S.No   DISTRICT   ZONE   INDUSTRIAL PARK   PLOT NO   ALLOTMENT NUMBER   NAME OF THE INDUSTRY   ALLOTMENT DATE   PROVISIONAL ALLOTMENT DATE   FINAL ALLOTMENT DATE   DATE OF PHYSICAL POSSESSION   ALLOTMENT VALUE   REBATE AMOUNT   NET ALLOTMENT VALUE   ADVANCE TO BE PAID   AMOUNT RECEIVED   LAST PAID DATE   BALANCE ADVANCE AMOUNT   STATUS OF ALLOTMENT   CANCELLATION   CATEGORY OF ALLOTMENT   EXTENT IN SQM   IMPLEMENTATION STATUS CODE NEW   IMPLEMENTATION DUE DATE   DCP DATE   EOT PERIOD   NOTICE ISSUED DATE   IMPL ZM REMARKS   ALLOTMENT AGE IN DAYS 
1
TIRUPATI
Tirupati
AN_TIRUPATI
186
17272
SRI VIGNESWARA SPRAY PAINTING WORKS
03-FEB-2000
03-FEB-2000
-
31-AUG-2001
92,700.00
-
-
92,700.00
0.00
-
92,700.00
Cancelled
Cancelled
Others
300
G1
31-DEC-2007
-
-
26-DEC-2013
Sale Deed before implementation. Cancelled and kept in abeyance. Subsequently, implemented. Notice issued for obtaining restoration & delay condonation.
8848
2
TIRUPATI
Tirupati
AN_TIRUPATI
187
17203
AYYAPPA LINER WORKS
05-FEB-2000
05-FEB-2000
22-MAR-2000
28-APR-2000
30,900.00
-
-
30,900.00
0.00
-
30,900.00
Cancelled
Cancelled
Others
100
G1
01-APR-2007
-
-
05-AUG-2014
Sale Deed before implementation. Allotment cancelled. Subsequently implemented the unit. Notice issued to obtain restoration & condonation of delay in implementation.
8846
3
TIRUPATI
Tirupati
AN_TIRUPATI
318
17218
KUMAR TINKERING WORKS
05-FEB-2000
05-FEB-2000
22-MAR-2000
31-JUL-2000
30,900.00
-
-
30,900.00
0.00
-
30,900.00
Cancelled
Cancelled
Others
100
R2
31-JUL-2002
-
-
15-DEC-2014
Sale Deed before implementation. Cancelled for non-implementation. Utilising for iron scrap activity.
8846
4
TIRUPATI
Tirupati
AN_TIRUPATI
23
17314
SRI VENKATESWARA BLACKSMITH WORKS & SPRING RESETTING
05-FEB-2000
05-FEB-2000
-
16-AUG-2002
61,800.00
-
-
61,800.00
0.00
-
61,800.00
Cancelled
Cancelled
Others
200
G1
09-JAN-2014
-
-
28-FEB-2014
Sale Deed before implementation. Cancelled. subsequently implemented. EOT sub.committee considered delay condonation fee. Notice issued for furnishing mandatory documents.
8846
5
TIRUPATI
Tirupati
AN_TIRUPATI
96
17238
PADMAVATHI TRADERS
05-FEB-2000
05-FEB-2000
16-JAN-2001
30-JAN-2001
92,700.00
-
-
92,700.00
0.00
-
92,700.00
Cancelled
Cancelled
Others
300
G1
01-JAN-2008
-
-
-
Sale Deed was issued before implementation. Subsequently allottee gone into production. Notice was issued on 16.09.2014 for restoration of allotment.
8846
6
TIRUPATI
Tirupati
AN_TIRUPATI
218
17493
MAHESH TYRES
07-MAR-2000
07-MAR-2000
24-APR-2000
22-APR-2000
30,900.00
-
-
30,900.00
0.00
-
30,900.00
-
-
Others
100
G1
01-MAY-2013
18-NOV-2013
-
-
Unit working. Present line of activity is Auto Electrical works.
