|  S.No  |  DISTRICT  |  ZONE  |  INDUSTRIAL PARK  |  PLOT NO  |  ALLOTMENT NUMBER  |  NAME OF THE INDUSTRY  |  ALLOTMENT DATE  |  PROVISIONAL ALLOTMENT DATE  |  DATE OF PHYSICAL POSSESSION  |  ALLOTMENT VALUE  |  REBATE AMOUNT  |  NET ALLOTMENT VALUE  |  PAID AMOUNT BY ENT  |  BALANCE AMOUNT  |  STATUS OF ALLOTMENT  |  CANCELLATION  |  CANCELLATION DATE  |  CATEGORY OF ALLOTMENT  |  EXTENT IN SQM  |  IMPLEMENTATION STATUS  |  IMPLEMENTATION DUE DATE  |  EOT PERIOD  |  DCP DATE  |  NOTICE ISSUED DATE  |  IMPL ZM REMARKS  |  ALLOTMENT AGE IN DAYS  |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
ANAKAPALLI |
Anakapalli |
APIIC_ATCHUTAPURAM_APSEZ |
3 |
44753 |
M/S.PRANA PHARMACEUTICALS PVT.LTD |
13-JAN-2023 |
13-JAN-2023 |
18-MAR-2023 |
45,773,084.00
|
1,000,000.00 |
44,773,084.00 |
0.00 |
44,773,084.00 |
Lease Deed |
- |
- |
SC |
51721 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Re allotment orders issued. |
1363 |
2 |
ANAKAPALLI |
Anakapalli |
IP_ATCHUTAPURAM_DenotifiedArea |
27A10 |
52961 |
M/S. AMEENA INDUSTRIES |
15-JUL-2022 |
15-JUL-2022 |
10-JUL-2019 |
3,132,000.00
|
1,566,000.00 |
1,566,000.00 |
150,098.00 |
1,415,902.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
1800 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
15-FEB-2023 |
Yet to implement |
1545 |
3 |
ANAKAPALLI |
Anakapalli |
IP_ATCHUTAPURAM_DenotifiedArea |
27A42A3 |
53880 |
M/S. MANI INDUSTRIES |
14-JUL-2022 |
14-JUL-2022 |
28-MAR-2018 |
3,508,200.00
|
1,754,100.00 |
1,754,100.00 |
0.00 |
1,754,100.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC_W |
876 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
14-FEB-2023 |
Yet to implement |
1546 |
4 |
ANAKAPALLI |
Anakapalli |
IP_ATCHUTAPURAM_DenotifiedArea |
Z7A |
55521 |
M/s L G PLASTIC INDUSTRIES |
15-JUL-2022 |
15-JUL-2022 |
24-OCT-2018 |
1,470,000.00
|
735,000.00 |
735,000.00 |
197,750.00 |
537,250.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
700 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
14-FEB-2023 |
Yet to Implement |
1545 |
5 |
ANAKAPALLI |
Anakapalli |
IP_ATCHUTAPURAM_DenotifiedArea |
Z2/15 |
57265 |
M/s S S V INDUSTRIES |
12-JUL-2022 |
12-JUL-2022 |
26-APR-2019 |
940,800.00
|
470,400.00 |
470,400.00 |
126,560.00 |
343,840.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
448 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
14-FEB-2023 |
Showcause notice issued for non implementaiton. |
1548 |
6 |
ANAKAPALLI |
Anakapalli |
IP_ATCHUTAPURAM_DenotifiedArea |
Z6/1 Denotified Area |
60957 |
M/s G S FABRICATION WORKS |
12-JUL-2022 |
12-JUL-2022 |
02-SEP-2020 |
2,721,264.00
|
1,360,362.00 |
1,360,902.00 |
363,340.00 |
997,562.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
1157 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
14-FEB-2023 |
Yet to implement |
1548 |
7 |
ANAKAPALLI |
Anakapalli |
IP_PARAWADA_PH_III |
16 |
61545 |
PRAVAS PHARMA |
08-AUG-2023 |
08-AUG-2023 |
28-JUN-2024 |
35,945,456.00
|
2,000,000.00 |
33,945,456.00 |
33,955,456.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
27-JUL-20 |
SC |
8094 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Provisional Re-allotment orders in terms in term of G.O.Ms.No.7, Inds & Comm. (Infra) Dept. Dated :08.08.2023. |
1156 |
8 |
CHITTOOR |
Annamayya |
IP_VALASAPALLI |
PLOT NO.22 |
42749 |
SAI SUNRISE IINDUSTRIES |
06-AUG-2024 |
06-AUG-2024 |
28-MAY-2015 |
221,787.00
|
- |
- |
0.00 |
221,787.00 |
Cancelled & Restored |
- |
11-JUL-17 |
SC_W |
661 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Reallotment orders issued as per Gono.7 |
792 |
9 |
CHITTOOR |
Annamayya |
