S.No  |  DISTRICT  |  ZONE  |  INDUSTRIAL PARK  |  PLOT NO  |  ALLOTMENT NUMBER  |  NAME OF THE INDUSTRY  |  ALLOTMENT DATE  |  PROVISIONAL ALLOTMENT DATE  |  DATE OF PHYSICAL POSSESSION  |  ALLOTMENT VALUE  |  REBATE AMOUNT  |  NET ALLOTMENT VALUE  |  PAID AMOUNT BY ENT  |  BALANCE AMOUNT  |  STATUS OF ALLOTMENT  |  CANCELLATION  |  CATEGORY OF ALLOTMENT  |  EXTENT IN SQM  |  IMPLEMENTATION STATUS  |  IMPLEMENTATION DUE DATE  |  EOT PERIOD  |  DCP DATE  |  NOTICE ISSUED DATE  |  IMPL ZM REMARKS  |  ALLOTMENT AGE IN DAYS  |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
ANAKAPALLI |
Anakapalli |
IDA_PARAWADA |
PLOT NO-47B |
49440 |
M/s GREESHMA PROJECTS |
30-JUL-2022 |
30-JUL-2022 |
21-SEP-2016 |
3,509,462.00
|
810,649.00 |
2,698,813.00 |
2,812,524.00 |
-113,711.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
1245 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
04-APR-2019 |
Allotment restored |
636 |
2 |
ANAKAPALLI |
Anakapalli |
IP_ATCHUTAPURAM_DenotifiedArea |
23 I(DenotifiedArea |
43986 |
OXYGENECA LABS PRIVATE LIMITED |
14-JUL-2022 |
14-JUL-2022 |
20-MAR-2014 |
14,327,566.00
|
1,000,000.00 |
13,327,566.00 |
13,327,566.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
ST |
16190 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
- |
CONSTURCTION UNDER PROCESS |
652 |
3 |
ANAKAPALLI |
Anakapalli |
IP_ATCHUTAPURAM_DenotifiedArea |
27A21 |
53801 |
RK SYSTEMS |
14-JUL-2022 |
14-JUL-2022 |
09-FEB-2018 |
5,220,000.00
|
2,000,000.00 |
3,220,000.00 |
3,249,540.00 |
-29,540.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
3000 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
14-FEB-2023 |
Civil works commenced |
652 |
4 |
ANAKAPALLI |
Anakapalli |
IP_ATCHUTAPURAM_DenotifiedArea |
27A |
53802 |
SP CIRCUITS |
15-JUL-2022 |
15-JUL-2022 |
09-FEB-2018 |
5,220,000.00
|
2,000,000.00 |
3,220,000.00 |
3,249,540.00 |
-29,540.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC_W |
3000 |
G3 - Machinery Erected |
31-MAR-2025 |
- |
- |
13-FEB-2023 |
At the time of site visit no activity in site. |
651 |
5 |
ANAKAPALLI |
Anakapalli |
IP_PARAWADA_PH_III |
16 F |
60935 |
M/s. SSR ENGINEERING INDUSTRY |
15-JUL-2022 |
15-JUL-2022 |
- |
17,986,050.00
|
2,000,000.00 |
15,986,050.00 |
16,536,400.00 |
-550,350.00 |
Provisional Allotment |
NA |
ST |
4050 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
Provisional Re-allotment orders in terms of G.O.Ms.No.7, Inds & Comm.(Infra) Dept. Dt:05.02.2022. |
651 |
6 |
GUNTUR |
Guntur |
AN_GUNTUR_PHASE_IV |
P NO_193 B NO_22G |
43520 |
YENUBERA DEVADANAM |
12-JUL-2022 |
12-JUL-2022 |
21-MAY-2014 |
94,282.00
|
31,424.00 |
62,858.00 |
62,858.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
29 |
G2 - Trail Production |
31-MAR-2025 |
- |
- |
24-MAY-2018 |
Working Unit |
654 |
7 |
GUNTUR |
Guntur |
AN_GUNTUR_PHASE_IV |
P NO_12 B NO_23B |
43512 |
KANCHERLA MARY VARA PRASAD |
12-JUL-2022 |
12-JUL-2022 |
07-JUL-2015 |
140,448.00
|
46,811.00 |
93,637.00 |
93,637.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
42 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
29-MAY-2018 |
Within the stipulated time as per Go.ms.No.7 EOT up to 31.03.2025 |
654 |
8 |
GUNTUR |
Guntur |
AN_GUNTUR_PHASE_IV |
P NO_6 B NO_23A |
43519 |
MALLAVARAPU CHANDRA SEKHAR |
12-JUL-2022 |
12-JUL-2022 |
18-AUG-2014 |
140,448.00
|
46,811.00 |
93,637.00 |
93,637.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
42 |
G2 - Trail Production |
31-MAR-2025 |
- |
- |
12-JUL-2022 |
Project Not Working
|
654 |
9 |
GUNTUR |
Guntur |
AN_GUNTUR_PHASE_IV |
P NO_478 B NO_22S |
43531 |
KOMMALAPATI KIRAN BABU |
12-JUL-2022 |
12-JUL-2022 |
07-JUL-2015 |
140,448.00
|
46,811.00 |
93,637.00 |
93,637.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
42 |
G2 - Trail Production |
31-MAR-2025 |
- |
- |
23-MAY-2018 |
Due to lack of Proper Infrastructure.