8815
7
TIRUPATI
Tirupati
AN_TIRUPATI
322
17207
KAMAKSHI BLACKSMITH WORKS
15-MAR-2000
15-MAR-2000
28-APR-2000
28-APR-2000
61,800.00
-
-
61,800.00
0.00
-
61,800.00
Cancelled
Cancelled
Others
200
G1
31-DEC-2007
-
-
21-MAY-2013
Sale Deed issued before implementation. Subsequently, allottee gone into production. Notice was issued on 21.05.2013 for restoration of allotment
8807
8
TIRUPATI
Tirupati
AN_TIRUPATI
239
17401
GANESH DIESEL & PETROL WORKS
10-DEC-2001
10-DEC-2001
21-OCT-2002
01-FEB-2003
70,000.00
-
-
70,000.00
0.00
-
70,000.00
Cancelled
Cancelled
Others
200
G1
15-OCT-2013
-
-
-
Sale Deed issued before implementation. Cancelled. Subsequently implemented. Requested for Restoration. Report submitted to HO
8172
9
TIRUPATI
Tirupati
AN_TIRUPATI
266_C
17406
SRI LAKSHMI VENKATESWARA AUTO ELEC.WORKS
29-MAR-2003
29-MAR-2003
28-MAY-2003
04-JUN-2003
77,140.00
-
-
77,140.00
0.00
-
77,140.00
Cancelled
Cancelled
Others
221
G1
13-JUL-2012
-
-
10-MAY-2013
Sale Deed issued before implementation. Cancelled and the same kept in abeyance. Constructed shed. Notice issued for obtaining restoration
7698
10
TIRUPATI
Tirupati
APIIC_TIRUPATHI_IT_ITES_NONSEZ
LAND_3
12148
RELIANCE BPO PVT LTD
28-FEB-2008
28-FEB-2008
27-MAR-2008
09-JUN-2009
7,533,400.00
-
-
7,533,400.00
0.00
-
7,533,400.00
Cancelled
Cancelled
Others
40650
R1
09-JUN-2011
-
-
-
Allotment Cancelled
5901
11
TIRUPATI
Tirupati
CC_TIRUPATHI
LAND1
35299
K. SUBBARAYUDU
05-MAR-2011
05-MAR-2011
05-MAR-2011
30-MAY-2011
73.00
-
-
73.00
0.00
-
73.00
Cancelled
Notice Issued
Others
73
NA
29-MAY-2013
-
-
30-NOV-2021
Cancelled Allotment
4800
12
TIRUPATI
Tirupati
ELECTRONIC MFG CLUSTER - II
Shed No.7
56681
M/s.VINYAS INOVATIVE TECHNOLOGIES (P) LTD,
21-MAY-2018
21-MAY-2018
03-SEP-2019
31-MAY-2018
500,000.00
0.00
500,000.00
500,000.00
0.00
-
500,000.00
Cancelled
Cancelled
General
5000
G1
02-MAY-2020
-
-
-
Cancelled Allotment
2166
13
TIRUPATI
Tirupati
ELECTRONIC MFG CLUSTER - II
69
58358
ALTFORT ELECTRONIC APPARATUS LIMITED
07-MAR-2019
07-MAR-2019
24-JAN-2019
28-JAN-2019
15,413,277.00
0.00
15,413,277.00
15,413,277.00
1,541,328.00
29-FEB-2024
13,871,949.00
Cancelled
Cancellation Deed
General
7285
NA
27-JAN-2021
-
31-MAR-2023
24-JUN-2022
Cancelled Allotment
1876
14
TIRUPATI
Tirupati
ELECTRONIC MFG CLUSTER - II
67,68,69/A
58357
EXATRON SERVERS MANUFACTURING PVT LTD
07-MAR-2019
07-MAR-2019
14-FEB-2019
22-FEB-2019
44,975,600.00
0.00
44,975,600.00
44,975,600.00
4,497,560.00
29-FEB-2024
40,478,040.00
Cancelled
Cancelled
General
24300
NA
21-FEB-2021
-
-
-
Allotment withdrawn the allotment.
