|  S.No  |  DISTRICT  |  ZONE  |  INDUSTRIAL PARK  |  PLOT NO  |  ALLOTMENT NUMBER  |  NAME OF THE INDUSTRY  |  ALLOTMENT DATE  |  PROVISIONAL ALLOTMENT DATE  |  DATE OF PHYSICAL POSSESSION  |  ALLOTMENT VALUE  |  REBATE AMOUNT  |  NET ALLOTMENT VALUE  |  PAID AMOUNT BY ENT  |  BALANCE AMOUNT  |  STATUS OF ALLOTMENT  |  CANCELLATION  |  CANCELLATION DATE  |  CATEGORY OF ALLOTMENT  |  EXTENT IN SQM  |  IMPLEMENTATION STATUS  |  IMPLEMENTATION DUE DATE  |  EOT PERIOD  |  DCP DATE  |  NOTICE ISSUED DATE  |  IMPL ZM REMARKS  |  ALLOTMENT AGE IN DAYS  |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/166 |
50379 |
RADHAMADHAV ENTERPRISES |
17-JAN-2023 |
17-JAN-2023 |
- |
1,657,408.00
|
- |
- |
178.00 |
1,657,230.00 |
Provisional Allotment |
NA |
21-MAY-18 |
SC_W |
752 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
Reallotment under YSR JBVM.Land cost not paid |
1358 |
2 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._23/16 |
54838 |
M/S SNEHA INDUSTRIES |
09-JUL-2022 |
09-JUL-2022 |
- |
204,000.00
|
102,000.00 |
102,000.00 |
0.00 |
102,000.00 |
Cancelled |
NA |
31-MAY-24 |
SC_W |
500 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
Cancelled Allotment |
1550 |
3 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/205 |
54796 |
M/s GOODWILL INDUSTRIES |
09-JUL-2022 |
09-JUL-2022 |
- |
204,816.00
|
102,408.00 |
102,408.00 |
0.00 |
102,408.00 |
Provisional Allotment |
NA |
08-JUN-18 |
SC |
502 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
Reallotment under YSR JBVM.Land cost not paid |
1550 |
4 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/81,PLOT NO._10/82 |
54753 |
Nishanam Feeds |
28-DEC-2022 |
28-DEC-2022 |
02-AUG-2025 |
410,448.00
|
204,408.00 |
206,040.00 |
204,408.00 |
1,632.00 |
Sale Agreement(Lease Deed) |
NA |
11-OCT-19 |
SC |
1006 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement(Lease Deed) |
1378 |
5 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/46,PLOT NO._18/47 |
54627 |
SUVASTHRA APPARELS |
08-JUN-2023 |
08-JUN-2023 |
- |
1,224,000.00
|
820,896.00 |
403,104.00 |
0.00 |
403,104.00 |
Provisional Allotment |
NA |
08-JUN-18 |
SC |
3000 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
Reallotment Under YSR JBVM |
1216 |
6 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._5/39 |
55903 |
KOMARAGIRI BHASKARA RAO |
31-JUL-2022 |
31-JUL-2022 |
26-MAY-2026 |
820,896.00
|
408,000.00 |
412,896.00 |
408,000.00 |
4,896.00 |
Sale Agreement(Lease Deed) |
- |
- |
ST |
2012 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
SA |
1528 |
7 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/18 |
55300 |
M/s. HSC CONSTRUCTIONS |
28-DEC-2022 |
28-DEC-2022 |
- |
836,400.00
|
408,816.00 |
427,584.00 |
0.00 |
427,584.00 |
Provisional Allotment |
NA |
29-APR-19 |
SC |
2050 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
Reallotment under YSR JBVM.Land cost not paid |
1378 |
8 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/83,PLOT NO._10/84,PLOT NO._10/85 |
55858 |
M/s. HSC TRADING COMPANY |
28-DEC-2022 |
28-DEC-2022 |
- |
1,233,792.00
|
613,224.00 |
620,568.00 |
2,914.00 |
617,654.00 |
Provisional Allotment |