Re Allotment orders have given ,as it comes under the G.O.Ms.No.7.
|
654 |
10 |
GUNTUR |
Guntur |
AN_GUNTUR_PHASE_IV |
P NO_367 B NO_22M |
44788 |
Mani Kumar Spray Painting |
12-JUL-2022 |
12-JUL-2022 |
01-AUG-2014 |
112,240.00
|
37,410.00 |
74,830.00 |
78,500.00 |
-3,670.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
29 |
G2 - Trail Production |
31-MAR-2025 |
- |
- |
23-MAY-2018 |
EOT ISSUED AS PER GO.MS.NO.7 UPTO 31.03.2025 |
654 |
11 |
GUNTUR |
Guntur |
AN_GUNTUR_PHASE_IV |
P NO_363 B NO_22M |
44789 |
M/s SANDEEP WATER SERVICING |
12-JUL-2022 |
12-JUL-2022 |
01-AUG-2014 |
112,240.00
|
37,410.00 |
74,830.00 |
74,830.00 |
0.00 |
Cancelled & Restored |
Notice Issued |
SC |
29 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
21-MAY-2019 |
Re Allotment orders have given ,as it comes under the G.O.Ms.No.7. |
654 |
12 |
GUNTUR |
Guntur |
AN_GUNTUR_PHASE_IV |
P NO_364 B NO_22M |
44790 |
Sri Devi Engineering Works |
12-JUL-2022 |
12-JUL-2022 |
27-SEP-2014 |
112,240.00
|
37,410.00 |
74,830.00 |
74,830.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
29 |
G2 - Trail Production |
31-MAR-2025 |
- |
- |
23-MAY-2018 |
Shed Contructed and Machinery erected |
654 |
13 |
GUNTUR |
Guntur |
AN_GUNTUR_PHASE_IV |
P NO_365 B NO_22M |
44791 |
M/s Murali Auto Repair & Servicing and Gates & Shutters |
04-JUL-2022 |
04-JUL-2022 |
12-OCT-2023 |
112,240.00
|
37,410.00 |
74,830.00 |
74,830.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
29 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
02-AUG-2019 |
Possession has been handed over to Allottee. |
662 |
14 |
GUNTUR |
Guntur |
AN_GUNTUR_PHASE_IV |
P NO_366 B NO_22M |
44792 |
Salman Raju Auto Repair & Servicing and Gates & Shutters |
12-JUL-2022 |
12-JUL-2022 |
01-AUG-2014 |
112,240.00
|
37,410.00 |
74,830.00 |
74,830.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
29 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
24-MAY-2018 |
Due to non implementation of the Unit |
654 |
15 |
GUNTUR |
Palnadu |
IP_NADIKUDI_PH-II |
PLOT NO_9C |
41695 |
Manohar Polymers |
12-JUL-2022 |
12-JUL-2022 |
06-JUN-2012 |
354,200.00
|
118,055.00 |
236,145.00 |
237,900.00 |
-1,755.00 |
Cancelled & Restored |
Cancelled |
SC |
1012 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
- |
This allotment has covered under G.O.Ms no 7 ,so issued an Extenstion of time under the YSR Jagananna Badugu Vikasam". |
654 |
16 |
KADAPA |
YSR |
YSR JAGANANNA MEGA INDUST. HUB |
Plot No 32E,Plot No.32D |
58045 |
Anjee Chemicals |
27-JUL-2022 |
27-JUL-2022 |
18-APR-2019 |
315,000.00
|
771,750.00 |
-456,750.00 |
0.00 |
-456,750.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
600 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
18-NOV-2021 |
Possession handed over to the company |
639 |
17 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
335-A |
46556 |
M/s.Nisanth Drugs & Fertilizers Pvt Ltd |
16-JUL-2022 |
16-JUL-2022 |
17-APR-2011 |
674,400.00
|
224,778.00 |
449,622.00 |
449,622.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
SC |
1686 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Re-allotment order given on 16.07.2022.To be implemented |
650 |
18 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
387_B |
46557 |
M/s.Nisanth Drugs & Fertilizers pvt ltd |
16-JUL-2022 |
16-JUL-2022 |
17-APR-2011 |
1,722,800.00
|
574,209.00 |
1,148,591.00 |
1,148,591.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
SC |
4307 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Re-allotment order given on 16.07.2022.under implementation |
650 |
19 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
387_C |
2913 |
M/s Prasanna Industries |
16-JUL-2022 |
16-JUL-2022 |
23-MAR-2023 |
2,181,500.00
|
500,000.00 |
1,681,500.00 |
1,681,500.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
SC |
4363 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Yet to be implement |
650 |
20 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
CFA-C1 |
28176 |
ALPHA INDUSTRIES |
16-JUL-2022 |
16-JUL-2022 |
25-MAR-2011 |
641,250.00
|
213,729.00 |
427,521.00 |
427,521.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
SC |
855 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Re-allotment order given on 16.07.2022.To be implemented |
650 |
21 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
CFA-C11 |
28154 |
MURFY PRODUCTS |
16-JUL-2022 |
16-JUL-2022 |
26-MAR-2011 |
1,330,500.00
|
443,456.00 |
887,044.00 |
887,044.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
1774 |
G3 - Machinery Erected |
31-MAR-2025 |
- |
- |
10-AUG-2016 |
Shed constructed, machinery to be errected |
650 |
22 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
CFA-C7 |
31131 |
RR PIPES |
16-JUL-2022 |
16-JUL-2022 |
25-AUG-2010 |
1,705,500.00
|
568,443.00 |
1,137,057.00 |
1,137,057.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
SC |
2274 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
- |
Small Shed constructed |
650 |
23 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
C-4,C-5 |
37145 |
M/s.PRIYA POLYMERS |
04-APR-2023 |
04-APR-2023 |
23-APR-2011 |
2,636,250.00
|
878,663.00 |
1,757,587.00 |
1,757,587.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
3516 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
31-MAR-2016 |
Re-allotment order given on 04.04.2023 and the Plot is vacant |
388 |
24 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
500/A |
44687 |
M/s.JAYA BHARTH INDUSTRIES |
16-JUL-2022 |
16-JUL-2022 |
23-DEC-2013 |
1,910,300.00
|
500,000.00 |
1,410,300.00 |
1,410,300.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
SC_W |
3793 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Re-allotment order given on 16.07.2022. To be implemented |