1876
15
TIRUPATI
Tirupati
ELECTRONIC MFG CLUSTER - II
100,101,99
60287
Clair Electronics Private Limited
12-SEP-2019
12-SEP-2019
-
-
50,375,384.00
0.00
50,375,384.00
50,375,384.00
5,496,515.00
29-FEB-2024
44,878,872.00
Cancelled
Cancelled
General
20676.7
NA
11-SEP-2020
-
-
-
ALLOTMENT CANCELLED ON 12-OCT-2020.
1687
16
TIRUPATI
Tirupati
ELECTRONIC MFG CLUSTER - II
Plot No.94 B
60266
SAMPAT INDUSTRIES
19-SEP-2019
19-SEP-2019
18-MAR-2020
-
2,177,700.00
-
-
2,177,700.00
217,770.00
29-FEB-2024
1,959,930.00
Cancelled
Cancelled
General
1050
NA
29-AUG-2020
-
-
-
Cancelled allotment. Allottee withdrawn the allotment.
1680
17
TIRUPATI
Tirupati
ELECTRONIC MFG CLUSTER - II
Plot No.103A
63500
VISHWASH ELECTRICALS AND ELECTRONICS
15-MAR-2022
19-MAR-2022
-
-
7,902,580.00
0.00
7,902,580.00
7,902,580.00
790,258.00
29-FEB-2024
7,112,322.00
Cancelled
Cancelled
General
4804
NA
14-MAR-2026
-
-
23-JUN-2022
Cancelled Allotment
768
18
TIRUPATI
Tirupati
ELECTRONIC MFG CLUSTER - II
CFC 1D
63510
S3 GROUPS
15-MAR-2022
19-MAR-2022
01-NOV-2022
-
8,455,300.00
0.00
8,455,300.00
8,455,300.00
6,297,922.00
29-FEB-2024
2,157,378.00
Cancelled
Notice Issued
BC
5140
NA
14-MAR-2026
-
-
23-JUN-2022
Allottee requested for cancellation of the allotment. Cancellation order issued on 21.06.2023
768
19
TIRUPATI
Tirupati
ELECTRONIC MFG CLUSTER - II
Plot-74
63731
SRIKALAHASTHI ENTERPRISES
31-MAR-2022
31-MAR-2022
-
-
7,922,320.00
0.00
7,922,320.00
7,922,320.00
792,232.00
29-FEB-2024
7,130,088.00
Cancelled
Cancelled
BC,Women
4816
NA
30-MAR-2026
-
-
14-JUL-2022
Cancelled Allotment
756
20
TIRUPATI
Tirupati
ELECTRONIC MFG CLUSTER - II
CFC 1A
63735
CTB ENTERPRISES
31-MAR-2022
31-MAR-2022
-
-
6,657,315.00
0.00
6,657,315.00
6,657,315.00
0.00
-
6,657,315.00
Cancelled
-
SC,Women
4047
NA
30-MAR-2026
-
-
-
Allottee requested for cancellation of allotment.
756
21
TIRUPATI
Tirupati
ELECTRONIC MFG CLUSTER - II
CFC 1B
63939
CTB ENTERPRISES
08-JUL-2022
09-JUL-2022
-
-
7,355,840.00
0.00
7,355,840.00
1,838,960.00
0.00
-
1,838,960.00
Cancelled
-
SC,Women
4064
NA
07-JUL-2024
-
-
18-NOV-2022
Allotment cancelled orders issued on 09.06.2023 Due to non payment of the land cost.