MSME,Molakaladinne |
12 |
59377 |
MAITRI CLOTHING |
11-AUG-2022 |
11-AUG-2022 |
07-AUG-2024 |
519,300.00
|
259,650.00 |
259,650.00 |
259,650.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
18-JUL-19 |
SC |
300 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Reallotment order issued. |
1518 |
10 |
CHITTOOR |
Chittoor |
Autonagar and MSME Palamaner |
23/B |
58605 |
PRASANTH AND ARUN CO |
05-JUL-2022 |
05-JUL-2022 |
05-FEB-2021 |
138,033.00
|
69,017.00 |
69,016.00 |
69,017.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
147 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
05-MAR-2022 |
Providing Extension of Time under
G.O.Ms.No.7 - Pre-Conditions issued on 16.12.2025 |
1555 |
11 |
CHITTOOR |
Chittoor |
Autonagar and MSME Palamaner |
Plot No.1 |
58624 |
A.K.Cold Storage |
05-JUL-2022 |
05-JUL-2022 |
25-JAN-2021 |
299,353.00
|
149,677.00 |
149,676.00 |
201,900.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
318.8 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
20-MAR-2025 |
Providing Extension of Time under G.O.Ms.No.7 -
Pre-Conditions issued on 16.12.2025. |
1555 |
12 |
CHITTOOR |
Chittoor |
Autonagar and MSME Palamaner |
40 |
59222 |
JAI BHIM |
05-JUL-2022 |
05-JUL-2022 |
17-SEP-2019 |
436,635.00
|
218,317.00 |
218,318.00 |
214,325.00 |
3,993.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
350 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
04-MAR-2025 |
Yet to be implemented. Providing Extension of Time under G.O.Ms.No.7 - Pre- Conditions issued on 16.12.2025. |
1555 |
13 |
CHITTOOR |
Chittoor |
Autonagar and MSME Palamaner |
21A |
59433 |
Ananda Raj &co. |
22-AUG-2022 |
22-AUG-2022 |
18-FEB-2020 |
240,384.00
|
120,192.00 |
120,192.00 |
168,555.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
256 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
27-NOV-2024 |
Providing Extension of Time under G.O.Ms.No.7 - Pre-Conditions issued on 16.12.2025. |
1507 |
14 |
CHITTOOR |
Chittoor |
MSME, GANDRAJUPALLE |
29,30,31 |
60947 |
M/s.Sri Venkateswara Alloys |
25-AUG-2022 |
25-AUG-2022 |
18-MAY-2020 |
804,600.00
|
402,300.00 |
402,300.00 |
402,300.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
900 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
16-APR-2025 |
Civil Works Commenced.Providing Extension of Time under G'O'Ms No 7 - Pre-Conditions issued on 17.12.2025. |
1504 |
15 |
CHITTOOR |
Chittoor |
MSME, GANDRAJUPALLE |
116 |
61056 |
M/s JOSHUA POLYMERS |
29-JAN-2024 |
29-JAN-2024 |
30-SEP-2020 |
577,524.00
|
288,762.00 |
288,762.00 |
288,762.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
646 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
28-NOV-2024 |
Providing Extension of Time under G'O'Ms No 7 - Pre-Conditions issued on 18.12.2025. |
982 |
16 |
CHITTOOR |
Chittoor |
IP GD NELLORE |
Plot No.17 |
59448 |
M/s. ABI INDUSTRY |
22-AUG-2022 |
22-AUG-2022 |
28-OCT-2019 |
354,050.00
|
0.00 |
354,050.00 |
70,810.00 |
283,240.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
BC,Women |
730 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
08-APR-2025 |
Providing Extension of Time under G.O.Ms.No.7 -
Pre-Conditions issued on 17.12.2025. |
1507 |
17 |
GUNTUR |
Guntur |
AN_GUNTUR_PHASE_IV |
P NO_456 B NO_22R |
43538 |
GADDIPARTHI CHINA BABU |
12-JUL-2022 |
12-JUL-2022 |
16-AUG-2014 |
140,448.00
|
46,811.00 |
93,637.00 |
0.00 |
93,637.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
42 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
17-MAR-2018 |
Re-allotment orders on Provisional basis are issued under support measures of "YSR Jagananna Badugu Vikasam".