650 |
25 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
500/B |
44688 |
M/s.S.R.INDUSTRIES |
16-JUL-2022 |
16-JUL-2022 |
23-DEC-2013 |
1,973,000.00
|
500,000.00 |
1,473,000.00 |
1,556,700.00 |
-83,700.00 |
Sale Agreement(Lease Deed) |
NA |
SC_W |
3946 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
- |
Base level work constructed |
650 |
26 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
388-B |
29463 |
INDU GRANITES |
16-JUL-2022 |
16-JUL-2022 |
17-MAR-2011 |
2,000,000.00
|
666,600.00 |
1,333,400.00 |
1,333,400.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
SC_W |
4000 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
20-APR-2019 |
- |
Sale Deed to be Executed
|
650 |
27 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
44-B |
37199 |
BHARATH ENGINEERING SERVICES. |
16-JUL-2022 |
16-JUL-2022 |
20-APR-2016 |
1,027,051.00
|
513,449.00 |
513,602.00 |
1,027,051.00 |
-513,449.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
3081 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
31-MAY-2019 |
Re-allotment order given on 16.07.2022.To be implemented |
650 |
28 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
129-A |
41734 |
M/s.Vijaya Granites |
16-JUL-2022 |
16-JUL-2022 |
25-MAR-2023 |
1,026,500.00
|
342,132.00 |
684,368.00 |
684,368.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
SC |
2053 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Yet to be implement |
650 |
29 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
533-A |
42415 |
M/S SRINIVASA INDUSTRIES |
22-OCT-2022 |
22-OCT-2022 |
03-JUN-2023 |
2,660,000.00
|
886,578.00 |
1,773,422.00 |
1,773,422.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
SC |
4750 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Compound wall completed |
552 |
30 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
547 A |
43873 |
M/s.SRI VIJAYA INDUSTRIES |
16-JUL-2022 |
16-JUL-2022 |
01-NOV-2013 |
1,925,840.00
|
641,882.00 |
1,283,958.00 |
1,283,958.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
SC_W |
3439 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
- |
Shed Constructed, machinery to be errected |
650 |
31 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
415/B |
43875 |
M/s.KPS COIR INDUSTRIES |
13-JUL-2022 |
13-JUL-2022 |
03-JUN-2023 |
2,037,672.00
|
679,156.00 |
1,358,516.00 |
1,358,516.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
SC |
3639 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Yet to be implement |
653 |
32 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
492-A |
58997 |
M/s A J Technologies |
13-JUL-2022 |
13-JUL-2022 |
- |
4,033,000.00
|
2,000,000.00 |
2,033,000.00 |
2,296,797.00 |
-263,797.00 |
Final Allotment |
Notice Issued |
SC |
4033 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
15-JUL-2023 |
Sale Agreement to be executed |
653 |
33 |
PRAKASAM |
Prakasam |
IP_SINGARAYAKONDA |
65 |
35400 |
PARVATHAMMA PAPER CUPS |
30-JAN-2024 |
30-JAN-2024 |
02-MAR-2024 |
457,000.00
|
152,138.00 |
304,862.00 |
333,350.00 |
-28,488.00 |
Sale Agreement(Lease Deed) |
NA |
SC |
1828 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
Yet to be implement |
87 |
34 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
58,Plot-47 |
58961 |
J.Muthyalappa |
03-APR-2023 |
03-APR-2023 |
18-OCT-2023 |
439,800.00
|
219,900.00 |
219,900.00 |
219,900.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
SC |
600 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Re Allotment orders issued as per Go Ms No 7.Land Cost paid.Final Allotment orders issued on 31.08.2023.Sale Agreement registered on 18.10.2023 |
389 |
35 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
30 |
58037 |
PAVANI GARMENTS MAKING |
03-AUG-2022 |
03-AUG-2022 |
28-MAR-2023 |
219,900.00
|
109,950.00 |
109,950.00 |
109,950.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
SC |
300 |
G4 - Civil Works Commenced |
31-MAR-2025 |
- |
- |
- |
sale aggrement executed and registerd on 28/03/2023.Approvals obtained.Civil Works Commenced. |
632 |
36 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
Plot-55 |
59179 |
M/s JOSHNIKA GARMENTS |
03-AUG-2022 |
03-AUG-2022 |
28-JUL-2023 |
219,900.00
|
109,950.00 |
109,950.00 |
109,950.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
ST |
300 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Approvals yet to be obtained. |
632 |
37 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
292 |
59292 |
M/S TIRUMALA NATURAL FOOD PRODUCTS |
23-NOV-2022 |
23-NOV-2022 |
16-JUN-2023 |
219,900.00
|
109,950.00 |
109,950.00 |
109,950.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
ST |
300 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
Sale Agreement Executed & registered |
520 |
38 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
102 |
59165 |
M/s GOMINI GARMENTS |
03-AUG-2022 |
03-AUG-2022 |
28-JUL-2023 |
433,203.00
|
216,601.00 |
216,602.00 |
226,204.00 |
-9,602.00 |
Sale Agreement(Lease Deed) |
NA |
ST |
591 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Approvals yet to be obtained. |
632 |
39 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
28A,28B,77A,77B |
60768 |
M/s GANESH GRANITES |
03-AUG-2022 |
03-AUG-2022 |
- |
492,600.00
|
246,300.00 |
246,300.00 |
246,300.00 |
0.00 |
Land Cost Paid |
Notice Issued |
SC |
600 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment Orders issued as per GO Ms.No 7.Land Cost paid. FAO to be issued. |
632 |
40 |
SRIKAKULAM |
Vizianagaram |
GROWTH CENTRE BOBBILI |
256_B,257_B |
33077 |
VICTORIA FERRO ALLOYS PVT. LTD. |
17-AUG-2022 |
17-AUG-2022 |
25-MAR-2015 |
6,475,200.00
|
1,000,000.00 |
5,475,200.00 |
5,610,822.00 |
-135,622.00 |
Sale Agreement(Lease Deed) |
- |
SC_W |
