
GROWTH CENTRE BOBBILI |
163 |
PLOT |
33335.0 |
08.24 |
18-JAN-16 |
Vacant |
|
24 |
GROWTH CENTRE BOBBILI |
164 |
PLOT |
33335.0 |
08.24 |
18-JAN-16 |
Vacant |
|
25 |
GROWTH CENTRE BOBBILI |
166 |
PLOT |
1100.0 |
00.27 |
02-JUL-22 |
Vacant but Unallottable |
|
26 |
GROWTH CENTRE BOBBILI |
167 |
PLOT |
1100.0 |
00.27 |
29-DEC-22 |
Vacant but Unallottable |
|
27 |
GROWTH CENTRE BOBBILI |
169_A |
PLOT |
855.51 |
00.21 |
20-JUN-24 |
Vacant but Unallottable |
Allotment of M/s Sai Rama Engineering works was Plot was resumed on 13.3.2024 and Cancellation deed to be executed |
28 |
GROWTH CENTRE BOBBILI |
169_B |
PLOT |
800.0 |
00.20 |
04-FEB-22 |
Vacant but Unallottable |
|
29 |
GROWTH CENTRE BOBBILI |
173_B |
PLOT |
800.0 |
00.20 |
20-JUN-24 |
Vacant but Unallottable |
The Allotment of M/s Classic General Engg was cancelled and deed of cancellation was executed and refund under process |
30 |
GROWTH CENTRE BOBBILI |
177_A |
PLOT |
800.0 |
00.20 |
20-JUN-24 |
Vacant but Unallottable |
The allotment of M/s. Gowthimi General Engg was cancelled on 12.4.12 and , the Plot was resumed on 20-Nov-2021 and Cancellation deed to be executed |
31 |
GROWTH CENTRE BOBBILI |
177_B |
PLOT |
800.0 |
00.20 |
31-MAR-21 |
Vacant but Unallottable |
|
32 |
GROWTH CENTRE BOBBILI |
180_A |
PLOT |
800.0 |
00.20 |
19-JAN-11 |
Vacant |
|
33 |
GROWTH CENTRE BOBBILI |
181_B |
PLOT |
800.0 |
00.20 |
20-JUN-24 |
Vacant but Unallottable |
The allotment of M/s Vijaya Lakshmi Industries was cancelled and the Plot was resumed on 20-Nov-2021 and Cancellation deed to be executed |
34 |
GROWTH CENTRE BOBBILI |
182_A |
PLOT |
800.0 |
00.20 |
20-JUN-24 |
Vacant but Unallottable |
The allotment of M/s Sai Engineering Industries was cancelled and , the Plot was resumed on 20-Nov-2021 and Cancellation deed to be executed |
35 |
GROWTH CENTRE BOBBILI |
187_B |
PLOT |
800.0 |
00.20 |
20-JUN-24 |
Vacant but Unallottable |
The allotment of M/s Siva Industries was cancelled and , the Plot was resumed on 20-Nov-2021 and Cancellation deed to be executed |
36 |
GROWTH CENTRE BOBBILI |
188_A |
PLOT |
800.0 |
00.20 |
20-JUN-24 |
Vacant but Unallottable |
The Allotment of M/s. Sri Raja Heavy and Fabrication Works was cancelled and Plot was resumed on 22.12.23 and Cancellation deed to be executed |
37 |
GROWTH CENTRE BOBBILI |
189_A |
PLOT |
800.0 |
00.20 |
20-JUN-24 |
Vacant but Unallottable |
The Allotment of M/Jyothi Industries was cancelled and deed of cancellation was executed and refund under process |
38 |
GROWTH CENTRE BOBBILI |
189_B |
PLOT |
800.0 |
00.20 |
20-JUN-24 |
Vacant but Unallottable |
The Allotment of M/s Siva Prasad Engg Works was cancelled on 13.11.2023 and the Plot was resumed on 24.5.24 and Cancellation deed to be executed |
39 |
GROWTH CENTRE BOBBILI |
190_A |
PLOT |
800.0 |
00.20 |
09-DEC-24 |
Vacant but Unallottable |
The Allotment of M/s. Sri Syam Fabrications was cancelled and .Plot was resumed on 03.7.2023 and Cancellation deed to be executed |
40 |
GROWTH CENTRE BOBBILI |
190_B |
PLOT |
882.0 |
00.22 |
09-DEC-24 |
Vacant |
|
41 |
GROWTH CENTRE BOBBILI |
192_B |