As per G.O.No.7 letter issued dt on:23-dec-2025 |
1548 |
18 |
KAKINADA |
Kakinada |
IP_PEDDAPURAM(LAYOUT) Ph.I |
4-A7 |
48138 |
Arugula Menaka |
11-JUL-2022 |
11-JUL-2022 |
25-APR-2023 |
1,455,300.00
|
- |
- |
677,210.00 |
778,090.00 |
Sale Agreement(Lease Deed) |
NA |
- |
SC |
511 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement executed and Possession handed oveer |
1549 |
19 |
KAKINADA |
Kakinada |
IP_PEDDAPURAM(LAYOUT) Ph.I |
5-A2 |
48276 |
MAHENDRA INDUSTRIES |
11-JUL-2022 |
11-JUL-2022 |
03-NOV-2023 |
1,653,750.00
|
826,875.00 |
826,875.00 |
836,000.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
08-MAY-19 |
ST |
875 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement executed and possession handed over |
1549 |
20 |
KAKINADA |
Kakinada |
IP_PEDDAPURAM(LAYOUT) Ph.I |
4-A17 |
48277 |
M/s. Sri Maha Laxmi Minaral Industries |
01-APR-2023 |
01-APR-2023 |
03-NOV-2023 |
1,653,750.00
|
826,875.00 |
826,875.00 |
1,293,005.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
31-DEC-16 |
ST |
939 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement executed and Possession handed over. |
1285 |
21 |
KAKINADA |
Kakinada |
IP_PEDDAPURAM(LAYOUT) Ph.I |
4-A12 |
51339 |
M/s SRI SURYA DURGA PAPERS |
29-SEP-2023 |
29-SEP-2023 |
21-FEB-2018 |
1,311,750.00
|
655,875.00 |
655,875.00 |
655,875.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
04-MAR-21 |
SC |
619 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement executed |
1104 |
22 |
KAKINADA |
Kakinada |
IP_PEDDAPURAM(LAYOUT) Ph.I |
5-A11 |
60555 |
M/s RAVI CHANDRA INDUSTRIES. |
18-JUL-2022 |
18-JUL-2022 |
22-SEP-2021 |
2,607,500.00
|
1,303,750.00 |
1,303,750.00 |
1,618,030.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
875 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
EOT Orders issued as per GO MS No.7, dt.05.02.2022 |
1542 |
23 |
KAKINADA |
Kakinada |
MSME-PEDDAPURAM |
25 |
61209 |
M/s. Satyam Electrical & Civil Engineering Works |
12-JUL-2022 |
12-JUL-2022 |
10-OCT-2023 |
666,000.00
|
333,000.00 |
333,000.00 |
383,000.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
28-APR-20 |
SC |
300 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Reallotted as per GO 7. Allottee paid the toal land cost. Sale Agreement executed & Possession handed over. |
1548 |
24 |
KAKINADA |
Kakinada |
IP_PEDDAPURAM(LAYOUT) Ph.I |
4-A20 |
61596 |
KK engineers |
21-JUL-2022 |
21-JUL-2022 |
30-NOV-2021 |
2,655,180.00
|
1,327,590.00 |
1,327,590.00 |
1,327,143.00 |
447.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
891 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
EOT Orders issued upto 05.12.2026 as per GO MS No.7, dt.05.02.2022 |
1539 |
25 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 68,PLOT NO- 69,PLOT NO- 70 |
58090 |
MS LAKSHMI MEGHANA ENTERPRISES |
06-JUL-2022 |
06-JUL-2022 |
11-MAY-2023 |
938,700.00
|
469,350.00 |
469,350.00 |
470,018.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
18-APR-19 |
SC |
900 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
01-MAY-2025 |
Land in Possession of Company |
1554 |
26 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
403 |
2921 |
MANOHAR AYURVEDIC PHARMACY |
16-JUL-2022 |
16-JUL-2022 |
21-DEC-2023 |
3,417,000.00
|
500,000.00 |
2,917,000.00 |
729,250.00 |
2,187,750.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
10-NOV-16 |
SC |
8034 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
09-DEC-2025 |
G.O.Ms.No.7 case. Yet to be implement,Notice issued on 09-12-2025 for non payment of land cost. |
1544 |
27 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
335-A |
46556 |
M/s.Nisanth Drugs & Fertilizers Pvt Ltd |
16-JUL-2022 |
16-JUL-2022 |
17-APR-2011 |
674,400.00
|
224,778.00 |
449,622.00 |
449,622.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
29-APR-17 |
SC |
1686 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
09-DEC-2025 |
G.O.Ms.No.7 case. Re-allotment order given on 16.07.2022 yet to be implemented, notice isued on 09-12-2025 |
1544 |
28 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
387_B |
46557 |
M/s.Nisanth Drugs & Fertilizers pvt ltd |
16-JUL-2022 |
16-JUL-2022 |
17-APR-2011 |
1,722,800.00
|
574,209.00 |
1,148,591.00 |
1,148,591.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
29-APR-17 |
SC |
4307 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
09-DEC-2025 |
G.O.Ms.No.7 case.Re-allotment order given on 16.07.2022.under implementation, notice issued on 09-12-2025 |
1544 |
29 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
387_C |
2913 |
M/s Prasanna Industries |
16-JUL-2022 |
16-JUL-2022 |
23-MAR-2023 |
2,181,500.00
|
500,000.00 |
1,681,500.00 |
1,681,500.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
22-MAY-18 |
SC |
4363 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
09-DEC-2025 |
G.O.Ms.No.7 case.Yet to be implement, notice issued on 09-12-2025.