16188 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
22-APR-2023 |
- |
EOT granted upto 31-JUL-2020 and production started As the Allottee belongs to SC covers under Go Ms No 7 |
618 |
41 |
TIRUPATI SPL PROJECTS |
Tirupati |
IP NAIDUPET |
Pl.No.45 (Block-B) |
45183 |
M/s.VIRGINIA ANTICORROSIVE PAINTS |
13-AUG-2022 |
13-AUG-2022 |
26-NOV-2014 |
769,167.00
|
256,363.00 |
512,804.00 |
512,804.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
SC |
1263 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
29-AUG-2022 |
27-AUG-2020 |
Availed GO.No.7 for lease basis to ORS. The unit started its commercial production. The allottee has paid the Balance land cost. Sale Agreement registered. The Allottee has been advised to apply for Sale Deed in online. |
622 |
42 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._23/7 |
54639 |
VARSHA ENGINEERING WORKS |
09-JUL-2022 |
09-JUL-2022 |
25-AUG-2022 |
204,000.00
|
102,000.00 |
102,000.00 |
102,000.00 |
0.00 |
Sale Agreement(Lease Deed) |
Cancelled |
ST_W |
500 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
Reallotted to GO MS No 7 |
657 |
43 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._23/12 |
54788 |
SIRI TOOLS |
31-JUL-2022 |
31-JUL-2022 |
11-OCT-2023 |
204,000.00
|
102,000.00 |
102,000.00 |
102,000.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
SC |
500 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Aggrement |
635 |
44 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/177 |
54789 |
KEERTHI ENGINEERING WORKS |
22-JUL-2022 |
22-JUL-2022 |
- |
204,000.00
|
102,000.00 |
102,000.00 |
102,000.00 |
0.00 |
Final Allotment |
NA |
SC |
500 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
FINAL ALLOTMENT |
644 |
45 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._11/43 |
54754 |
M/s MRD PROJECTS |
27-JUL-2022 |
27-JUL-2022 |
17-JUL-2023 |
204,408.00
|
198,492.00 |
5,916.00 |
198,492.00 |
-192,576.00 |
Sale Agreement(Lease Deed) |
NA |
SC |
501 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
Sale Agreement |
639 |
46 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/99 |
54756 |
Nagalakshmi Enterprises |
08-JUN-2023 |
08-JUN-2023 |
09-FEB-2021 |
204,408.00
|
102,204.00 |
102,204.00 |
102,204.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
501 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
15-NOV-2021 |
Sale agreement executed and registered |
323 |
47 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/203 |
54794 |
M/S DASARATHA & SONS ENTERPRISES |
08-JUN-2023 |
08-JUN-2023 |
27-OCT-2018 |
204,816.00
|
102,408.00 |
102,408.00 |
102,408.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
502 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
10-MAY-2022 |
Sale agt executed and registered |
323 |
48 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/204 |
54795 |
M/S NS ENTERPRISES |
08-JUN-2023 |
08-JUN-2023 |
27-OCT-2018 |
204,816.00
|
102,408.00 |
102,408.00 |
102,408.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC_W |
502 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
10-MAY-2022 |
Sale agreement executed and registered |
323 |
49 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._23/39 |
54843 |
SRI SAINADHA INDUSTRIES |
09-JUL-2022 |
09-JUL-2022 |
25-AUG-2022 |
204,816.00
|
102,408.00 |
102,408.00 |
102,408.00 |
0.00 |
Sale Agreement(Lease Deed) |
Cancelled |
SC_W |
502 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
Sale Agreement |
657 |
50 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/110 |
54625 |
Assi Engineering Works |
08-JUN-2023 |
08-JUN-2023 |
07-FEB-2020 |
205,224.00
|
102,612.00 |
102,612.00 |
102,612.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
503 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
20-MAY-2022 |
Sale agreement executed and registered |
323 |
51 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._22/5 |
54827 |
VARSHA FLY ASH BRICKS |
09-JUL-2022 |
09-JUL-2022 |
25-AUG-2022 |
205,224.00
|
102,612.00 |
102,612.00 |
102,612.00 |
0.00 |
Sale Agreement(Lease Deed) |
Cancelled |
ST_W |
503 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
Reallotted to GO MS No 7 |
657 |
52 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/267 |
54801 |
M/s TECHNO CIRCUITS |
09-JUL-2022 |
09-JUL-2022 |
- |
205,632.00
|
102,816.00 |
102,816.00 |
102,816.00 |
0.00 |
Final Allotment |
NA |
SC |
504 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
Re allotmet on 09-jul-2022 |
657 |
53 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/3 |
54626 |
RAVI PACKAGING INDUSTRIES |
09-JUL-2022 |
09-JUL-2022 |
- |
206,856.00
|
103,428.00 |
103,428.00 |
103,428.00 |
0.00 |
Provisional Allotment |
NA |
SC |
507 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
REALLOTTED UNDER YSR JBVM |
657 |
54 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/91,PLOT NO._10/92 |
54753 |
Nishanam Feeds |
28-DEC-2022 |
28-DEC-2022 |
- |
408,816.00
|
204,408.00 |
204,408.00 |
204,408.00 |
0.00 |
Final Allotment |
NA |
SC |
1002 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
Reallot under YSR JBV |
485 |
55 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._9/122,PLOT NO._9/123 |
54803 |
M/s KRISHNAVENI ENTERPRISES |
31-JUL-2022 |
31-JUL-2022 |
- |
408,816.00
|
204,408.00 |
204,408.00 |
204,476.00 |
-68.00 |
Cancelled |
Cancelled |
SC_W |
1002 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Cancelled Allotment |
635 |
56 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/77,PLOT NO._10/78 |
54749 |
M/S SUJOY ENTERPRISES |
08-JUN-2023 |
08-JUN-2023 |
30-APR-2019 |
410,448.00
|
205,224.00 |
205,224.00 |
205,224.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
1006 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
