|  S.No  |  DISTRICT  |  ZONE  |  INDUSTRIAL PARK  |  PLOT NO  |  ALLOTMENT NUMBER  |  NAME OF THE INDUSTRY  |  ALLOTMENT DATE  |  PROVISIONAL ALLOTMENT DATE  |  DATE OF PHYSICAL POSSESSION  |  ALLOTMENT VALUE  |  REBATE AMOUNT  |  NET ALLOTMENT VALUE  |  PAID AMOUNT BY ENT  |  BALANCE AMOUNT  |  STATUS OF ALLOTMENT  |  CANCELLATION  |  CANCELLATION DATE  |  CATEGORY OF ALLOTMENT  |  EXTENT IN SQM  |  IMPLEMENTATION STATUS  |  IMPLEMENTATION DUE DATE  |  EOT PERIOD  |  DCP DATE  |  NOTICE ISSUED DATE  |  IMPL ZM REMARKS  |  ALLOTMENT AGE IN DAYS  |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
VISAKHAPATNAM |
Visakhapatnam |
AN_BLOCK_F |
PLOT 58 |
12704 |
JEY KEY ENGINEERING WORKS |
29-JUL-2022 |
29-JUL-2022 |
30-AUG-2010 |
2,322,810.00
|
500,000.00 |
1,822,810.00 |
1,822,810.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
923 |
G2 - Trail Production |
31-MAR-2025 |
- |
- |
- |
'APIIC has allotted the plots and the allottees have constructed the buildings and implemented their units.
Subsequently, the VUDA has approved the layout excluding the land in Sy. No. 21, which is classified as ?Cheruvu?.In view of the above problems, this office is not in a position to approve the building plan and execution of sale deed even though the allottee have implemented the unit. |
1529 |
2 |
VISAKHAPATNAM |
Visakhapatnam |
AN_BLOCK_F |
PLOT 47 |
46403 |
M/s. Esroja Constructions |
23-MAY-2022 |
23-MAY-2022 |
06-JUN-2022 |
15,093,691.00
|
1,000,000.00 |
14,093,691.00 |
4,011,502.00 |
10,082,189.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
1448 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
03-FEB-2026 |
- |
Unit implemented |
1596 |
3 |
VISAKHAPATNAM |
Visakhapatnam |
MIE SHED BLOCK-D |
MIE PLOT NO. 33 |
48304 |
AMEENA INDUSTRIES |
08-JUL-2022 |
08-JUL-2022 |
18-OCT-2016 |
972,720.00
|
486,360.00 |
486,360.00 |
351,895.00 |
134,465.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
193 |
G2 - Trail Production |
31-MAR-2025 |
- |
- |
- |
Unit is implemented and working, allottee has to be paid land cost as per GO No.7
|
1550 |
4 |
VISAKHAPATNAM |
Visakhapatnam |
MIE SHED BLOCK-D |
MIE PLOT NO. 39 |
48306 |
SHYAM INDUSTRIES |
29-JUL-2022 |
29-JUL-2022 |
15-JUL-2016 |
972,720.00
|
486,360.00 |
486,360.00 |
30.00 |
486,330.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
193 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
19-MAR-2019 |
23-JUL-2022 |
Implemented and Working, |
1529 |
5 |
VISAKHAPATNAM |
Visakhapatnam |
MIE SHED BLOCK-D |
MIE PLOT NO. 21,22 |
48303 |
M/s BHARGAVA ENTERPRISES |
29-JUL-2022 |
29-JUL-2022 |
22-FEB-2016 |
1,186,718.00
|
593,359.00 |
593,359.00 |
255.00 |
593,104.00 |
Sale Agreement(Lease Deed) |
Court Case |
- |
SC |
236 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
WP No.11252/2016 filed by another applicant M/s.Vashnavi Enterprises against the existing allottee and APIIC
|
1529 |
6 |
VISAKHAPATNAM |
Visakhapatnam |
MIE SHED BLOCK-D |
MIE PLOT NO. 43 |
48312 |
SRI SAI HYDRAULIC |
07-NOV-2022 |
07-NOV-2022 |
26-MAY-2016 |
1,719,900.00
|
- |
- |
0.00 |
1,719,900.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
382 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
18-APR-2019 |
01-JUL-2022 |
Implemented and working, |
1428 |
7 |
VISAKHAPATNAM |
Visakhapatnam |
MIE SHED BLOCK-D |
MIE PLOT NO. 45 |
48316 |
M/S. SHAURYA CASTINGS& ENGINEERING WORKS |
08-JUL-2022 |
08-JUL-2022 |
29-MAR-2016 |
1,719,900.00