PLOT |
800.0 |
00.20 |
06-DEC-21 |
Vacant |
|
42 |
GROWTH CENTRE BOBBILI |
193_A |
PLOT |
800.0 |
00.20 |
09-FEB-11 |
Vacant but Unallottable |
|
43 |
GROWTH CENTRE BOBBILI |
193_B |
PLOT |
800.0 |
00.20 |
20-JUN-24 |
Vacant but Unallottable |
The allotment of M/s Siva Shivshakthi was cancelled on 3.7.18 and the Plot was resumed on 20-Nov-2021 and Cancellation deed to be executed |
44 |
GROWTH CENTRE BOBBILI |
194_A |
PLOT |
800.0 |
00.20 |
08-FEB-23 |
Vacant but Unallottable |
|
45 |
GROWTH CENTRE BOBBILI |
194_B |
PLOT |
800.0 |
00.20 |
12-DEC-22 |
Vacant but Unallottable |
|
46 |
GROWTH CENTRE BOBBILI |
196_A1 |
PLOT |
1078.0 |
00.27 |
14-JUL-11 |
Vacant |
|
47 |
GROWTH CENTRE BOBBILI |
196_A2 |
PLOT |
1000.0 |
00.25 |
14-JUL-11 |
Vacant |
|
48 |
GROWTH CENTRE BOBBILI |
196_A3 |
PLOT |
1200.0 |
00.30 |
20-JUN-24 |
Vacant but Unallottable |
The Allotment of M/s Dhanujaya Steel and Hardware was cancelled and plot was resumed on 22.12.23 and Cancellation deed to be executed |
49 |
GROWTH CENTRE BOBBILI |
199_B |
PLOT |
800.0 |
00.20 |
20-JUN-24 |
Vacant but Unallottable |
The Allotment of M/s. Sri Bala Industries was cancelled and Plot was resumed on 29.1.2022 and Cancellation deed to be executed |
50 |
GROWTH CENTRE BOBBILI |
204 |
PLOT |
7273.0 |
01.80 |
21-DEC-20 |
Vacant |
|
51 |
GROWTH CENTRE BOBBILI |
205 |
PLOT |
15700.0 |
03.88 |
04-JAN-21 |
Vacant |
|
52 |
GROWTH CENTRE BOBBILI |
206 |
PLOT |
15725.0 |
03.89 |
04-JAN-21 |
Vacant |
|
53 |
GROWTH CENTRE BOBBILI |
208 |
PLOT |
19200.0 |
04.74 |
18-JAN-16 |
Vacant |
|
54 |
GROWTH CENTRE BOBBILI |
212 |
PLOT |
16000.0 |
03.95 |
18-JAN-16 |
Vacant |
|
55 |
GROWTH CENTRE BOBBILI |
213 |
PLOT |
16579.34 |
04.10 |
20-JUN-24 |
Vacant but Unallottable |
The Allotment of M/s. Geebee Ferro Power Pvt Ltd was cancelled and plot was resumed on 3.8.2023 and Cancellation deed to be executed |
56 |
GROWTH CENTRE BOBBILI |
214 |
PLOT |
23517.0 |
05.81 |
28-MAR-22 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
57 |
GROWTH CENTRE BOBBILI |
215 |
PLOT |
23517.0 |
05.81 |
11-JUN-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
58 |
GROWTH CENTRE BOBBILI |
216 |
PLOT |
23517.0 |
05.81 |
11-JUN-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
59 |
GROWTH CENTRE BOBBILI |
217 |
PLOT |
23517.0 |
05.81 |
11-JUN-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
60 |
GROWTH CENTRE BOBBILI |
218 |
PLOT |
23517.0 |
05.81 |
11-JUN-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
61 |
GROWTH CENTRE BOBBILI |
219 |
PLOT |
23517.0 |
05.81 |
11-JUN-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
62 |
GROWTH CENTRE BOBBILI |
22 |
PLOT |
1952.0 |
00.48 |
04-JAN-21 |
Vacant but Unallottable |
|
63 |
GROWTH CENTRE BOBBILI |
220 |
PLOT |
8094.0 |
02.00 |
11-JUN-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
64 |
GROWTH CENTRE BOBBILI |
221 |
PLOT |
16188.0 |
04.00 |
11-JUN-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
65 |
GROWTH CENTRE BOBBILI |
222 |
PLOT |
18300.0 |
04.52 |
11-JUN-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
66 |
GROWTH CENTRE BOBBILI |
223 |