656
22
TIRUPATI
Tirupati
ELECTRONIC MFG CLUSTER - I
BIT -1
62899
M/s. INDUS HEALTHCARE
15-JUL-2021
15-JUL-2021
-
-
4,828,075.00
0.00
4,828,075.00
4,828,075.00
482,808.00
29-FEB-2024
4,345,267.00
Cancelled
Cancelled
General
2935
NA
14-JUL-2025
-
-
-
Cancelled Allotment
1015
23
TIRUPATI
Tirupati
ELECTRONIC MFG CLUSTER - II
87 and 88
64309
M/s. CHELICOME ELECTRONICS
01-MAR-2023
02-MAR-2023
-
-
101,491,768.00
0.00
101,491,768.00
101,491,768.00
5,970,104.00
29-FEB-2024
95,521,664.00
Cancelled
Cancelled
General
32984
NA
02-MAR-2025
-
-
27-JUL-2023
Cancellation order issued on 14.11.2023
420
24
TIRUPATI
Tirupati
IDA,TIRUPATI
land5
1236
TEJA PROCESSING UNIT
25-SEP-2003
25-SEP-2003
-
07-DEC-2006
2,124,938.00
-
-
2,124,938.00
0.00
-
2,124,938.00
Cancelled
Cancelled
Others
14167
G4
06-DEC-2008
-
-
-
Constructed shed, allotment cancelled possession resumed, allottee requested for restoration of allotment, report submitted to Head Office.
7518
25
TIRUPATI
Tirupati
IDA,TIRUPATI
Triangle_bit_land2
53886
M/s. Lellapalli AAC Blocks
03-NOV-2017
03-NOV-2017
-
-
3,199,200.00
1,599,600.00
1,599,600.00
1,599,600.00
0.00
-
1,599,600.00
Cancelled
Cancelled
SC
1200
NA
27-APR-2020
-
-
-
Cancelled allotment. Due to Non payment of land cost
2365
26
TIRUPATI
Tirupati
IDA,TIRUPATI
Triangle_bit_land3
53887
S M N FOOD PRODUCT
03-NOV-2017
03-NOV-2017
-
-
3,199,200.00
1,599,600.00
1,599,600.00
1,599,600.00
0.00
-
1,599,600.00
Cancelled
Cancelled
SC
1200
NA
27-APR-2020
-
-
-
Cancelled allotment. Due to Non Payment of land cost.
2365
27
TIRUPATI
Tirupati
IDA,TIRUPATI
Triangle_bit_land3
63094
MOHDEEP ENTERPRISES
13-DEC-2021
14-DEC-2021
-
-
4,496,400.00
2,000,000.00
2,496,400.00
624,100.00
0.00
-
624,100.00
Cancelled
Cancelled
SC,Women
1200
NA
12-DEC-2025
-
-
-
Cancelled Allotment on 14.07.2022
863
28
TIRUPATI
Tirupati
IP MADANNAPALEM
UDL 3
53780
DINESH ENTERPRISES
23-OCT-2017
23-OCT-2017
-
-
7,001,310.00
0.00
7,001,310.00
7,001,310.00
700,131.00
29-FEB-2024
6,301,179.00
Cancelled
Cancelled
General
8094
NA
27-FEB-2020
-
-
-
Allotment Cancelled.
2376
29
TIRUPATI
Tirupati
IP MADANNAPALEM
UDL 4
53783
KAJ ENGINEERING WORKS
23-OCT-2017
23-OCT-2017
-
-
7,001,310.00
0.00
7,001,310.00
7,001,310.00
700,131.00
29-FEB-2024
6,301,179.00
Cancelled
Cancelled
General
8094
NA
27-FEB-2020
-
-
-
cancelled
2376
30
TIRUPATI
Tirupati
IP MADANNAPALEM
UDL 5
53784
SHREENATH FIN TUBES
23-OCT-2017
23-OCT-2017
-
-
7,001,310.00
0.00
7,001,310.00
7,001,310.00
700,131.00
29-FEB-2024
6,301,179.00
Cancelled
Cancelled
General
8094
NA
27-FEB-2020
-
-
-
Cancellation orders issued 28.11.2017
2376
31
TIRUPATI
Tirupati
IP MADANNAPALEM
UDL 3,UDL 4
55180
NEXT POLYMERS LIMITED
02-MAR-2018
02-MAR-2018
-
-
14,002,620.00
0.00
14,002,620.00
14,002,620.00
1,400,262.00
29-FEB-2024
12,602,358.00
Cancelled
Cancelled
General
16188
NA
02-MAR-2023
-
-
-
Allotment cancelled due to non payment of land cost.
