|  S.No  |  DISTRICT  |  ZONE  |  INDUSTRIAL PARK  |  PLOT NO  |  ALLOTMENT NUMBER  |  NAME OF THE INDUSTRY  |  ALLOTMENT DATE  |  PROVISIONAL ALLOTMENT DATE  |  DATE OF PHYSICAL POSSESSION  |  ALLOTMENT VALUE  |  REBATE AMOUNT  |  NET ALLOTMENT VALUE  |  PAID AMOUNT BY ENT  |  BALANCE AMOUNT  |  STATUS OF ALLOTMENT  |  CANCELLATION  |  CANCELLATION DATE  |  CATEGORY OF ALLOTMENT  |  EXTENT IN SQM  |  IMPLEMENTATION STATUS  |  IMPLEMENTATION DUE DATE  |  EOT PERIOD  |  DCP DATE  |  NOTICE ISSUED DATE  |  IMPL ZM REMARKS  |  ALLOTMENT AGE IN DAYS  |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
VISAKHAPATNAM |
Visakhapatnam |
AN_BLOCK_F |
PLOT 47 |
46403 |
M/s. Esroja Constructions |
23-MAY-2022 |
23-MAY-2022 |
06-JUN-2022 |
15,093,691.00
|
1,000,000.00 |
14,093,691.00 |
4,011,502.00 |
10,082,189.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
1448 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
03-FEB-2026 |
- |
Unit implemented |
1596 |
2 |
VISAKHAPATNAM |
Visakhapatnam |
MIE SHED BLOCK-D |
MIE PLOT NO. 33 |
48304 |
AMEENA INDUSTRIES |
08-JUL-2022 |
08-JUL-2022 |
18-OCT-2016 |
972,720.00
|
486,360.00 |
486,360.00 |
351,895.00 |
134,465.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
193 |
G2 - Trail Production |
31-MAR-2025 |
- |
- |
- |
Unit is implemented and working, allottee has to be paid land cost as per GO No.7
|
1550 |
3 |
VISAKHAPATNAM |
Visakhapatnam |
MIE SHED BLOCK-D |
MIE PLOT NO. 39 |
48306 |
SHYAM INDUSTRIES |
29-JUL-2022 |
29-JUL-2022 |
15-JUL-2016 |
972,720.00
|
486,360.00 |
486,360.00 |
30.00 |
486,330.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
193 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
19-MAR-2019 |
23-JUL-2022 |
Implemented and Working, |
1529 |
4 |
VISAKHAPATNAM |
Visakhapatnam |
MIE SHED BLOCK-D |
MIE PLOT NO. 21,22 |
48303 |
M/s BHARGAVA ENTERPRISES |
29-JUL-2022 |
29-JUL-2022 |
22-FEB-2016 |
1,186,718.00
|
593,359.00 |
593,359.00 |
255.00 |
593,104.00 |
Sale Agreement(Lease Deed) |
Court Case |
- |
SC |
236 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
WP No.11252/2016 filed by another applicant M/s.Vashnavi Enterprises against the existing allottee and APIIC
|
1529 |
5 |
VISAKHAPATNAM |
Visakhapatnam |
MIE SHED BLOCK-D |
MIE PLOT NO. 43 |
48312 |
SRI SAI HYDRAULIC |
07-NOV-2022 |
07-NOV-2022 |
26-MAY-2016 |
1,719,900.00
|
- |
- |
0.00 |
1,719,900.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
382 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
18-APR-2019 |
01-JUL-2022 |
Implemented and working, |
1428 |
6 |
VISAKHAPATNAM |
Visakhapatnam |
MIE SHED BLOCK-D |
MIE PLOT NO. 45 |
48316 |
M/S. SHAURYA CASTINGS& ENGINEERING WORKS |
08-JUL-2022 |
08-JUL-2022 |
29-MAR-2016 |
1,719,900.00
|
- |
- |
645,123.00 |
1,074,777.00 |
Sale Deed |
- |
- |
SC |
342 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
17-NOV-2018 |
- |
Unit implemented and working. |
1550 |
7 |
VISAKHAPATNAM |
Visakhapatnam |
MIE SHED BLOCK-D |
MIE PLOT NO. 28,MIE PLOT NO. 29 |
48301 |
ASHOK INDUSTRIES |
08-JUL-2022 |
08-JUL-2022 |
07-APR-2016 |
2,373,437.00
|
- |
- |
296,680.00 |
2,076,757.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
472 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
18-FEB-2019 |
04-MAY-2019 |
Unit is implemented and working, allottee has to be paid land cost as per GO No.7
|
1550 |
8 |
VISAKHAPATNAM |
Visakhapatnam |
MIE SHED BLOCK-D |
MIE PLOT NO. 25,MIE PLOT NO. 26 |
48311 |
SIMAGE DUTHA SERVICES |
29-JUL-2022 |
29-JUL-2022 |
17-FEB-2016 |
2,373,437.00
|
1,186,719.00 |
1,186,718.00 |
0.00 |