PLOT |
15000.0 |
03.71 |
11-JUN-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
67 |
GROWTH CENTRE BOBBILI |
224 |
PLOT |
15000.0 |
03.71 |
11-JUN-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
68 |
GROWTH CENTRE BOBBILI |
225 |
PLOT |
15000.0 |
03.71 |
11-JUN-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
69 |
GROWTH CENTRE BOBBILI |
226 |
PLOT |
25320.0 |
06.26 |
11-JUN-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
70 |
GROWTH CENTRE BOBBILI |
227 |
PLOT |
25320.0 |
06.26 |
11-JUN-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
71 |
GROWTH CENTRE BOBBILI |
231 |
PLOT |
25320.0 |
06.26 |
11-JUN-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
72 |
GROWTH CENTRE BOBBILI |
232 |
PLOT |
25320.0 |
06.26 |
11-JUN-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
73 |
GROWTH CENTRE BOBBILI |
246 |
PLOT |
20000.0 |
04.94 |
20-JUN-24 |
Vacant but Unallottable |
The Allotment of M/s Decibels Electronics Pvt ltd was cancelled and deed of cancellation was executed and refund under process |
74 |
GROWTH CENTRE BOBBILI |
247_A |
PLOT |
20000.0 |
04.94 |
20-JUN-24 |
Vacant but Unallottable |
The Allotment of M/s Decibels Electronics Pvt ltd was cancelled and deed of cancellation was executed and refund under process |
75 |
GROWTH CENTRE BOBBILI |
260 |
PLOT |
10500.0 |
02.59 |
31-JUL-23 |
Vacant but Unallottable |
The Allotment of M/s Charan Agro tech was cancelled due to Non Implementation of the Unit and Plot resumed on 3.7.2023. |
76 |
GROWTH CENTRE BOBBILI |
261_A |
PLOT |
10500.0 |
02.59 |
31-JUL-23 |
Vacant but Unallottable |
The Allotment of M/s Charan Agro tech was cancelled due to Non Implementation of the Unit and Plot resumed on 3.7.2023. |
77 |
GROWTH CENTRE BOBBILI |
263_B |
PLOT |
10654.0 |
02.63 |
07-APR-16 |
Vacant |
|
78 |
GROWTH CENTRE BOBBILI |
265_B |
PLOT |
1513.0 |
00.37 |
08-FEB-23 |
Vacant but Unallottable |
|
79 |
GROWTH CENTRE BOBBILI |
27 |
PLOT |
1500.0 |
00.37 |
18-AUG-20 |
Vacant |
|
80 |
GROWTH CENTRE BOBBILI |
274_B |
PLOT |
1513.0 |
00.37 |
03-JUN-22 |
Vacant but Unallottable |
Plot Allotted and submitted to Government for approval/ratification |
81 |
GROWTH CENTRE BOBBILI |
28 |
PLOT |
1500.0 |
00.37 |
19-APR-21 |
Vacant |
|
82 |
GROWTH CENTRE BOBBILI |
280_D |
PLOT |
920.0 |
00.23 |
12-DEC-22 |
Vacant but Unallottable |
|
83 |
GROWTH CENTRE BOBBILI |
280_E |
PLOT |
920.0 |
00.23 |
20-JUN-24 |
Vacant but Unallottable |
The allotment of M/s. Nigama Industries was cancelled and the Plot was resumed on 24.12.21 and Cancellation deed to be executed |
84 |
GROWTH CENTRE BOBBILI |
280_F |
PLOT |
920.0 |
00.23 |
15-MAR-22 |
Vacant |
|
85 |
GROWTH CENTRE BOBBILI |
280_F1 |
PLOT |
1491.0 |
00.37 |
09-APR-22 |
Vacant |
|
86 |
GROWTH CENTRE BOBBILI |
281_B |
PLOT |
920.0 |
00.23 |
18-DEC-23 |
Vacant |
|
87 |
GROWTH CENTRE BOBBILI |
281_D |
PLOT |
920.0 |
00.23 |
18-JAN-16 |
Vacant |
|
88 |
GROWTH CENTRE BOBBILI |
281_E |
PLOT |
920.0 |
00.23 |
18-JAN-16 |
Vacant |
|
89 |
GROWTH CENTRE BOBBILI |
283_F |
PLOT |
920.0 |
00.23 |
20-JUN-24 |
Vacant but Unallottable |