29-APR-2022 |
Notice issued on 29.05.2022 for EOT
|
323 |
57 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._22/16 |
54799 |
M/s HIMAJA INDUSTRIES UNIT - II |
28-DEC-2022 |
28-DEC-2022 |
- |
410,856.00
|
205,632.00 |
205,224.00 |
209,628.00 |
-4,404.00 |
Provisional Allotment |
NA |
SC_W |
1007 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
YSR JVB Under Category 3 |
485 |
58 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/11 |
54784 |
BHARATHI ENGINEERING WORKS |
10-AUG-2022 |
10-AUG-2022 |
- |
510,000.00
|
255,000.00 |
255,000.00 |
255,000.00 |
0.00 |
Provisional Allotment |
- |
SC |
1250 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
Provisional allotment |
625 |
59 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/94,PLOT NO._10/95 |
54751 |
ARUN RAJ POLY PACKS |
09-JUL-2022 |
09-JUL-2022 |
26-AUG-2023 |
563,040.00
|
281,520.00 |
281,520.00 |
281,520.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
SC |
1380 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Aggrement.REALLOTMENT UNDE NO GO NO 7 |
657 |
60 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._17/10 |
54785 |
sun shine polymers |
09-JUL-2022 |
09-JUL-2022 |
- |
601,800.00
|
300,900.00 |
300,900.00 |
300,900.00 |
0.00 |
Provisional Allotment |
NA |
SC |
1475 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
REALLOTMENT UNDE NO GO NO 7 |
657 |
61 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._23/40 |
54845 |
AMOGHA INDUSTRIES |
08-JUN-2023 |
08-JUN-2023 |
13-MAR-2020 |
613,224.00
|
306,612.00 |
306,612.00 |
306,612.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC_W |
1503 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
29-MAY-2022 |
Sale agreement executed and registered..Under YSR JBVM |
323 |
62 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/60,PLOT NO._10/61,PLOT NO._10/62 |
54630 |
M/s MBK PROJECTS |
23-AUG-2022 |
23-AUG-2022 |
- |
615,672.00
|
307,836.00 |
307,836.00 |
307,836.00 |
0.00 |
Final Allotment |
- |
SC |
1509 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
"JBVM.The alllottee paid the land in full and requested for EOT for a period of 3 years for implementation with out levying penalty.
Recommended for EOT for 3 years from 1st April, 2022 without in terms of G.O.Ms.No.7, clause 7 (Vi)."
|
612 |
63 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/34 |
54791 |
M/S RCB INDUSTRIES |
06-FEB-2024 |
06-FEB-2024 |
16-MAR-2024 |
1,020,000.00
|
510,000.00 |
510,000.00 |
510,000.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
SC |
2500 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Cancelled Allotment |
80 |
64 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/224,PLOT NO._18/225,PLOT NO._18/226,PLOT NO._18/261,PLOT NO._18/262,PLOT NO._18/263 |
54798 |
Smart-Waves Electronics |
03-SEP-2022 |
03-SEP-2022 |
19-JUN-2023 |
1,233,792.00
|
616,896.00 |
616,896.00 |
616,896.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
SC |
3024 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
Sale Agreement |
601 |
65 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._23/5 |
55849 |
MEGHA ENGINEERING INDUSTRY |
31-JUL-2022 |
31-JUL-2022 |
19-OCT-2022 |
204,000.00
|
102,204.00 |
101,796.00 |
102,204.00 |
-408.00 |
Sale Agreement(Lease Deed) |
- |
SC |
500 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
JVBM . Recommended for alloment of alternate plot No. 23/5 measuring 500.00 Sq.Mtrs.
|
635 |
66 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/90 |
55839 |
KARRI CHAKRAVARTHI |
22-JUL-2022 |
22-JUL-2022 |
- |
204,408.00
|
102,204.00 |
102,204.00 |
102,204.00 |
0.00 |
Provisional Allotment |
NA |
SC |
501 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
Reallotment on Go Ms 07 |
644 |
67 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/190 |
55702 |
M/S NITHIN PLASTICS |
23-AUG-2022 |
23-AUG-2022 |
22-SEP-2022 |
204,816.00
|
102,408.00 |
102,408.00 |
102,408.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
ST |
502 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
JVBM.The allottee paid the land cost in full. Pending for execution of slae agreement due to non finalization of land cost. Hence, recommended for execution of sale agreement for the same plots duly giving time of 3 years for implementation of the project. |
612 |
68 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/157 |
55857 |
SHAURYA CASTINGS & ENGINEERING WORKS |
28-DEC-2022 |
28-DEC-2022 |
- |
204,816.00
|
102,408.00 |
102,408.00 |
102,408.00 |
0.00 |
Provisional Allotment |
NA |
SC_W |
502 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
Reserve under YSR JBV |
485 |
69 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/194 |
55864 |
MOGILI ANJANEYULU |
22-JUL-2022 |
22-JUL-2022 |
15-NOV-2022 |
204,816.00
|
102,408.00 |
102,408.00 |
102,508.00 |
-100.00 |
Sale Agreement(Lease Deed) |
Cancelled |
ST |
502 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Reallotment of GO No 7 |
644 |
70 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/45 |
55295 |
VANITHA INDUSTRIES |
09-JUL-2022 |
09-JUL-2022 |
- |
205,224.00
|
102,612.00 |
102,612.00 |
102,612.00 |
0.00 |
Final Allotment |
NA |
SC |
503 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
Reallotted under YSR JBV Under Go No 7 |
657 |
71 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/56 |
55302 |
M/s Ruchi Oil Industries |
31-JUL-2022 |
31-JUL-2022 |
- |
205,224.00
|
102,612.00 |
102,612.00 |
102,612.00 |
0.00 |
Final Allotment |
- |
SC |
503 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
JVBM.The land cost paid by the allottee. The allotted plot covered in Land Acquisition Court dispute. Requested for alternate plot with same estate.