|
1544 |
30 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
535-B |
32978 |
LEELAKRISHNA PACKAGING INDUSTRY |
03-DEC-2022 |
03-DEC-2022 |
07-DEC-2024 |
2,375,000.00
|
500,000.00 |
1,875,000.00 |
0.00 |
1,875,000.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC_W |
4712 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
24-JUN-2024 |
Yet to be implement |
1404 |
31 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
391-A |
29472 |
RATNAM GRANITE CUTTING AND POLISHING INDUSTRY |
29-NOV-2022 |
29-NOV-2022 |
07-NOV-2024 |
2,872,500.00
|
500,000.00 |
2,372,500.00 |
600,000.00 |
1,772,500.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
10-NOV-16 |
SC |
5745 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
09-DEC-2025 |
Yet to be implement(G.O.Ms.No.7), notice issued on 09-12-2025 for balance land cost |
1408 |
32 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
392-B |
29479 |
J K INDUSTRIES |
29-NOV-2022 |
29-NOV-2022 |
30-JAN-2025 |
1,848,500.00
|
500,000.00 |
1,348,500.00 |
310,000.00 |
1,038,500.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
10-NOV-16 |
SC |
3697 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
24-JUN-2024 |
G.O.Ms.No.7 case. Yet to be implement |
1408 |
33 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
500/A |
44687 |
M/s.JAYA BHARTH INDUSTRIES |
16-JUL-2022 |
16-JUL-2022 |
23-DEC-2013 |
1,910,300.00
|
500,000.00 |
1,410,300.00 |
1,410,300.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
01-FEB-17 |
SC_W |
3793 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
09-DEC-2025 |
G.O.Ms.No.7 case. Re-allotment order given on 16.07.2022. To be implemented, notice issued on 09-12-2025.
|
1544 |
34 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
496-A |
34025 |
PRAKASH INDUSTRIES. |
24-JUN-2024 |
24-JUN-2024 |
09-AUG-2024 |
2,075,500.00
|
500,000.00 |
1,575,500.00 |
1,575,500.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
22-MAY-18 |
SC |
4151 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
28-APR-2025 |
G.O.Ms.No.7 case. Reallotment order given on 24.06.2024,Yet to be implement |
835 |
35 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
129-A |
41734 |
M/s.Vijaya Granites |
16-JUL-2022 |
16-JUL-2022 |
25-MAR-2023 |
1,026,500.00
|
342,132.00 |
684,368.00 |
684,368.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
22-MAY-18 |
SC |
2053 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
09-DEC-2025 |
G.O.Ms.No.7 case.Yet to be implement, notice issued on 09-12-2025.
|
1544 |
36 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
502-B |
58785 |
MJS Engineering Works |
16-JUL-2022 |
16-JUL-2022 |
02-DEC-2013 |
2,220,960.00
|
740,246.00 |
1,480,714.00 |
1,358,678.00 |
122,036.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
3966 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
09-DEC-2025 |
G.O.Ms.No.7 case. Re-allotment order given on 16.07.2022.To be implemented, notice issued on 09-12-2025.
|
1544 |
37 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
415/B |
43875 |
M/s.KPS COIR INDUSTRIES |
13-JUL-2022 |
13-JUL-2022 |
03-JUN-2023 |
2,037,672.00
|
679,156.00 |
1,358,516.00 |
1,358,516.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
3639 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
09-DEC-2025 |
(G.O.Ms.No.7)Yet to be implement, notice issued on 09-12-2025.