The allotment of M/s. Sri Venkaeswara Engg Works was cancelled and the Plot was resumed on 24-Dec-2021 and Cancellation deed to be executed |
90 |
GROWTH CENTRE BOBBILI |
284_D |
PLOT |
801.14 |
00.20 |
20-JUN-24 |
Vacant but Unallottable |
The Allotment of M/s. Naidu Marbles was cancelled on 31.5.2022 and resumed on 24.5.2024 and the Unit holder requested for Restoration |
91 |
GROWTH CENTRE BOBBILI |
285_A |
PLOT |
920.0 |
00.23 |
20-JUN-24 |
Vacant but Unallottable |
The allotment of M/s Pravarsha Fal G Bricks was cancelled and the Plot was resumed on 29.1.2022 and Cancellation deed to be executed |
92 |
GROWTH CENTRE BOBBILI |
285_B |
PLOT |
920.0 |
00.23 |
20-JUN-24 |
Vacant but Unallottable |
The allotment of M/s Vasavi Industries was cancelled and the Plot was resumed on 22.12.2023 and Cancellation deed to be executed |
93 |
GROWTH CENTRE BOBBILI |
285_C |
PLOT |
920.0 |
00.23 |
12-DEC-22 |
Vacant but Unallottable |
|
94 |
GROWTH CENTRE BOBBILI |
285_F |
PLOT |
920.0 |
00.23 |
10-OCT-19 |
Vacant |
|
95 |
GROWTH CENTRE BOBBILI |
286_C |
PLOT |
920.0 |
00.23 |
18-JAN-16 |
Vacant |
|
96 |
GROWTH CENTRE BOBBILI |
286_C1 |
PLOT |
920.0 |
00.23 |
18-JAN-16 |
Vacant |
|
97 |
GROWTH CENTRE BOBBILI |
286_C2 |
PLOT |
920.0 |
00.23 |
20-JUN-24 |
Vacant but Unallottable |
The allotment of M/s Chaitanya Techno Products was cancelled and the Plot was resumed on 20-Nov-2021 and Cancellation deed to be executed |
98 |
GROWTH CENTRE BOBBILI |
286_D |
PLOT |
920.0 |
00.23 |
09-FEB-23 |
Vacant |
|
99 |
GROWTH CENTRE BOBBILI |
286_E |
PLOT |
920.0 |
00.23 |
18-JAN-16 |
Vacant |
|
100 |
GROWTH CENTRE BOBBILI |
286_F1 |
PLOT |
920.0 |
00.23 |
18-JAN-16 |
Vacant |
|
101 |
GROWTH CENTRE BOBBILI |
287_C |
PLOT |
920.0 |
00.23 |
20-JUN-24 |
Vacant but Unallottable |
The allotment of M/s. Lalitha General Engg was cancelled and the Plot was resumed on 26-Dec-2021 and Cancellation deed to be executed |
102 |
GROWTH CENTRE BOBBILI |
288_A |
PLOT |
920.0 |
00.23 |
31-MAR-21 |
Vacant |
|
103 |
GROWTH CENTRE BOBBILI |
288_E |
PLOT |
920.0 |
00.23 |
20-JUN-24 |
Vacant but Unallottable |
The allotment of M/s. Yaaco Industries was cancelled and the Plot was resumed on 29.1.22 and Cancellation deed to be executed |
104 |
GROWTH CENTRE BOBBILI |
288_F |
PLOT |
920.0 |
00.23 |
12-DEC-22 |
Vacant but Unallottable |
|
105 |
GROWTH CENTRE BOBBILI |
289_D |
PLOT |
920.0 |
00.23 |
18-JAN-16 |
Vacant |
|
106 |
GROWTH CENTRE BOBBILI |
32 |
PLOT |
1500.0 |
00.37 |
18-DEC-23 |
Vacant but Unallottable |
|
107 |
GROWTH CENTRE BOBBILI |
34 |
PLOT |
1500.0 |
00.37 |
01-MAR-21 |
Vacant |
|
108 |
GROWTH CENTRE BOBBILI |
369 |
PLOT |
23517.0 |
05.81 |
12-MAY-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
109 |
GROWTH CENTRE BOBBILI |
370 |
PLOT |
23517.0 |
05.81 |
12-MAY-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
110 |
GROWTH CENTRE BOBBILI |
371 |
PLOT |
23517.0 |
05.81 |
12-MAY-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
111 |
GROWTH CENTRE BOBBILI |
372 |
PLOT |
4977.0 |
01.23 |
12-MAY-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
112 |
GROWTH CENTRE BOBBILI |
373 |