NA |
08-MAR-18 |
SC |
3024 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
Reallotment under YSR JBVM.Land cost not paid |
1378 |
9 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO_5/76,Plot No_5/76 |
55242 |
ALCHEMY WATER TECHNOLOGIES |
09-JUL-2022 |
09-JUL-2022 |
22-JUL-2025 |
1,632,000.00
|
410,448.00 |
1,221,552.00 |
412,000.00 |
809,552.00 |
Sale Agreement(Lease Deed) |
NA |
21-SEP-19 |
ST |
4000 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
SALE AGREEMENT.REALLOTMENT UNDER GO NO |
1550 |
10 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._9/93,PLOT NO._9/94 |
57007 |
Amaravathi Engineering works |
31-JUL-2022 |
31-JUL-2022 |
29-AUG-2019 |
408,816.00
|
204,000.00 |
204,816.00 |
204,000.00 |
816.00 |
Sale Agreement(Lease Deed) |
Cancelled |
25-JUN-22 |
SC |
1002 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement.Go No 7 YSR JBVM |
1528 |
11 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/86/B |
56687 |
RAVI ENGINEERING & PRE-FABRICATION |
09-JUL-2022 |
09-JUL-2022 |
- |
510,000.00
|
255,000.00 |
255,000.00 |
0.00 |
255,000.00 |
Provisional Allotment |
NA |
18-JUL-18 |
ST |
1250 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
Reallotment of plots in JVB |
1550 |
12 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._23/38 |
60937 |
M/s Anitha Industries |
28-DEC-2022 |
28-DEC-2022 |
- |
1,967,000.00
|
985,467.00 |
981,533.00 |
0.00 |
981,533.00 |
Provisional Allotment |
NA |
09-JUN-20 |
SC |
1000 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
Reallotment under YSR JBVM.Land cost not paid |
1378 |
13 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._17/82 |
60996 |
M/s SRI VARDHAN SAI INDUSTRIES |
09-JUL-2022 |
09-JUL-2022 |
- |
983,500.00
|
491,750.00 |
491,750.00 |
0.00 |
491,750.00 |
Provisional Allotment |
Cancelled |
17-APR-21 |
ST |
500 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
Reallotment under YSR JBVM.Land cost not paid |
1550 |
14 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/35 |
61147 |
AVINASH ENTERPRISES |
09-JUL-2022 |
09-JUL-2022 |
- |
3,442,250.00
|
0.00 |
3,442,250.00 |
0.00 |
3,442,250.00 |
Provisional Allotment |
Cancelled |
17-APR-21 |
SC,Technocrat |
1750 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
YSR JBVM. Land cost not paid |
1550 |
15 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._9/127,PLOT NO._9/128,PLOT NO._9/129 |
61161 |
SAINATH PLASTIC INDUSTRIES |
22-JUL-2022 |
22-JUL-2022 |
- |
2,956,401.00
|
1,478,201.00 |
1,478,200.00 |
0.00 |
1,478,200.00 |
Provisional Allotment |
Cancelled |
09-FEB-21 |
SC |
1503 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
REALLOTMENT UNDER YSR JVBM. Land cost not paid |
1537 |
16 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
MSME-7 |
61491 |
SHIVA ENGINERING WORKS |
18-JAN-2023 |
18-JAN-2023 |
17-FEB-2024 |
1,005,000.00
|
502,500.00 |
502,500.00 |
126,017.00 |
376,483.00 |
Sale Agreement(Lease Deed) |
NA |
23-MAR-20 |
SC |
300 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
- |
Sale Agreement |
1357 |
17 |
VIJAYAWADA |
Krishna |
State Food Park, Mallavalli |
Plot No.11/D |
57091 |