Hence, recommended for allotment of alternate Plot No.10/56 measuring 503.00 Sq.Mtrs. Sale aggrement to be executed. |
635 |
72 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/69 |
55404 |
Surya Mouldings |
22-AUG-2022 |
22-AUG-2022 |
31-JAN-2020 |
205,224.00
|
102,612.00 |
102,612.00 |
102,612.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
SC |
503 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
"JBVM.The alllottee paid the land in full and requested for EOT for a period of 3 years for implementation with out levying penalty.
Recommended for EOT for 3 years from 1st April, 2022 without in terms of G.O.Ms.No.7, clause 7 (Vi)."
|
613 |
73 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/66 |
55626 |
Advanced Plastic |
31-JUL-2022 |
31-JUL-2022 |
- |
205,224.00
|
111,180.00 |
94,044.00 |
111,180.00 |
-17,136.00 |
Cancelled |
Cancelled |
SC_W |
503 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
Cancelled Allotment |
635 |
74 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/57 |
55781 |
UHM ENGINEERING PRODUCTS |
03-SEP-2022 |
03-SEP-2022 |
15-NOV-2022 |
205,224.00
|
102,612.00 |
102,612.00 |
102,612.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
SC |
503 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
Final Allotment |
601 |
75 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._22/3 |
55799 |
SRI BALAJI PLASTIC INDUSTRIES |
09-JUL-2022 |
09-JUL-2022 |
22-SEP-2022 |
205,224.00
|
102,612.00 |
102,612.00 |
102,612.00 |
0.00 |
Sale Agreement(Lease Deed) |
Cancelled |
SC |
503 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
Reallotted to GO MS No 7 |
657 |
76 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/67 |
55850 |
M/s SRINESH INDUSTRIES |
18-JAN-2023 |
18-JAN-2023 |
- |
205,224.00
|
140,556.00 |
64,668.00 |
140,556.00 |
-75,888.00 |
Final Allotment |
NA |
SC_W |
503 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
REALLOTMENT UNDER YSR JVB |
464 |
77 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/108 |
55916 |
M/S HEMA POLYMERS |
09-JUL-2022 |
09-JUL-2022 |
- |
205,224.00
|
102,612.00 |
102,612.00 |
102,612.00 |
0.00 |
Final Allotment |
NA |
ST |
503 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
Reallotment of GO No 07 JBV |
657 |
78 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/217 |
55160 |
Harsha Engineering Works |
23-AUG-2022 |
23-AUG-2022 |
- |
205,632.00
|
102,816.00 |
102,816.00 |
102,816.00 |
0.00 |
Final Allotment |
- |
SC |
504 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
JBVM The allottee paid the land cost in full. Pending for execution of Sale Agreement due to non confirmation of the land cost. Hence, recommended for execution of sale agreement for the same plot duly giving time of 3 years for implementation of the project. |
612 |
79 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/223 |
55852 |
Yoshita castings and Enginneering work |
31-JUL-2022 |
31-JUL-2022 |
- |
205,632.00
|
103,428.00 |
102,204.00 |
103,428.00 |
-1,224.00 |
Provisional Allotment |
- |
SC |
504 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
JVBM. Recommended for allotment of alternate Plot No. 18/223 measuring 504.00 Sq.Mtrs. |
635 |
80 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/6 |
55855 |
RS INDUSTRIES |
17-JAN-2023 |
17-JAN-2023 |
- |
205,632.00
|
117,504.00 |
88,128.00 |
117,504.00 |
-29,376.00 |
Provisional Allotment |
NA |
SC_W |
504 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
Reallotment under YSR JBV G.O Ms No 7 |
465 |
81 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/134 |
55889 |
BHAVANI INDUSTRIES |
09-JUL-2022 |
09-JUL-2022 |
- |
235,008.00
|
117,504.00 |
117,504.00 |
120,904.00 |
-3,400.00 |
Provisional Allotment |
- |
ST_W |
576 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
Reallotmento of the plots in YSR JBV |
657 |
82 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._11/66 |
55269 |
M/s Sonia Trade Lines |
28-DEC-2022 |
28-DEC-2022 |
- |
306,816.00
|
159,732.00 |
147,084.00 |
147,084.00 |
0.00 |
Provisional Allotment |
NA |
SC |
752 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
Reallotment under YSR JBV |
485 |
83 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/186 |
55821 |
M/S HEMA CRANES & HOISTS |
07-SEP-2022 |
07-SEP-2022 |
18-OCT-2022 |
306,816.00
|
197,900.00 |
108,916.00 |
147,900.00 |
-38,984.00 |
Sale Agreement(Lease Deed) |
- |
ST |
752 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
JVBM.The allottee paid the land cost in full. The plot covered in Land Acquisition dispute. |
597 |
84 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/67_1,PLOT NO._10/68 |
55761 |
RAJA RAM INDUSTRIES |
08-JUN-2023 |
08-JUN-2023 |
07-FEB-2020 |
307,224.00
|
153,612.00 |
153,612.00 |
153,612.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC_W |
753 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
29-MAY-2022 |
Sale agt executed and registered..Under YSR JBVM |
323 |
85 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/148,PLOT NO._18/149 |