|
- |
- |
645,123.00 |
1,074,777.00 |
Sale Deed |
- |
- |
SC |
342 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
17-NOV-2018 |
- |
Unit implemented and working. |
1550 |
8 |
VISAKHAPATNAM |
Visakhapatnam |
MIE SHED BLOCK-D |
MIE PLOT NO. 28,MIE PLOT NO. 29 |
48301 |
ASHOK INDUSTRIES |
08-JUL-2022 |
08-JUL-2022 |
07-APR-2016 |
2,373,437.00
|
- |
- |
296,680.00 |
2,076,757.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
472 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
18-FEB-2019 |
04-MAY-2019 |
Unit is implemented and working, allottee has to be paid land cost as per GO No.7
|
1550 |
9 |
VISAKHAPATNAM |
Visakhapatnam |
MIE SHED BLOCK-D |
MIE PLOT NO. 25,MIE PLOT NO. 26 |
48311 |
SIMAGE DUTHA SERVICES |
29-JUL-2022 |
29-JUL-2022 |
17-FEB-2016 |
2,373,437.00
|
1,186,719.00 |
1,186,718.00 |
0.00 |
1,186,718.00 |
Sale Deed |
Notice Issued |
- |
ST |
472 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
14-NOV-2017 |
15-JUN-2022 |
Implemented the unit and DCP not submitted. |
1529 |
10 |
VISAKHAPATNAM |
Visakhapatnam |
AN_BLOCK_F |
PLOT NO. 61A |
49659 |
M/S. K. R. MARINE ENGINEERING WORKS |
08-JUL-2022 |
08-JUL-2022 |
23-MAR-2017 |
13,254,561.00
|
2,000,000.00 |
11,254,561.00 |
5,108,970.00 |
6,145,591.00 |
Sale Agreement(Lease Deed) |
- |
- |
ST |
2346 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
17-JUL-2019 |
- |
Unit is implemented and working, allottee has to be paid land cost as per GO No.7
|
1550 |
11 |
VISAKHAPATNAM |
Visakhapatnam |
AN_BLOCK_F |
PLOT NO. 61B |
54400 |
M/s. T.G. ENTERPRISES |
07-JUL-2022 |
07-JUL-2022 |
13-MAR-2018 |
5,706,211.00
|
2,000,000.00 |
3,706,211.00 |
2,202,093.00 |
1,504,118.00 |
Sale Deed |
- |
- |
ST |
902 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
01-MAR-2021 |
- |
Unit is implemented and working,
|
1551 |
12 |
VISAKHAPATNAM |
Visakhapatnam |
AN_BLOCK_D(EXPN) |
PLOT NO. 76D |
57649 |
SRI VENKATESWARA MANUFACTURERS |
30-SEP-2022 |
30-SEP-2022 |
10-OCT-2019 |
9,757,270.00
|
2,000,000.00 |
7,757,270.00 |
7,960,176.00 |
0.00 |
Sale Deed |
Notice Issued |
- |
SC |
1377 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
01-NOV-2024 |
04-JUL-2022 |
Unit implemented and working. |
1466 |
13 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-50 |
43712 |
M/s. Venkata Sai Lakshmi Industries, Proptx: P. Vijaya Lakshmi |
08-JUL-2022 |
08-JUL-2022 |
10-JAN-2014 |
3,588,284.00
|
- |
- |
0.00 |
3,588,284.00 |
Sale Deed |
Notice Issued |
- |
SC_W |
1282 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
25-APR-2024 |
04-APR-2019 |
"The allottee has implemented the unit and working. |
1550 |
14 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-61 |
43706 |
M/s. KRA Pet Bottles, Proptx: K. Aruna Kumari |
08-JUL-2022 |
08-JUL-2022 |
01-NOV-2013 |
2,797,200.00
|
932,307.00 |
1,864,893.00 |
1,278,363.00 |
586,530.00 |
Sale Agreement(Lease Deed) |
- |
- |
ST_W |
999 |
G2 - Trail Production |
31-MAR-2025 |
- |
- |
04-APR-2019 |
Unit is implemented and working, allottee has to be paid land cost as per GO No.7
|
1550 |
15 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-57 |
43708 |
M/s. Navdeep Engineering Works, Prop: K. Kotaiah |
08-JUL-2022 |
08-JUL-2022 |
14-NOV-2013 |
2,797,200.00
|
932,307.00 |
1,864,893.00 |
2,959,052.00 |
0.00 |
Sale Deed |
- |
- |
SC |
999 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
10-JUN-2015 |
- |
"The allottee has implemented the unit and working.