M/s RACHANA FOODS |
04-OCT-2022 |
04-OCT-2022 |
19-JUN-2023 |
5,381,480.00
|
2,000,000.00 |
3,381,480.00 |
1,102.00 |
3,380,378.00 |
Sale Agreement(Lease Deed) |
Cancelled |
29-SEP-18 |
SC_W |
1100 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
Reallotment under GO No 7 YSR JBVM |
1463 |
18 |
VIJAYAWADA |
NTR |
IP-Peddavaram |
249 |
59708 |
RAJARAM INDUSTRIES |
09-JUL-2022 |
09-JUL-2022 |
- |
245,700.00
|
122,850.00 |
122,850.00 |
0.00 |
122,850.00 |
Cancelled |
Cancelled |
14-FEB-23 |
SC |
300 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
Cancelled Allotment |
1550 |
19 |
VIJAYAWADA |
NTR |
IP-Peddavaram |
281,282 |
59712 |
M/S city dhobis |
09-JUL-2022 |
09-JUL-2022 |
- |
491,400.00
|
245,700.00 |
245,700.00 |
0.00 |
245,700.00 |
Provisional Allotment |
Cancelled |
08-NOV-19 |
SC |
600 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
22A REALLOTMENT UNDEYSR JVBM Land cost not paid |
1550 |
20 |
VIJAYAWADA |
NTR |
IP-Peddavaram |
20,21 |
59733 |
SKYSEA e MACHINES |
09-JUL-2022 |
09-JUL-2022 |
- |
491,400.00
|
245,700.00 |
245,700.00 |
0.00 |
245,700.00 |
Provisional Allotment |
Cancelled |
08-NOV-19 |
SC |
600 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
22A REALLOTMENT UNDE NO GO NO 7 |
1550 |
21 |
VIJAYAWADA |
NTR |
IP-Peddavaram |
237 |
59764 |
JP FABRICATION & ENGINEERING WORKS |
09-JUL-2022 |
09-JUL-2022 |
- |
245,700.00
|
122,850.00 |
122,850.00 |
0.00 |
122,850.00 |
Provisional Allotment |
Cancelled |
08-NOV-19 |
SC |
300 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
22 A Re-allotment under YSR JBV |
1550 |
22 |
VIJAYAWADA |
NTR |
IP-Peddavaram |
12 |
61575 |
SEALTECHENINEERS & FABRICATORS |
09-JUL-2022 |
09-JUL-2022 |
- |
245,700.00
|
122,850.00 |
122,850.00 |
0.00 |
122,850.00 |
Provisional Allotment |
Cancelled |
17-APR-21 |
SC |
300 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
22A REALLOTMENT UNDEYSR JVBM Land cost not paid |
1550 |
23 |
VIJAYAWADA |
NTR |
IP_JAGGAIAHPET |
PLOT NO_28 |
58683 |
M/s UNIVERSAL TRADERS |
09-JUL-2022 |
09-JUL-2022 |
- |
2,274,252.00
|
1,137,126.00 |
1,137,126.00 |
0.00 |
1,137,126.00 |
Provisional Allotment |
NA |
07-AUG-12 |
SC |
1750 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
Provisional |
1550 |
24 |
VIJAYAWADA |
NTR |
IP_JAGGAIAHPET |
PLOT NO_28 |
40278 |
UNIVERSAL TRADERS |
09-JUL-2022 |
09-JUL-2022 |
- |
2,100,000.00
|
- |
- |
0.00 |
2,100,000.00 |
Provisional Allotment |
NA |
07-AUG-12 |
SC |
1750 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
GO NO 7 DUBLICTED ENTRY
|
1550 |
25 |
VIJAYAWADA |
NTR |
IP_JAGGAIAHPET |
PLOT NO_167,PLOT NO_167 |
53543 |
Rishi Engineering |
09-JUL-2022 |
09-JUL-2022 |
- |
6,657,000.00
|
1,664,250.00 |
4,992,750.00 |
0.00 |
4,992,750.00 |
Provisional Allotment |
NA |
05-FEB-18 |
SC |
1902 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
Reallotment under Go No 7 JBV |
1550 |
26 |
VIJAYAWADA |
NTR |
IP_JAGGAIAHPET |
PLOT NO_162 |
54885 |
REENA INDUSTRIES |
03-SEP-2022 |
03-SEP-2022 |
- |
3,930,500.00
|
1,965,250.00 |
1,965,250.00 |
491,200.00 |
1,474,050.00 |
Provisional Allotment |
- |
- |
SC |
1123 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