|
1547 |
38 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
527 |
45023 |
M/s.MERCURY'S CORRUGATED INDUSTRIES |
16-JUL-2022 |
16-JUL-2022 |
11-NOV-2014 |
2,985,600.00
|
1,000,000.00 |
1,985,600.00 |
746,400.00 |
1,239,200.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
4982 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
09-DEC-2025 |
Notice issued on 09-12-2025 for non payment of balance land cost(G.O.Ms.No.7) |
1544 |
39 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
645 |
45018 |
M/s.SRI SAI RAM INDUSTRIES |
16-JUL-2022 |
16-JUL-2022 |
16-MAY-2016 |
5,364,000.00
|
1,000,000.00 |
4,364,000.00 |
4,364,000.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
6705 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
09-DEC-2025 |
Yet to be implement(G.O.Ms.No.7) |
1544 |
40 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
646-B |
45112 |
M/s.MADHULATHA AGENCIES |
16-JUL-2022 |
16-JUL-2022 |
18-SEP-2014 |
597,007.00
|
- |
- |
597,007.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC_W |
2239 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
24-MAR-2026 |
Yet to be implement(G.O.Ms.No.7) |
1544 |
41 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
492-B |
50419 |
M/s DHRUTHI ENTERPRIZES |
12-JUL-2024 |
12-JUL-2024 |
05-JUN-2017 |
4,032,400.00
|
2,000,000.00 |
2,032,400.00 |
0.00 |
2,032,400.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
4033 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
09-DEC-2025 |
Yet to be implement, notice issued on 09-12-2025 (G.O.Ms.No.7) |
817 |
42 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
389-B |
57428 |
M/s KNR INDUSTRIES |
04-APR-2023 |
04-APR-2023 |
25-JAN-2017 |
4,862,000.00
|
2,000,000.00 |
2,862,000.00 |
715,500.00 |
2,146,500.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
ST |
4862 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
09-DEC-2025 |
Noticed on 09-12-2025 for non payment of balance land cost(G.O.Ms.No.7) |
1282 |
43 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
492-A |
58997 |
M/s A J Technologies |
13-JUL-2022 |
13-JUL-2022 |
26-JUN-2024 |
4,033,000.00
|
2,000,000.00 |
2,033,000.00 |
2,296,797.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
22-MAY-18 |
SC |
4033 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
15-JUL-2023 |
Yet to be Implement(G.O.Ms.No.7) |
1547 |
44 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
513-A |
60760 |
RAJKUMAR WOOD PACKERS |
03-DEC-2022 |
03-DEC-2022 |
19-OCT-2024 |
1,890,000.00
|
945,000.00 |
945,000.00 |
1,345,000.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
20-FEB-21 |
SC/ST |
1200 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
24-JUN-2024 |
Yet to be implement |
1404 |
45 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
493-A |
64507 |
M/s Padmalatha Technologies |
18-NOV-2022 |
18-NOV-2022 |
26-JUN-2024 |
4,032,400.00
|
2,000,000.00 |
2,032,400.00 |
2,278,373.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
4033 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
17-JUL-2023 |
Yet to be implement-G.O.Ms.No.7 |
1419 |
46 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
58,Plot-47 |
58961 |
J.Muthyalappa |
03-APR-2023 |
03-APR-2023 |
18-OCT-2023 |
439,800.00
|
219,900.00 |
219,900.00 |
219,900.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
08-JUN-15 |
SC |
600 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
28-NOV-2024 |
Re Allotment orders issued as per Go Ms No 7.Land Cost paid.Final Allotment orders issued on 31.08.2023.Sale Agreement registered on 18.10.2023.Bore Well laid.Notice issued for stage of Implementation |
1283 |
47 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
121 |
59166 |
blvs traders |
03-AUG-2022 |
03-AUG-2022 |
20-SEP-2024 |
219,900.00
|
109,950.00 |
109,950.00 |
122,308.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
15-JUL-19 |
SC |
300 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
23-MAY-2025 |
Re Allotment Orders issued as per GO Ms.7.Sale Agreement registerd on 20.09.2024 |
1526 |
48 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
Plot-55 |
59179 |
M/s JOSHNIKA GARMENTS |
03-AUG-2022 |
03-AUG-2022 |
28-JUL-2023 |
219,900.00
|
109,950.00 |
109,950.00 |
109,950.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