PLOT |
5463.0 |
01.35 |
12-MAY-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
113 |
GROWTH CENTRE BOBBILI |
374 |
PLOT |
23517.0 |
05.81 |
12-MAY-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
114 |
GROWTH CENTRE BOBBILI |
375 |
PLOT |
23517.0 |
05.81 |
12-MAY-21 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
115 |
GROWTH CENTRE BOBBILI |
376 |
PLOT |
23517.0 |
05.81 |
28-MAR-22 |
Vacant |
|
116 |
GROWTH CENTRE BOBBILI |
377 |
PLOT |
23517.0 |
05.81 |
28-MAR-22 |
Vacant |
|
117 |
GROWTH CENTRE BOBBILI |
378 |
PLOT |
4600.0 |
01.14 |
28-MAR-22 |
Vacant |
|
118 |
GROWTH CENTRE BOBBILI |
379 |
PLOT |
6400.0 |
01.58 |
28-MAR-22 |
Vacant |
|
119 |
GROWTH CENTRE BOBBILI |
380 |
PLOT |
6400.0 |
01.58 |
28-MAR-22 |
Vacant |
|
120 |
GROWTH CENTRE BOBBILI |
381 |
PLOT |
6400.0 |
01.58 |
28-MAR-22 |
Vacant |
|
121 |
GROWTH CENTRE BOBBILI |
385 |
PLOT |
6400.0 |
01.58 |
28-MAR-22 |
Vacant |
|
122 |
GROWTH CENTRE BOBBILI |
386 |
PLOT |
6400.0 |
01.58 |
28-MAR-22 |
Vacant |
|
123 |
GROWTH CENTRE BOBBILI |
387 |
PLOT |
4600.0 |
01.14 |
04-JAN-21 |
Vacant |
|
124 |
GROWTH CENTRE BOBBILI |
388 |
PLOT |
23517.0 |
05.81 |
09-APR-22 |
Vacant |
|
125 |
GROWTH CENTRE BOBBILI |
389 |
PLOT |
16000.0 |
03.95 |
16-APR-21 |
Vacant |
|
126 |
GROWTH CENTRE BOBBILI |
390 |
PLOT |
16000.0 |
03.95 |
16-APR-21 |
Vacant |
|
127 |
GROWTH CENTRE BOBBILI |
391 |
PLOT |
16000.0 |
03.95 |
28-MAR-22 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
128 |
GROWTH CENTRE BOBBILI |
392 |
PLOT |
16000.0 |
03.95 |
28-MAR-22 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
129 |
GROWTH CENTRE BOBBILI |
393 |
PLOT |
23926.0 |
05.91 |
28-MAR-22 |
Vacant |
Proposed for Allotment to M/s Jindal Indial Limited |
130 |
GROWTH CENTRE BOBBILI |
44 |
PLOT |
1500.0 |
00.37 |
18-DEC-23 |
Vacant but Unallottable |
|
131 |
GROWTH CENTRE BOBBILI |
58 |
PLOT |
1520.0 |
00.38 |
18-DEC-23 |
Vacant |
|
132 |
GROWTH CENTRE BOBBILI |
59 |
PLOT |
1454.16 |
00.36 |
20-JUN-24 |
Vacant but Unallottable |
Allotment of M/s NEERAJA FOOD PRODUCTS was cancelled on 12.9.2011 and resumed on 13.3.2024 and report submitted to Head Office on 18.4.24. |
133 |
GROWTH CENTRE BOBBILI |
60 |
PLOT |
1454.16 |
00.36 |
20-JUN-24 |
Vacant but Unallottable |
Allotment of M/s NEERAJA FOOD PRODUCTS was cancelled on 12.9.2011 and resumed on 13.3.2024 and report submitted to Head Office on 18.4.24. |
134 |
GROWTH CENTRE BOBBILI |
7 |
PLOT |
21540.0 |
05.32 |
18-JAN-16 |
Vacant |
|
135 |
GROWTH CENTRE BOBBILI |
72 |
PLOT |
1500.0 |
00.37 |
27-AUG-20 |
Vacant |
|
136 |
GROWTH CENTRE BOBBILI |
88 |
PLOT |
1539.5 |
00.38 |
20-JUN-24 |
Vacant but Unallottable |
The Allotment of M/s. Sri Rama Hume Pipes Industry was cancelled on 30.11.2021 and Plot was resumed on 3.8.203 and court case |
137 |
GROWTH CENTRE BOBBILI |
99 |
PLOT |
1500.0 |
00.37 |
01-SEP-22 |
Vacant but Unallottable |
Allotment of M/s. Venkateswara Plastics was cancelled on 24-Aug-2022 due to Non Implemenntation of the Unit |
138 |
GROWTH CENTRE BOBBILI |
SPL_2 |
PLOT |
35290.0 |
08.72 |
18-JAN-16 |
Vacant |
|
1203499.0999999999 |
297.40 |