|
1550 |
16 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-55 |
43700 |
M/s. Industrial Engineering Services, Proptx: Smt. T. Rajeswari |
08-JUL-2022 |
08-JUL-2022 |
20-NOV-2013 |
2,862,160.00
|
- |
- |
0.00 |
2,862,160.00 |
Sale Deed |
- |
- |
ST_W |
1023 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
17-DEC-2016 |
- |
Implemented and working
and Sale Deed to be executed |
1550 |
17 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-47 |
43709 |
M/s. Pavan Industries, Prop: V. Satyanandam |
08-JUL-2022 |
08-JUL-2022 |
14-NOV-2013 |
4,210,920.00
|
1,000,000.00 |
3,210,920.00 |
2,341,541.00 |
869,379.00 |
Sale Deed |
- |
- |
SC |
1504 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
28-APR-2025 |
- |
Unit is implemented and working, |
1550 |
18 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-17 |
46967 |
M/s. Tatapudi Industries |
08-JUL-2022 |
08-JUL-2022 |
04-JUL-2015 |
4,347,640.00
|
1,000,000.00 |
3,347,640.00 |
0.00 |
3,347,640.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC_W |
1061 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
18-FEB-2017 |
- |
Unit is implemented and working, allottee has to be paid land cost as per GO No.7
|
1550 |
19 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-78 |
47442 |
M/s. Continuum Packaging |
08-JUL-2022 |
08-JUL-2022 |
09-SEP-2016 |
4,428,000.00
|
- |
- |
1,198,236.00 |
3,229,764.00 |
Sale Deed |
- |
- |
SC |
1080 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
07-MAR-2023 |
04-MAY-2019 |
Unit is implemented and working |
1550 |
20 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-76 |
47445 |
USHA INDUSTRIES |
08-JUL-2022 |
08-JUL-2022 |
27-APR-2016 |
4,428,000.00
|
2,000,000.00 |
2,428,000.00 |
920,000.00 |
1,508,000.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC_W |
1080 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
27-NOV-2023 |
10-DEC-2020 |
"The allottee has implemented the unit and working. |
1550 |
21 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-74 |
47446 |
NAVARATNA ENGINEERING INDUSTRY |
07-JUL-2022 |
07-JUL-2022 |
09-SEP-2016 |
4,428,000.00
|
2,000,000.00 |
2,428,000.00 |
1,734,178.00 |
693,822.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
1080 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
25-OCT-2018 |
04-MAY-2019 |
Unit is implemented and working, allottee has to be paid land cost as per GO No.7
|
1551 |
22 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NOS-84&85 |
47601 |
M/s R P PLASTIC RECYCLING |
07-JUL-2022 |
07-JUL-2022 |
17-MAY-2016 |
2,464,715.00
|
1,232,358.00 |
1,232,357.00 |
446,528.00 |
785,829.00 |
Sale Deed |
- |
- |
SC |
602 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
18-APR-2018 |
- |
"The allottee has implemented the unit and working.Sale Deed executed
|
1551 |
23 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-13 |
48298 |
DEEPAK ENTERPRISES |
08-JUL-2022 |
08-JUL-2022 |
22-JUN-2016 |
3,788,400.00
|
1,894,200.00 |
1,894,200.00 |
1,539,701.00 |
354,499.00 |
Sale Deed |
- |
- |
SC_W |
924 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