19-JUL-19 |
ST |
300 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
18-JUN-2026 |
Approvals yet to be obtained.Notice issued for stage of implementation. |
1526 |
49 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
102 |
59165 |
M/s GOMINI GARMENTS |
03-AUG-2022 |
03-AUG-2022 |
28-JUL-2023 |
433,203.00
|
216,601.00 |
216,602.00 |
226,204.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
15-JUL-19 |
ST |
591 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
18-JUN-2026 |
Approvals yet to be obtained. |
1526 |
50 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
254,255 |
58442 |
M/s. Sri Balaji Enterprises |
02-AUG-2022 |
02-AUG-2022 |
03-JAN-2025 |
736,032.00
|
368,016.00 |
368,016.00 |
215,000.00 |
153,016.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
16-JUL-19 |
SC |
1056 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
19-JUN-2026 |
Possession handed over to the company on 03.01.2025 and Notice issued on 19-06-2026 for submisssion of status of implementation of the project . |
1527 |
51 |
SRIKAKULAM |
Srikakulam |
IP PYIDIBHIMAVARAM |
SPL-2 |
44832 |
M/s ASTHA BIOCHEM |
02-JUL-2022 |
02-JUL-2022 |
05-DEC-2013 |
4,922,400.00
|
1,000,000.00 |
3,922,400.00 |
980,600.00 |
2,941,800.00 |
Sale Agreement(Lease Deed) |
- |
04-MAY-19 |
SC |
4395 |
R2 - Land Allotted To Company And Other Approvals In Progress |
09-JUL-2028 |
- |
- |
- |
Re Allotment Issued on 02.07.2023 under Go Ms No 5.2.2022 |
1558 |
52 |
SRIKAKULAM |
Vizianagaram |
GROWTH CENTRE BOBBILI |
283_B |
29572 |
SAMRAJ INDUSTRIES |
03-APR-2023 |
03-APR-2023 |
26-MAR-2025 |
299,000.00
|
149,500.00 |
149,500.00 |
0.00 |
149,500.00 |
Sale Agreement(Lease Deed) |
NA |
- |
SC |
920 |
R2 - Land Allotted To Company And Other Approvals In Progress |
25-MAR-2028 |
- |
- |
- |
Sale Agreement executed and Possession handed over on 26.3.2025 |
1283 |
53 |
SRIKAKULAM |
Vizianagaram |
GROWTH CENTRE BOBBILI |
281_F |
28981 |
ATHOTA INDUSTRIES |
03-APR-2023 |
03-APR-2023 |
01-SEP-2025 |
245,345.00
|
- |
- |
0.00 |
245,345.00 |
Sale Agreement(Lease Deed) |
NA |
- |
SC_W |
920 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-AUG-2028 |
- |
- |
- |
Re Allotment Orders Issued |
1283 |
54 |
SRIKAKULAM |
Vizianagaram |
GROWTH CENTRE BOBBILI |
286/A |
66229 |
Sri Sai Ratna Indistries |
31-MAY-2023 |
31-MAY-2023 |
28-DEC-2023 |
368,000.00
|
122,655.00 |
245,345.00 |
0.00 |
245,345.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
920 |
R2 - Land Allotted To Company And Other Approvals In Progress |
27-DEC-2026 |
- |
- |
- |
Sale Agreement was executed and Possession handedover on 28.12.2023 |
1225 |
55 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - I |
PLOT NO 3B |
61163 |
M/s.SANKAR SHALINI INDUSTRY |
23-MAY-2023 |
23-MAY-2023 |
12-SEP-2024 |
5,394,890.00
|
2,000,000.00 |
3,394,890.00 |
852,820.00 |
2,542,070.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
ST |
1990 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
10-DEC-2025 |
Possession of land handed over on 12.09.2024. Stipulated time upto 11.09.2027 for implementation of the unit. Notice issued on 01.04.2025. As per G.O.Ms.No.7, EOT orders for payment of balance land cost was issued on 10.12.2025. |
1233 |
56 |
TIRUPATI |
Tirupati |
IP_CHINTHALAPALEM |
UDL_1 |
59830 |
Sundaram Biomass briquetted Fuel |
03-FEB-2024 |
03-FEB-2024 |
08-JUL-2020 |
10,635,516.00
|
0.00 |
10,635,516.00 |
2,732,042.00 |
7,903,474.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC_W |
24282 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
19-MAR-2025 |
further EOT considered upto 25.06.2026 for
payment of balance land cost and upto 25.06.2027 for implementation of the
unit. |
977 |
57 |
TIRUPATI |
Tirupati |
IP_TADA |
PL.NO.116 |
58990 |
TRAPPET TAPES |
13-AUG-2022 |
13-AUG-2022 |
10-JUL-2026 |
1,512,000.00
|
742,000.00 |
770,000.00 |
850,936.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
- |
SC |
700 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale agreement executed on 09.07.2026 and registered on 10.07.2026. As per Allotment issued on GO Ms No.7. |
1516 |
58 |
TIRUPATI |
Tirupati |
IP_TADA |
PL.NO.123 |
47311 |
M/s WELL PACK INDUSTRIES |
13-AUG-2022 |
13-AUG-2022 |
10-JUL-2026 |
1,512,000.00