2246
32
TIRUPATI
Tirupati
IP MADANNAPALEM
UDL 4
56785
THREE TEE AUTO LOGISTICS PVT LTD
21-MAY-2018
21-MAY-2018
-
-
7,849,346.00
0.00
7,849,346.00
7,849,346.00
784,309.00
29-FEB-2024
7,065,037.00
Cancelled
Cancelled
General
8101
NA
21-MAY-2020
-
-
-
Allotment Cancelled due to non payment of land cost.
2166
33
TIRUPATI
Tirupati
IP MADANNAPALEM
UDL 4
59087
M/S. SRIMUKHA PRECISION PRODUCTS
19-JAN-2019
19-JAN-2019
11-JUN-2019
16-AUG-2019
7,843,086.00
0.00
7,843,086.00
7,843,086.00
784,309.00
29-FEB-2024
7,058,777.00
Cancelled
Cancellation Deed
General
8094
NA
15-AUG-2021
-
-
10-AUG-2021
Cancelled Allotment
1923
34
TIRUPATI
Tirupati
IP PAGALI UDL
UDL-1
56880
M/s SRI NIDHI HEALTH CARE
12-APR-2018
12-APR-2018
-
-
3,326,360.00
0.00
3,326,360.00
3,326,360.00
332,636.00
28-FEB-2024
2,993,724.00
Cancelled
Cancelled
Women-General
1500
NA
11-APR-2020
-
-
-
Allotment Cancelled.
2205
35
TIRUPATI
Tirupati
IP PAGALI
UDL - III-D
57768
M/s 7H TRADERS
30-AUG-2018
30-AUG-2018
-
-
4,973,400.00
2,000,000.00
2,973,400.00
2,973,400.00
497,790.00
29-FEB-2024
2,475,610.00
Cancelled
Cancelled
BC
2024
NA
29-AUG-2019
-
-
-
Allottee withdrawn the allotment.
2065
36
TIRUPATI
Tirupati
IP PAGALI UDL
UDL-1
61576
V V M AGRO INDUSTRIES
24-FEB-2020
24-FEB-2020
-
-
582,000.00
0.00
582,000.00
582,000.00
58,200.00
29-FEB-2024
523,800.00
Cancelled
Cancelled
General
1500
NA
23-FEB-2021
-
-
-
-
1522
37
TIRUPATI
Tirupati
IP PAGALI UDL
UDL-1B
62121
MAHAAS INDUSTRIES
16-DEC-2020
16-DEC-2020
-
-
465,600.00
0.00
465,600.00
465,600.00
97,000.00
29-FEB-2024
368,600.00
Cancelled
Cancelled
General
1200
NA
15-DEC-2024
-
-
-
Due to Non Payment.
1226
38
TIRUPATI
Tirupati
IP PAGALI UDL
UDL-1
62564
ELITE POLYMERS
05-MAR-2021
05-MAR-2021
-
-
582,000.00
0.00
582,000.00
582,000.00
58,200.00
29-FEB-2024
523,800.00
Cancelled
Cancelled
BC,Women
1500
NA
04-MAR-2025
-
-
-
Land allotted to company.