10-FEB-2022 |
08-DEC-2021 |
"The allottee has implemented the unit and working." |
1550 |
24 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-92 |
48976 |
M/s.Vensraj Technologies Private Limited |
07-JUL-2022 |
07-JUL-2022 |
30-DEC-2016 |
4,428,000.00
|
2,000,000.00 |
2,428,000.00 |
1,858,833.00 |
569,167.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
1080 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
26-FEB-2026 |
04-APR-2019 |
Implemented and working
|
1551 |
25 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-81 |
49259 |
S V R INDUSTRIES |
08-JUL-2022 |
08-JUL-2022 |
27-FEB-2017 |
4,968,000.00
|
2,000,000.00 |
2,968,000.00 |
2,078,315.00 |
889,685.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
1080 |
G2 - Trail Production |
31-MAR-2025 |
- |
- |
10-DEC-2020 |
Unit is implemented and working, allottee has to be paid land cost as per GO No.7
|
1550 |
26 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-83 |
49399 |
M/s. Surya Pneumatic Technologies |
07-JUL-2022 |
07-JUL-2022 |
22-DEC-2016 |
4,344,010.00
|
2,000,000.00 |
2,344,010.00 |
595,023.00 |
1,748,987.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
945 |
G2 - Trail Production |
31-MAR-2025 |
- |
- |
04-MAY-2019 |
Unit is implemented and working, allottee has to be paid land cost as per GO No.7
|
1551 |
27 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
C-1 |
53100 |
M/s. Bhagya Lakshmi Apparels & Ware Housing Services |
07-JUL-2022 |
07-JUL-2022 |
09-FEB-2018 |
6,904,485.00
|
2,000,000.00 |
4,904,485.00 |
1,251,879.00 |
3,652,606.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
1001 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
06-FEB-2023 |
04-MAY-2019 |
Unit implemented but DCP is not submitted. |
1551 |
28 |
VISAKHAPATNAM |
Visakhapatnam |
INDL.PARK_GAMBHEERAM |
PLOT NO. 4 |
40861 |
PADMAVATHI FABRICATION INDUSTRIES |
29-JUL-2022 |
29-JUL-2022 |
23-JUN-2014 |
4,458,440.00
|
2,000,000.00 |
2,458,440.00 |
0.00 |
2,458,440.00 |
Sale Agreement(Lease Deed) |
- |
- |
ST |
1593 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
17-MAR-2020 |
As per Go Ms No.07 Re allotment ordwers were issued. Allottee was within stipulated time for implementation of the unit.
|
1529 |
29 |
VISAKHAPATNAM |
Visakhapatnam |
INDL.PARK_GAMBHEERAM |
PLOT NO. 5A |
46370 |
PARAMESWARI STEEL PRODUCTS |
29-JUL-2022 |
29-JUL-2022 |
03-NOV-2016 |
3,048,320.00
|
1,524,160.00 |
1,524,160.00 |
0.00 |
1,524,160.00 |
Sale Deed |
- |
- |
SC |
866 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
27-JAN-2022 |
08-APR-2019 |
IMPLEMENTED AND WORKING |
1529 |
30 |
VISAKHAPATNAM |
Visakhapatnam |
INDL.PARK_GAMBHEERAM |
PLOT NO. 10 |
46537 |
BHANOJI ASSOCIATES |
29-JUL-2022 |
29-JUL-2022 |
11-MAY-2017 |
7,977,446.00
|
1,000,000.00 |
6,977,446.00 |
0.00 |
6,977,446.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
2267 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
20-JUL-2020 |
As per Go Ms No.07 Re allotment ordwers were issued. Allottee was within stipulated time for implementation of the unit.