|
742,000.00 |
770,000.00 |
853,488.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
- |
SC_W |
700 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale agreement executed on 09.07.2026 and registered on 10.07.2026. As per Allotment issued on GO Ms No.7. |
1516 |
59 |
TIRUPATI SPL PROJECTS |
Sri Potti Sriramulu Nellore |
MSME Park, Bodduvaripalem |
13,14,15 |
58333 |
PADMA ENTERPRISES |
15-JUL-2022 |
15-JUL-2022 |
19-NOV-2020 |
1,668,429.00
|
834,215.00 |
834,214.00 |
208,554.00 |
625,660.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
1119 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
29-JUL-2021 |
Vacant Land/Agreed for withdrawn |
1545 |
60 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/108 |
54626 |
RAVI PACKAGING INDUSTRIES |
09-JUL-2022 |
09-JUL-2022 |
11-JUL-2025 |
204,000.00
|
103,428.00 |
100,572.00 |
104,608.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
- |
SC |
500 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement(Lease Deed) |
1551 |
61 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._23/12 |
54788 |
SIRI TOOLS |
31-JUL-2022 |
31-JUL-2022 |
11-OCT-2023 |
204,000.00
|
102,000.00 |
102,000.00 |
102,000.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
500 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Aggrement |
1529 |
62 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/81,PLOT NO._10/82 |
54753 |
Nishanam Feeds |
28-DEC-2022 |
28-DEC-2022 |
02-AUG-2025 |
410,448.00
|
204,408.00 |
206,040.00 |
204,408.00 |
1,632.00 |
Sale Agreement(Lease Deed) |
NA |
11-OCT-19 |
SC |
1006 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement(Lease Deed) |
1379 |
63 |
VIJAYAWADA |
Krishna |
Model Indl Park Ph-II,Mallaval |
P_40/A |
54787 |
KAIZEN MACHINE TOOLS |
31-JUL-2022 |
31-JUL-2022 |
13-SEP-2025 |
510,000.00
|
249,900.00 |
260,100.00 |
277,650.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
1250 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement(Lease Deed) |
1529 |
64 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No_8/20 |
54751 |
ARUN RAJ POLY PACKS |
09-JUL-2022 |
09-JUL-2022 |
26-AUG-2023 |
551,208.00
|
281,520.00 |
269,688.00 |
281,520.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
30-SEP-19 |
SC |
1351 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Aggrement.REALLOTMENT UNDE NO GO NO 7 |
1551 |
65 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No_20/23,Plot No_20/24,Plot No_20/25,Plot No_20/26,Plot No_20/27,Plot No_20/28,Plot No_20/29 |
54708 |
M/s MET WEIGH INDIA |
16-SEP-2022 |
16-SEP-2022 |
31-JUL-2026 |
1,142,400.00
|
560,184.00 |
582,216.00 |
689,788.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
21-SEP-19 |
SC |
2800 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement(Lease Deed) |
1482 |
66 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/194 |
55864 |
MOGILI ANJANEYULU |
22-JUL-2022 |
22-JUL-2022 |
15-NOV-2022 |
204,816.00
|
102,408.00 |
102,408.00 |
102,508.00 |
0.00 |
Sale Agreement(Lease Deed) |
Cancelled |
21-DEC-19 |
ST |
502 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Reallotment of GO No 7 |
1538 |
67 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No_5/62 |
55916 |
M/S HEMA POLYMERS |
09-JUL-2022 |
09-JUL-2022 |
20-AUG-2026 |
205,224.00
|
102,612.00 |
102,612.00 |
128,612.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
24-JUN-19 |
ST |
503 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement(Lease Deed) |
1551 |
68 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._11/66 |
55269 |
M/s Sonia Trade Lines |
28-DEC-2022 |
28-DEC-2022 |
29-AUG-2026 |
306,816.00
|
159,732.00 |
147,084.00 |
147,084.00 |
0.00 |
Provisional Allotment |
NA |
19-MAR-20 |
SC |
752 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Reallotment under YSR JBV |
1379 |
69 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._5/39 |
55903 |
KOMARAGIRI BHASKARA RAO |
31-JUL-2022 |
31-JUL-2022 |
26-MAY-2026 |
820,896.00
|
408,000.00 |
412,896.00 |
408,000.00 |
4,896.00 |
Sale Agreement(Lease Deed) |
- |
- |
ST |
2012 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
SA |
1529 |
70 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO_5/76,Plot No_5/76 |
55242 |
ALCHEMY WATER TECHNOLOGIES |
09-JUL-2022 |
09-JUL-2022 |