1147
39
TIRUPATI
Tirupati
UDL PAGALI - 3
UDL 3
63097
FELIX PHARMA
13-DEC-2021
14-DEC-2021
-
-
8,408,344.00
0.00
8,408,344.00
8,408,344.00
840,834.00
29-FEB-2024
7,567,510.00
Cancelled
Cancelled
BC,Women
11332
NA
12-DEC-2025
-
-
-
Cancelled Allotment
863
40
TIRUPATI
Tirupati
IP PAGALI 49.11(30.55)
UDL-III-A
63117
MANEEHIRA FOOD PROCESSING INDUSTRY
13-DEC-2021
14-DEC-2021
-
-
9,758,784.00
0.00
9,758,784.00
9,758,784.00
0.00
-
9,758,784.00
Cancelled
-
SC
13152
NA
12-DEC-2025
-
-
-
Cancelled Allotment on 14.07.2022
863
41
TIRUPATI
Tirupati
IP PAGALI 49.11(30.55)
UDL-III-A
64345
M/s RITHYA'S UPVC AND HARDWARE SOLUTIONS
01-MAR-2023
02-MAR-2023
-
-
10,764,187.00
0.00
10,764,187.00
10,764,187.00
1,074,518.00
29-FEB-2024
9,689,669.00
Cancelled
Cancelled
General
13176
NA
02-MAR-2025
-
-
28-JUL-2023
Cancelled Allotment
420
42
TIRUPATI
Tirupati
IP,Thatiparthy (UDL)
UDL -10
64300
SRIDEVA LAM PRIVATE LIMITED
01-MAR-2023
02-MAR-2023
24-MAR-2023
-
20,916,164.00
0.00
20,916,164.00
20,916,164.00
2,392,838.00
29-FEB-2024
18,523,326.00
Cancelled
Cancelled
General
38449
NA
02-MAR-2025
-
-
-
Cancelled order issued on 23.06.2023
420
43
TIRUPATI
Tirupati
IP, VELAMPEDU
UDL 2
62434
SPARKS CERAMICS PRIVATE LIMITED
19-FEB-2021
19-FEB-2021
-
-
26,143,620.00
0.00
26,143,620.00
26,143,620.00
4,604,384.00
29-FEB-2024
21,539,236.00
Cancelled
Cancelled
General
68799
NA
18-FEB-2025
-
-
-
Land cost to be paid
1161
44
TIRUPATI
Tirupati
IP, VELAMPEDU
UDL 3B,UDL 3C
64290
CITIZENPLUS PHARMACEUTICALS PVT LTD
01-MAR-2023
02-MAR-2023
-
-
16,582,860.00
0.00
16,582,860.00
16,582,860.00
1,592,850.00
29-FEB-2024
14,990,010.00
Cancelled
Cancelled
General
33705
NA
02-MAR-2025
-
-
31-JUL-2023
Cancellation orders issied on 14.11.2023.
420
45
TIRUPATI
Tirupati
IP, VELAMPEDU
UDL 11
64755
P.Rama Devi (SHREE VAISHNAVI INDUSTRIES)
23-JUN-2023
24-JUN-2023
-
-
2,044,998.00
1,002,433.00
1,042,565.00
1,042,565.00
0.00
-
1,042,565.00
Cancelled
Notice Issued
ST,Women
4075
NA
22-JUN-2025
-
-
08-SEP-2023
CAO issued on 06.02.2024
306
46
TIRUPATI
Tirupati
IP, Chinnapanduru -1
UDL-3A
60489
M/s.Nobel Garments
28-OCT-2019
28-OCT-2019
-
-
2,432,400.00
1,216,200.00
1,216,200.00
1,216,200.00
0.00
-
1,216,200.00
Cancelled
Cancelled
General
1200
NA
27-OCT-2020
-
-
-
Due to Non Payment
1641
47
TIRUPATI
Tirupati
IP, Chinnapanduru -1
UDL-3A1
60495
M/s. SR Garments
28-OCT-2019
28-OCT-2019
-
-
2,432,400.00
1,216,200.00
1,216,200.00
1,216,200.00
0.00
-
1,216,200.00
Cancelled
Cancelled
SC
1200
NA
27-OCT-2020
-
-
-
Cancelled the allottment. DUe to Non payment of land cost
1641
48
TIRUPATI
Tirupati
IP, Chinnapanduru -1
UDL-2-A/1
60891
Three Tee Auto Logistics Pvt Ltd
02-DEC-2019
02-DEC-2019
-
-
12,524,833.00
0.00
12,524,833.00
12,524,833.00
675,365.00
29-FEB-2024
11,849,468.00
Cancelled
Cancelled
General
6179
NA
01-DEC-2020
-
-
-
Due to Non payment
1606
49
TIRUPATI
Tirupati
IP,GAJULAMANDYAM
Land1
26323
LORD'S SECURITY MINIT LTD.