1,186,718.00 |
Sale Deed |
Notice Issued |
- |
ST |
472 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
14-NOV-2017 |
15-JUN-2022 |
Implemented the unit and DCP not submitted. |
1529 |
9 |
VISAKHAPATNAM |
Visakhapatnam |
AN_BLOCK_F |
PLOT NO. 61A |
49659 |
M/S. K. R. MARINE ENGINEERING WORKS |
08-JUL-2022 |
08-JUL-2022 |
23-MAR-2017 |
13,254,561.00
|
2,000,000.00 |
11,254,561.00 |
5,108,970.00 |
6,145,591.00 |
Sale Agreement(Lease Deed) |
- |
- |
ST |
2346 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
17-JUL-2019 |
- |
Unit is implemented and working, allottee has to be paid land cost as per GO No.7
|
1550 |
10 |
VISAKHAPATNAM |
Visakhapatnam |
AN_BLOCK_F |
PLOT NO. 61B |
54400 |
M/s. T.G. ENTERPRISES |
07-JUL-2022 |
07-JUL-2022 |
13-MAR-2018 |
5,706,211.00
|
2,000,000.00 |
3,706,211.00 |
2,202,093.00 |
1,504,118.00 |
Sale Deed |
- |
- |
ST |
902 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
01-MAR-2021 |
- |
Unit is implemented and working,
|
1551 |
11 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-50 |
43712 |
M/s. Venkata Sai Lakshmi Industries, Proptx: P. Vijaya Lakshmi |
08-JUL-2022 |
08-JUL-2022 |
10-JAN-2014 |
3,588,284.00
|
- |
- |
0.00 |
3,588,284.00 |
Sale Deed |
Notice Issued |
- |
SC_W |
1282 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
25-APR-2024 |
04-APR-2019 |
"The allottee has implemented the unit and working. |
1550 |
12 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-61 |
43706 |
M/s. KRA Pet Bottles, Proptx: K. Aruna Kumari |
08-JUL-2022 |
08-JUL-2022 |
01-NOV-2013 |
2,797,200.00
|
932,307.00 |
1,864,893.00 |
1,278,363.00 |
586,530.00 |
Sale Agreement(Lease Deed) |
- |
- |
ST_W |
999 |
G2 - Trail Production |
31-MAR-2025 |
- |
- |
04-APR-2019 |
Unit is implemented and working, allottee has to be paid land cost as per GO No.7
|
1550 |
13 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-55 |
43700 |
M/s. Industrial Engineering Services, Proptx: Smt. T. Rajeswari |
08-JUL-2022 |
08-JUL-2022 |
20-NOV-2013 |
2,862,160.00
|
- |
- |
0.00 |
2,862,160.00 |
Sale Deed |
- |
- |
ST_W |
1023 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
17-DEC-2016 |
- |
Implemented and working
and Sale Deed to be executed |
1550 |
14 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-47 |
43709 |
M/s. Pavan Industries, Prop: V. Satyanandam |
08-JUL-2022 |
08-JUL-2022 |
14-NOV-2013 |
4,210,920.00
|
1,000,000.00 |
3,210,920.00 |
2,341,541.00 |
869,379.00 |
Sale Deed |
- |
- |
SC |
1504 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
28-APR-2025 |
- |
Unit is implemented and working, |
1550 |
15 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-17 |
46967 |
M/s. Tatapudi Industries |
08-JUL-2022 |
08-JUL-2022 |
04-JUL-2015 |
4,347,640.00
|
1,000,000.00 |
3,347,640.00 |
0.00 |
3,347,640.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC_W |
1061 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
18-FEB-2017 |
- |
Unit is implemented and working, allottee has to be paid land cost as per GO No.7
|
1550 |
16 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-78 |
47442 |
M/s. Continuum Packaging |
08-JUL-2022 |
08-JUL-2022 |
09-SEP-2016 |
4,428,000.00
|
- |
- |
1,198,236.00 |
3,229,764.00 |
Sale Deed |
- |
- |
SC |
1080 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
07-MAR-2023 |
04-MAY-2019 |
Unit is implemented and working |
1550 |
17 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-76 |
47445 |
USHA INDUSTRIES |
08-JUL-2022 |
08-JUL-2022 |
27-APR-2016 |
4,428,000.00
|
2,000,000.00 |
2,428,000.00 |
920,000.00 |