REALLOTMENT UNDER YSR JVBM. Land cost to be paid |
1494 |
27 |
VIJAYAWADA |
NTR |
IP_JAGGAIAHPET |
PLOT NO_159 |
55765 |
SRK FABRICATION WORKS |
09-JUN-2023 |
09-JUN-2023 |
23-OCT-2020 |
3,633,000.00
|
1,816,500.00 |
1,816,500.00 |
453,696.00 |
1,362,804.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
1038 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Reallotment orders issued under YSR JBVM |
1215 |
28 |
VIJAYAWADA |
NTR |
IP_JAGGAIAHPET |
PLOT NO_145-2,PLOT NO_145-2 |
54880 |
NIBA SECURED OFFSET PRINT SOLUTIONS |
17-JAN-2023 |
17-JAN-2023 |
- |
6,748,000.00
|
1,596,000.00 |
5,152,000.00 |
0.00 |
5,152,000.00 |
Provisional Allotment |
NA |
21-APR-18 |
SC |
1928 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
Reallotment under YSR JBVM.Land cost not paid |
1358 |
29 |
VIJAYAWADA |
NTR |
IP_JAGGAIAHPET |
PLOT NO_145-1,PLOT NO_145-1 |
54883 |
BLUE POLYMERS |
17-JAN-2023 |
17-JAN-2023 |
- |
6,825,000.00
|
1,604,750.00 |
5,220,250.00 |
0.00 |
5,220,250.00 |
Provisional Allotment |
NA |
18-APR-18 |
SC |
1950 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
REALLOTMENT UNDER YSR JVBM. Land cost to be paid |
1358 |
30 |
VIJAYAWADA |
NTR |
IP_JAGGAIAHPET |
PLOT NO_163 |
54882 |
ROHITH CNC TECHNOLOGIES |
03-SEP-2022 |
03-SEP-2022 |
- |
3,808,000.00
|
1,904,000.00 |
1,904,000.00 |
480,400.00 |
1,423,600.00 |
Provisional Allotment |
- |
- |
SC |
1088 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
JVBM.Allottee.Balance land cost to be paid |
1494 |
31 |
VIJAYAWADA |
NTR |
IP_JAGGAIAHPET |
PLOT NO_165 |
54881 |
SURYA PLASTIC ENGINEERING |
29-JUL-2024 |
29-JUL-2024 |
- |
4,270,000.00
|
1,785,000.00 |
2,485,000.00 |
0.00 |
2,485,000.00 |
Provisional Allotment |
NA |
21-APR-18 |
SC |
1220 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
Cancelled |
799 |
32 |
VIJAYAWADA |
NTR |
IP_JAGGAIAHPET |
PLOT NO_152-2 |
56002 |
VISION TECHNOLOGIES |
24-JAN-2023 |
24-JAN-2023 |
- |
1,575,000.00
|
787,500.00 |
787,500.00 |
0.00 |
787,500.00 |
Provisional Allotment |
NA |
24-SEP-18 |
SC |
450 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
REALLOTMENT UNDER YSR JVBM. Land cost to be paid |
1351 |
33 |
VIJAYAWADA |
NTR |
IP_JAGGAIAHPET |
PLOT NO_152-1,PLOT NO_152-1 |
56001 |
Madugula Prameela |
18-JAN-2023 |
18-JAN-2023 |
- |
4,788,000.00
|
1,664,250.00 |
3,123,750.00 |
1,664,250.00 |
1,459,500.00 |
Provisional Allotment |
NA |
19-SEP-18 |
SC_W |
1368 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
Reallotment under YSR JBVM.Land cost not paid. |
1357 |
34 |
VIJAYAWADA |
NTR |
IP_JAGGAIAHPET |
PLOT NO_155 |
58463 |
M/S. J S PLASTIC INDUSTRIES |
23-JUL-2022 |
23-JUL-2022 |
19-JAN-2022 |
3,342,500.00
|
1,671,250.00 |
1,671,250.00 |
925,000.00 |
746,250.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
955 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
JVBM Allottee Paid 25% land cost. Allottee requested to reduce the interest on land cost from 16% to 8%.
Allotee is eligible for reduction of interest in terms of circular No.1, dated 08.08.2021, and also interms of G.O.Ms.No.7.Hence, recommended. SALE AGREEMENT |
1536 |