55853 |
M/s YAMINI STEEL SYNDICATE |
31-JUL-2022 |
31-JUL-2022 |
- |
409,632.00
|
207,264.00 |
202,368.00 |
207,264.00 |
-4,896.00 |
Provisional Allotment |
- |
SC_W |
1004 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
JVBM. Reallotment of alternate Plot Nos.18/148 & 18/149 measuring 1014.00 Sq.Mtrs. |
635 |
86 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._23/51,PLOT NO._23/52 |
55856 |
Fiber Crome Electronics |
28-DEC-2022 |
28-DEC-2022 |
19-JUN-2023 |
409,632.00
|
204,816.00 |
204,816.00 |
204,816.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
SC |
1004 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
Reallotment under YSR JVB |
485 |
87 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/212,PLOT NO._18/213 |
55860 |
SK ENGINEERS |
31-JUL-2022 |
31-JUL-2022 |
- |
409,632.00
|
204,816.00 |
204,816.00 |
204,816.00 |
0.00 |
Provisional Allotment |
- |
SC |
1004 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
Reallotment of GO Ms No 7 |
635 |
88 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/58,PLOT NO._10/59 |
55352 |
M/s Sagar Engineering Enterprises |
09-JUL-2022 |
09-JUL-2022 |
22-SEP-2022 |
410,448.00
|
205,224.00 |
205,224.00 |
205,224.00 |
0.00 |
Sale Agreement(Lease Deed) |
Cancelled |
SC |
1006 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
Reallotment of G.O Ms No.7 in JBV |
657 |
89 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/63,PLOT NO._10/64 |
55854 |
MEGHANA ENGINEERING INDUSTRIES |
08-JUN-2023 |
08-JUN-2023 |
29-FEB-2020 |
410,448.00
|
205,224.00 |
205,224.00 |
205,224.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
1006 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
26-MAY-2022 |
Sale agreement executed and rtegistered |
323 |
90 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/265,PLOT NO._18/266 |
55859 |
JPS Industries |
09-JUL-2022 |
09-JUL-2022 |
15-NOV-2022 |
411,264.00
|
308,448.00 |
102,816.00 |
308,448.00 |
-205,632.00 |
Sale Agreement(Lease Deed) |
Cancelled |
SC |
1008 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
Sale Agreement |
657 |
91 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/164,PLOT NO._18/165 |
55339 |
SAAS Poly Pipes |
01-AUG-2022 |
01-AUG-2022 |
29-FEB-2020 |
613,632.00
|
313,548.00 |
300,084.00 |
320,892.00 |
-20,808.00 |
Sale Agreement(Lease Deed) |
- |
SC |
1504 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
Sale Agreement |
634 |
92 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._23/32 |
55704 |
M/S SNEHA INDUSTRIES |
08-JUN-2023 |
08-JUN-2023 |
18-MAY-2019 |
715,224.00
|
357,612.00 |
357,612.00 |
357,612.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC_W |
1753 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
05-FEB-2021 |
Sale agreement executed and registered .Under YSR JBVM |
323 |
93 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/235,PLOT NO._18/236,PLOT NO._18/237,PLOT NO._18/238 |
55266 |
POORNIMA ENTERPRISES |
31-JUL-2022 |
31-JUL-2022 |
19-JUN-2023 |
817,632.00
|
408,816.00 |
408,816.00 |
408,816.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
SC |
2004 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
Sale Agreement |
635 |
94 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/104,PLOT NO._10/105,PLOT NO._10/106,PLOT NO._10/107 |
55242 |
ALCHEMY WATER TECHNOLOGIES |
09-JUL-2022 |
09-JUL-2022 |
- |
820,896.00
|
410,448.00 |
410,448.00 |
412,000.00 |
-1,552.00 |
Provisional Allotment |
NA |
ST |
2012 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
Reallotment of plots in JVB |
657 |
95 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._17/83 |
56640 |
M/s. Govardhan Sai Metal |
21-AUG-2022 |
21-AUG-2022 |
09-JAN-2019 |
204,000.00
|
102,000.00 |
102,000.00 |
102,000.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
ST |
500 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
12-JUL-2019 |
JBVM.The alllottee paid the land in full and requested for EOT for a period of 3 years for implementation with out levying penalty.
Recommended for EOT for 3 years from 1st April, 2022 without in terms of G.O.Ms.No.7, clause 7 (Vi). |
614 |
96 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/89 |
56624 |
TULASIRAM DISPOSABLE PLASTIC CUP AND PLATES |
23-AUG-2022 |
23-AUG-2022 |
- |
204,408.00
|
102,204.00 |
102,204.00 |
102,408.00 |
-204.00 |
Final Allotment |
- |
ST |
501 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
JBV Reallotment on 23-08-2022.Final Allotment.Sale Agreement to be Executed |
612 |
97 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._23/9 |
56682 |
SRI DURGA BRICKS INDUSTRY |
31-JUL-2022 |
31-JUL-2022 |
- |
306,000.00
|
153,000.00 |
153,000.00 |
153,000.00 |
0.00 |
Provisional Allotment |
- |
ST_W |
750 |
NA - Not Applicable |
31-MAR-2025 |
- |
- |
- |
JVBM The allottee paid the land cost in full. The allotted plot covered in Land Acquisition Court case, the alottee requested for alternate plot No. 22/7 & 22/8 measuring 750.00 Sq.Mtrs, which are not vacant.