|
1529 |
31 |
VISAKHAPATNAM |
Visakhapatnam |
INDL.PARK_GAMBHEERAM |
PLOT NO. 46,PLOT NO. 47A |
46968 |
M/s. Neelaveni Industries |
21-MAR-2024 |
21-MAR-2024 |
05-DEC-2024 |
16,784,908.00
|
1,000,000.00 |
15,784,908.00 |
2,350,800.00 |
13,434,108.00 |
Sale Agreement(Lease Deed) |
NA |
- |
SC |
2879.6 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement executed and possession handed over to company. |
928 |
32 |
VISAKHAPATNAM |
Visakhapatnam |
INDL.PARK_GAMBHEERAM |
PLOT NO. 11B |
47449 |
M/s. Jeevan Jyothi Enterprises |
29-JUL-2022 |
29-JUL-2022 |
24-AUG-2016 |
7,075,560.00
|
2,000,000.00 |
5,075,560.00 |
2,155,643.00 |
2,919,917.00 |
Sale Deed |
- |
- |
ST_W |
2011 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
07-MAY-2025 |
12-JUN-2020 |
Implemented and Working |
1529 |
33 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
173 |
58377 |
Palaparthi |
29-JUL-2022 |
29-JUL-2022 |
- |
716,100.00
|
358,050.00 |
358,050.00 |
475,800.00 |
0.00 |
Final Allotment |
NA |
27-MAY-19 |
ST |
300 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
As per Go Ms No.07 Re allotment ordwers were issued on 02.08.2022. Allottee yet to pay the land cost.
|
1529 |
34 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
37 |
58263 |
N.R.ENTERPRISES |
29-JUL-2022 |
29-JUL-2022 |
20-OCT-2023 |
766,227.00
|
383,114.00 |
383,113.00 |
1,052,450.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
321 |
G2 - Trail Production |
31-MAR-2025 |
- |
- |
- |
Sale Agreement executed and Possession handed over to Company. |
1529 |
35 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
42 |
58328 |
SMILY INDUSTRIES |
29-JUL-2022 |
29-JUL-2022 |
20-OCT-2023 |
780,549.00
|
390,275.00 |
390,274.00 |
679,906.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
355 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
- |
Civil works are under progress |
1529 |
36 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
36 |
58349 |
LIKHITHA |
29-JUL-2022 |
29-JUL-2022 |
04-JAN-2020 |
837,837.00
|
418,919.00 |
418,918.00 |
473,290.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
296.85 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
17-AUG-2023 |
The allottee is within stipulated time for implementation of the Project. |
1529 |
37 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
31 |
58378 |
LOKESH MACHINE TOOLS |
29-JUL-2022 |
29-JUL-2022 |
17-SEP-2021 |
866,481.00
|
433,241.00 |
433,240.00 |
830,294.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
363 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
29-JUL-2026 |
16-SEP-2023 |
Implemented and working |
1529 |
38 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
25 |
58374 |
M/s R P PLASTIC RECYCLING |
29-JUL-2022 |
29-JUL-2022 |
04-JAN-2020 |
1,021,636.00
|
510,818.00 |
510,818.00 |
660,918.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
416.7 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
29-MAY-2024 |
04-JUL-2022 |
The allottee is within stipulated time for implementation of the Project.
|
1529 |
39 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
35 |
58309 |
JMJ HYDRAULICS, PROP. SOMBARKI RAJESH |
29-JUL-2022 |
29-JUL-2022 |
04-JAN-2020 |
1,040,732.00
|
520,366.00 |
520,366.00 |
599,508.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
377.9 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
04-SEP-2023 |
The allottee is within stipulated time for implementation of the Project.
|
1529 |
40 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
32 |
58291 |
A S INDUSTRIES |
29-JUL-2022 |
29-JUL-2022 |
26-JUN-2020 |
1,575,420.00
|
787,710.00 |
787,710.00 |
950,618.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
415.05 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
05-JUL-2022 |
The allottee is within stipulated time for implementation of the Project.