22-JUL-2025 |
1,632,000.00
|
410,448.00 |
1,221,552.00 |
412,000.00 |
809,552.00 |
Sale Agreement(Lease Deed) |
NA |
21-SEP-19 |
ST |
4000 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
SALE AGREEMENT.REALLOTMENT UNDER GO NO |
1551 |
71 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/89 |
56624 |
TULASIRAM DISPOSABLE PLASTIC CUP AND PLATES |
23-AUG-2022 |
23-AUG-2022 |
09-FEB-2026 |
204,408.00
|
102,204.00 |
102,204.00 |
102,408.00 |
0.00 |
Final Allotment |
- |
- |
ST |
501 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
sa |
1506 |
72 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._9/93,PLOT NO._9/94 |
57007 |
Amaravathi Engineering works |
31-JUL-2022 |
31-JUL-2022 |
29-AUG-2019 |
408,816.00
|
204,000.00 |
204,816.00 |
204,000.00 |
816.00 |
Sale Agreement(Lease Deed) |
Cancelled |
25-JUN-22 |
SC |
1002 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement.Go No 7 YSR JBVM |
1529 |
73 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/76 |
57004 |
NISSI ENTERPRISES |
30-JUL-2022 |
30-JUL-2022 |
31-JAN-2020 |
205,224.00
|
102,000.00 |
103,224.00 |
106,486.00 |
0.00 |
Sale Agreement(Lease Deed) |
Cancelled |
25-JUN-22 |
SC |
503 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement executed. GO MS No 7 YSR JBVM |
1530 |
74 |
VIJAYAWADA |
Krishna |
State Food Park, Mallavalli |
Plot No.8/A |
55403 |
M/S APRAJITA ENTERPRISES |
08-JUN-2023 |
08-JUN-2023 |
23-APR-2026 |
513,500.00
|
256,750.00 |
256,750.00 |
257,752.00 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
29-MAY-22 |
SC |
500 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement with in the time. |
1217 |
75 |
VIJAYAWADA |
NTR |
IP_JAGGAIAHPET |
PLOT NO_159 |
55765 |
SRK FABRICATION WORKS |
09-JUN-2023 |
09-JUN-2023 |
23-OCT-2020 |
3,633,000.00
|
1,816,500.00 |
1,816,500.00 |
453,696.00 |
1,362,804.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
1038 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Reallotment orders issued under YSR JBVM |
1216 |
76 |
VISAKHAPATNAM |
Visakhapatnam |
INDL.PARK_GAMBHEERAM |
PLOT NO. 46,PLOT NO. 47A |
46968 |
M/s. Neelaveni Industries |
21-MAR-2024 |
21-MAR-2024 |
05-DEC-2024 |
16,784,908.00
|
1,000,000.00 |
15,784,908.00 |
2,350,800.00 |
13,434,108.00 |
Sale Agreement(Lease Deed) |
NA |
- |
SC |
2879.6 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement executed and possession handed over to company. |
930 |
77 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
41 |
58375 |
SS Industries |
29-JUL-2022 |
29-JUL-2022 |
04-AUG-2026 |
751,905.00
|
375,953.00 |
375,952.00 |
751,905.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
315 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Possession handed over to company |
1531 |
78 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
39 |
58367 |
Essess Industries |
29-JUL-2022 |
29-JUL-2022 |
04-AUG-2026 |
1,785,476.00
|
892,738.00 |
892,738.00 |
480,796.00 |
411,942.00 |
Sale Agreement(Lease Deed) |
- |
- |
SC |
386 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Possession handed over to company |
1531 |
79 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
27,28 |
58382 |
ALLCO TECH |
29-JUL-2022 |
29-JUL-2022 |
25-AUG-2021 |
3,060,134.00
|
1,530,067.00 |
1,530,067.00 |
2,025,713.00 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
- |
SC |
1269.05 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
04-SEP-2023 |
EOT sanctioned up to 07.01.2027 under GO MS No 7 |
1531 |
80 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
20,21 |
58369 |
Sri Sai Maruthi Village Foods |
29-JUL-2022 |
29-JUL-2022 |
21-SEP-2026 |
1,615,999.00
|
808,000.00 |
807,999.00 |
1,615,999.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
- |
ST_W |
783 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement executed and Possession handed over to company
|
1531 |
81 |
VISAKHAPATNAM |
Visakhapatnam |
MSME_GURRAMPALEM |
14,15 |
59784 |
PERFECT CEMENTS |
29-JUL-2022 |
29-JUL-2022 |
20-OCT-2023 |
1,885,730.00
|
942,865.00 |
942,865.00 |
1,674,981.00 |
0.00 |
Sale Agreement(Lease Deed) |
- |
- |
ST |
790 |
R2 - Land Allotted To Company And Other Approvals In Progress |
31-MAR-2025 |
- |
- |
- |
Sale Agreement executed and Possession handed over to Company. |
1531 |