Hence, recommended for allotment of alternate plot No .23/9 measuring 750.00 Sq.Mtrs. |
635 |
98 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._9/107 |
57088 |
MOGILI ADDAIAH |
22-JUL-2022 |
22-JUL-2022 |
18-OCT-2022 |
306,000.00
|
153,000.00 |
153,000.00 |
154,000.00 |
-1,000.00 |
Sale Agreement(Lease Deed) |
Cancelled |
ST |
750 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
Sale Agreement |
644 |
99 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._17/85,PLOT NO._17/86,PLOT NO._17/87 |
56680 |
UMADEVI ALUMINUM CASTING |
08-JUN-2023 |
08-JUN-2023 |
07-FEB-2020 |
612,000.00
|
306,000.00 |
306,000.00 |
306,000.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
ST_W |
1500 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
29-MAY-2022 |
Sale agreement executed and registered |
323 |
100 |
VIJAYAWADA |
Krishna |
State Food Park, Mallavalli |
Plot No.12 |
55333 |
M/S AMRUTHA DAIRY AND DAIRY PRODUCTS |
23-AUG-2022 |
23-AUG-2022 |
17-MAY-2019 |
1,210,833.00
|
605,417.00 |
605,416.00 |
605,417.00 |
-1.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
1179 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
30-JUN-2021 |
"JBVM.The alllottee paid the land in full and requested for EOT for a period of 3 years for implementation with out levying penalty.
Recommended for EOT for 3 years from 1st April, 2022 without in terms of G.O.Ms.No.7, clause 7 (Vi)."
|
612 |
101 |
VIJAYAWADA |
Krishna |
State Food Park, Mallavalli |
Plot No.18-A6 |
56720 |
SUDHEERS FOUNDRY WORKS |
08-JUN-2023 |
08-JUN-2023 |
21-MAY-2019 |
523,770.00
|
261,885.00 |
261,885.00 |
261,885.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
510 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
12-JUL-2022 |
Show cause notes issued on 12-07-2022 to apply EOT due to non implementation |
323 |
102 |
VIJAYAWADA |
Krishna |
State Food Park, Mallavalli |
Plot No.8/B |
56980 |
SASI ENTERPRISES |
23-AUG-2022 |
23-AUG-2022 |
14-MAY-2019 |
703,495.00
|
351,748.00 |
351,747.00 |
351,748.00 |
-1.00 |
Sale Agreement(Lease Deed) |
- |
SC |
685 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
- |
Sale agreement executed and registered |
612 |
103 |
VIJAYAWADA |
Krishna |
State Food Park, Mallavalli |
Plot No.16 |
57084 |
DEEPAK ENTERPRISES |
31-JAN-2024 |
31-JAN-2024 |
13-MAR-2020 |
1,377,207.00
|
688,604.00 |
688,603.00 |
688,604.00 |
-1.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC_W |
1341 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
12-JUL-2022 |
Reallotted under GO No 7 |
86 |
104 |
VIJAYAWADA |
Krishna |
State Food Park, Mallavalli |
Plot No.18-A1 |
56703 |
zioncoconut |
22-AUG-2022 |
22-AUG-2022 |
16-MAR-2019 |
465,231.00
|
232,616.00 |
232,615.00 |
232,616.00 |
-1.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
453 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
02-MAY-2019 |
"The allottee paid the land cost in full and requested for EOT with out levying penalty.
Recommended for EOT for 3 years from 1st April, 2022 without in terms of G.O.Ms.No.7, clause 7 (Vi)."
|
613 |
105 |
VIJAYAWADA |
NTR |
IP_JAGGAIAHPET |
PLOT NO_22 |
26596 |
M/s. Hanna Enterprises |
09-JUL-2022 |
09-JUL-2022 |
18-JUN-2011 |
689,108.00
|
229,680.00 |
459,428.00 |
459,428.00 |
0.00 |
Provisional Allotment |
- |
SC |
985 |
R1 - Land In Possession Of Company And Approval Obtained |
31-MAR-2025 |
- |
- |
27-NOV-2019 |
Reallotment under YSR JBVM.Applyed for transfer of allotment.Land cost paid |
657 |
106 |
VISAKHAPATNAM |
Visakhapatnam |
AN_BLOCK_F |
PLOT 58 |
12704 |
JEY KEY ENGINEERING WORKS |
29-JUL-2022 |
29-JUL-2022 |
30-AUG-2010 |
2,322,810.00
|
500,000.00 |
1,822,810.00 |
1,822,810.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
SC |
923 |
G2 - Trail Production |
31-MAR-2025 |
- |
- |
- |
'APIIC has allotted the plots and the allottees have constructed the buildings and implemented their units.
Subsequently, the VUDA has approved the layout excluding the land in Sy. No. 21, which is classified as ?Cheruvu?.In view of the above problems, this office is not in a position to approve the building plan and execution of sale deed even though the allottee have implemented the unit. |
637 |
107 |
VISAKHAPATNAM |
Visakhapatnam |
IP_AGANAMPUDI_LAYOUT |
PLOT NO-57 |
43708 |
M/s. Navdeep Engineering Works, Prop: K. Kotaiah |
08-JUL-2022 |
08-JUL-2022 |
14-NOV-2013 |
2,797,200.00
|
932,307.00 |
1,864,893.00 |
2,959,052.00 |
-1,094,159.00 |
Sale Agreement(Lease Deed) |
- |
SC |
999 |
G1 - Gone In To Production |
31-MAR-2025 |
- |
10-JUN-2015 |
- |
"The allottee has implemented the unit and working.
Sale Deed yet to executed"
|
658 |
108 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
162 |
61016 |
GRACE ENTERPRISES |
29-JUL-2022 |
29-JUL-2022 |
02-FEB-2024 |
716,100.00
|
0.00 |
716,100.00 |
752,600.00 |
-36,500.00 |
Sale Agreement(Lease Deed) |
- |
General |
300 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
25-JUL-2022 |
Possession handed over to company.
|
637 |