|
1529 |
41 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
45 |
58325 |
RATNA ENGINEERING CONSTRUCTIONS |
29-JUL-2022 |
29-JUL-2022 |
- |
2,114,882.00
|
1,057,441.00 |
1,057,441.00 |
300,000.00 |
757,441.00 |
Provisional Allotment |
- |
- |
SC |
886 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
As per Go Ms No.07 Re allotment ordwers were issued on 02.08.2022. Allottee yet to pay the land cost.
|
1529 |
42 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
29 |
58370 |
M/S. Bharat Energy Systems |
29-JUL-2022 |
29-JUL-2022 |
04-NOV-2024 |
2,885,883.00
|
1,203,774.00 |
1,682,109.00 |
1,203,774.00 |
478,335.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
425 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
- |
Sale Agreement executed and Possession handed over to Company |
1529 |
43 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
41 |
58375 |
SS Industries |
29-JUL-2022 |
29-JUL-2022 |
04-AUG-2026 |
751,905.00
|
375,953.00 |
375,952.00 |
751,905.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
315 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Possession handed over to company |
1529 |
44 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
39 |
58367 |
Essess Industries |
29-JUL-2022 |
29-JUL-2022 |
04-AUG-2026 |
1,785,476.00
|
892,738.00 |
892,738.00 |
480,796.00 |
411,942.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
386 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Possession handed over to company |
1529 |
45 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
12 |
58380 |
M/s. S. V. R. INDUSTRIES |
29-JUL-2022 |
29-JUL-2022 |
18-NOV-2021 |
2,009,854.00
|
1,004,927.00 |
1,004,927.00 |
1,024,600.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
ST |
445 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
04-OCT-2023 |
The allottee is within stipulated time for implementation of the Project.
|
1529 |
46 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
27,28 |
58382 |
ALLCO TECH |
29-JUL-2022 |
29-JUL-2022 |
25-AUG-2021 |
3,060,134.00
|
1,530,067.00 |
1,530,067.00 |
2,025,713.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
1269.05 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
04-SEP-2023 |
EOT sanctioned up to 07.01.2027 under GO MS No 7 |
1529 |
47 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
20,21 |
58369 |
Sri Sai Maruthi Village Foods |
29-JUL-2022 |
29-JUL-2022 |
21-SEP-2026 |
1,615,999.00
|
808,000.00 |
807,999.00 |
1,615,999.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
- |
ST_W |
783 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement executed and Possession handed over to company
|
1529 |
48 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
14,15 |
59784 |
PERFECT CEMENTS |
29-JUL-2022 |
29-JUL-2022 |
20-OCT-2023 |
1,885,730.00
|
942,865.00 |
942,865.00 |
1,674,981.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
- |
ST |
790 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement executed and Possession handed over to Company. |
1529 |
49 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
26 |
60995 |
UMA BHARATHI INDUSTRIES |
29-JUL-2022 |
29-JUL-2022 |
08-JUL-2020 |
1,214,983.00
|
607,492.00 |
607,491.00 |
807,170.00 |
0.00 |
Sale Deed |
Notice Issued |
- |
SC |
509 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
27-JUL-2025 |
17-OCT-2023 |
Sale Deed executed |
1529 |
50 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
38 |
61006 |
VIVEK ENTERPRISES |
29-JUL-2022 |
29-JUL-2022 |
06-DEC-2021 |
1,255,562.00
|
627,781.00 |
627,781.00 |
834,019.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
526 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
05-JUL-2022 |
The allottee is within stipulated time for implementation of the Project and civil works are under progress
|
1529 |
51 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
16,18 |
61025 |
SRI VENKATESWARA ENGINEERING |
29-JUL-2022 |
29-JUL-2022 |
07-OCT-2021 |
2,659,118.00
|
1,329,559.00 |
1,329,559.00 |
1,815,721.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
ST |
1114 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
26-JAN-2026 |
16-SEP-2023 |
Implemented and working |
1529 |
52 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
162 |
61016 |
GRACE ENTERPRISES |
29-JUL-2022 |
29-JUL-2022 |
02-FEB-2024 |
716,100.00
|
0.00 |
716,100.00 |
952,600.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
- |
General |
300 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
25-JUL-2022 |
Possession handed over to company.
|
1529 |