1,508,000.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC_W |
1080 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
27-NOV-2023 |
10-DEC-2020 |
"The allottee has implemented the unit and working. |
1550 |
18 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-74 |
47446 |
NAVARATNA ENGINEERING INDUSTRY |
07-JUL-2022 |
07-JUL-2022 |
09-SEP-2016 |
4,428,000.00
|
2,000,000.00 |
2,428,000.00 |
1,734,178.00 |
693,822.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
1080 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
25-OCT-2018 |
04-MAY-2019 |
Unit is implemented and working, allottee has to be paid land cost as per GO No.7
|
1551 |
19 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NOS-84&85 |
47601 |
M/s R P PLASTIC RECYCLING |
07-JUL-2022 |
07-JUL-2022 |
17-MAY-2016 |
2,464,715.00
|
1,232,358.00 |
1,232,357.00 |
446,528.00 |
785,829.00 |
Sale Deed |
- |
- |
SC |
602 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
18-APR-2018 |
- |
"The allottee has implemented the unit and working.Sale Deed executed
|
1551 |
20 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-13 |
48298 |
DEEPAK ENTERPRISES |
08-JUL-2022 |
08-JUL-2022 |
22-JUN-2016 |
3,788,400.00
|
1,894,200.00 |
1,894,200.00 |
1,539,701.00 |
354,499.00 |
Sale Deed |
- |
- |
SC_W |
924 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
10-FEB-2022 |
08-DEC-2021 |
"The allottee has implemented the unit and working." |
1550 |
21 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-92 |
48976 |
M/s.Vensraj Technologies Private Limited |
07-JUL-2022 |
07-JUL-2022 |
30-DEC-2016 |
4,428,000.00
|
2,000,000.00 |
2,428,000.00 |
1,858,833.00 |
569,167.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
1080 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
26-FEB-2026 |
04-APR-2019 |
Implemented and working
|
1551 |
22 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-81 |
49259 |
S V R INDUSTRIES |
08-JUL-2022 |
08-JUL-2022 |
27-FEB-2017 |
4,968,000.00
|
2,000,000.00 |
2,968,000.00 |
2,078,315.00 |
889,685.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
1080 |
G2 - Trail Production |
31-MAR-2025 |
- |
- |
10-DEC-2020 |
Unit is implemented and working, allottee has to be paid land cost as per GO No.7
|
1550 |
23 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-83 |
49399 |
M/s. Surya Pneumatic Technologies |
07-JUL-2022 |
07-JUL-2022 |
22-DEC-2016 |
4,344,010.00
|
2,000,000.00 |
2,344,010.00 |
595,023.00 |
1,748,987.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
945 |
G2 - Trail Production |
31-MAR-2025 |
- |
- |
04-MAY-2019 |
Unit is implemented and working, allottee has to be paid land cost as per GO No.7
|
1551 |
24 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
C-1 |
53100 |
M/s. Bhagya Lakshmi Apparels & Ware Housing Services |
07-JUL-2022 |
07-JUL-2022 |
09-FEB-2018 |
6,904,485.00
|
2,000,000.00 |
4,904,485.00 |
1,251,879.00 |
3,652,606.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
1001 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
06-FEB-2023 |
04-MAY-2019 |
Unit implemented but DCP is not submitted. |
1551 |
25 |
VISAKHAPATNAM |
Visakhapatnam |
INDL.PARK_GAMBHEERAM |
PLOT NO. 4 |
40861 |
PADMAVATHI FABRICATION INDUSTRIES |
29-JUL-2022 |
29-JUL-2022 |
23-JUN-2014 |
4,458,440.00
|
2,000,000.00 |
2,458,440.00 |
0.00 |
2,458,440.00 |
Sale Agreement(Lease Deed) |
- |
- |
ST |
1593 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
17-MAR-2020 |
As per Go Ms No.07 Re allotment ordwers were issued. Allottee was within stipulated time for implementation of the unit.
|
1529 |
26 |
VISAKHAPATNAM |
Visakhapatnam |
INDL.PARK_GAMBHEERAM |
PLOT NO. 5A |
46370 |
PARAMESWARI STEEL PRODUCTS |
29-JUL-2022 |
29-JUL-2022 |
03-NOV-2016 |
3,048,320.00
|
1,524,160.00 |
1,524,160.00 |
0.00 |
1,524,160.00 |
Sale Deed |
- |
- |
SC |
866 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
27-JAN-2022 |
08-APR-2019 |
IMPLEMENTED AND WORKING |
1529 |
27 |
VISAKHAPATNAM |
Visakhapatnam |
INDL.PARK_GAMBHEERAM |
PLOT NO. 10 |
46537 |
BHANOJI ASSOCIATES |
29-JUL-2022 |
29-JUL-2022 |
11-MAY-2017 |
7,977,446.00
|
1,000,000.00 |
6,977,446.00 |
0.00 |
6,977,446.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
2267 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
20-JUL-2020 |
As per Go Ms No.07 Re allotment ordwers were issued. Allottee was within stipulated time for implementation of the unit.
|
1529 |
28 |
VISAKHAPATNAM |
Visakhapatnam |
INDL.PARK_GAMBHEERAM |
PLOT NO. 46,PLOT NO. 47A |
46968 |
M/s. Neelaveni Industries |
21-MAR-2024 |
21-MAR-2024 |
05-DEC-2024 |
16,784,908.00
|
1,000,000.00 |
15,784,908.00 |
2,350,800.00 |
13,434,108.00 |
Sale Agreement(Lease Deed) |
NA |
- |
SC |
2879.6 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement executed and possession handed over to company. |
928 |
29 |
VISAKHAPATNAM |
Visakhapatnam |
INDL.PARK_GAMBHEERAM |
PLOT NO. 11B |
47449 |
M/s. Jeevan Jyothi Enterprises |
29-JUL-2022 |
29-JUL-2022 |
24-AUG-2016 |
7,075,560.00
|
2,000,000.00 |
5,075,560.00 |
2,155,643.00 |
2,919,917.00 |
Sale Deed |
- |
- |
ST_W |
2011 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
07-MAY-2025 |
12-JUN-2020 |
Implemented and Working |
1529 |
30 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
45 |
58325 |
RATNA ENGINEERING CONSTRUCTIONS |
29-JUL-2022 |
29-JUL-2022 |
- |
2,114,882.00
|
1,057,441.00 |
1,057,441.00 |
300,000.00 |
757,441.00 |
Provisional Allotment |
- |
- |
SC |
886 |
R3 - Land Allotted |
31-MAR-2025 |
- |
- |
- |
As per Go Ms No.07 Re allotment ordwers were issued on 02.08.2022. Allottee yet to pay the land cost.
|
1529 |
31 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
29 |
58370 |
M/S. Bharat Energy Systems |
29-JUL-2022 |
29-JUL-2022 |
04-NOV-2024 |
2,885,883.00
|
1,203,774.00 |
1,682,109.00 |
1,203,774.00 |
478,335.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
425 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
- |
Sale Agreement executed and Possession handed over to Company |
1529 |
32 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
39 |
58367 |
Essess Industries |
29-JUL-2022 |
29-JUL-2022 |
04-AUG-2026 |
1,785,476.00
|
892,738.00 |
892,738.00 |
480,796.00 |
411,942.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
386 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Possession handed over to company |
1529 |