25-SEP-2003
25-SEP-2003
-
10-MAY-2004
1,315,478.00
-
-
1,315,478.00
0.00
-
1,315,478.00
-
Court Case
Others
39863
G4
10-MAY-2006
-
-
-
The allottee filed WP.No.24035/2007 in the High Court of AP,Hyderabad against the cancellation
7518
50
TIRUPATI
Tirupati
IP,GAJULAMANDYAM
Plot No.24,Plot No.25,Plot No.26,Plot No.27,Plot No.28,Plot No.29,Plot No.30,Plot No.31,Plot No.32
20211
O.R.DISTILLERIES (P) LIMITED
20-FEB-2004
20-FEB-2004
03-DEC-2007
20-FEB-2008
7,351,400.00
-
-
7,351,400.00
0.00
-
7,351,400.00
Cancelled
Cancelled
Others
153925
R1
10-JUL-2015
-
-
-
Resumed on 29.12.2014 @ 3.00 PM. Allottee requested for further EOT. Proposals submitted to H.O. for further orders.
7370
51
TIRUPATI
Tirupati
IP,GAJULAMANDYAM
Plot 41
14674
INNOVATIVE FOUNDARIES PVT LTD
03-APR-2007
03-APR-2007
02-AUG-2007
13-AUG-2007
2,090,300.00
-
-
2,090,300.00
0.00
-
2,090,300.00
Cancelled
Cancelled & Resumed
Others
20903
R1
12-AUG-2009
-
-
-
land in Possession of company and approval obtained
6232
52
TIRUPATI
Tirupati
IP,GAJULAMANDYAM
Shed No.1
26313
FUSION CHEMICALS & PRODUCTS (P) LTD
27-MAY-2009
27-MAY-2009
-
17-OCT-2011
80,510.00
-
-
80,510.00
0.00
-
80,510.00
Cancelled
Cancelled
Others
1895
R2
16-OCT-2013
-
-
31-OCT-2015
allotment cancelled. Allottee requested for restoration of allotment
5447
53
TIRUPATI
Tirupati
IP,GAJULAMANDYAM
PLOT NO.13-B
26361
DWANI CASTINGS
06-JUN-2009
06-JUN-2009
20-JUL-2010
31-JUL-2010
879,544.00
-
-
879,544.00
0.00
-
879,544.00
Cancelled
Cancellation Deed
SC
5277
R1
30-JUL-2012
-
-
23-SEP-2013
Cancelled and resumed on 15.02.2014 @ 3.30 PM. Further, request of the allottee restoration has considered on 11.07.2015, subject to implmentation of unit. But, the allottee has failed to implement the unit and the cancellation orders issued on 27.02.2021. Unilateral Deed of cancellation executed on 01.12.2021, Doc.No.8389/2021, dt:13.12.2021. However, he was given an opportunity to avail G.O.Ms.No.07, but, not yet responded.
5437
54
TIRUPATI
Tirupati
IP,GAJULAMANDYAM
Plot No.37-E
58872
MRL INDUSTRIES
27-DEC-2013
27-DEC-2013
-
-
6,434,960.00
4,434,960.00
2,000,000.00
2,000,000.00
0.00
-
2,000,000.00
Cancelled
Cancelled
SC
11493
R2
26-MAR-2020
-
-
-
-
3772
55
TIRUPATI
Tirupati
IP,GAJULAMANDYAM
LAND 1
62811
SRI MUNIVENKATA LORRY WEIGHBRIDGE
20-MAY-2021
20-MAY-2021
-
-
940,212.00
0.00
940,212.00
940,212.00
94,021.00
29-FEB-2024
846,191.00
Cancelled
Cancelled
General
533
NA
19-MAY-2025
-
-
-
Allottee requested for cancellation of allotment.
1071
56
TIRUPATI
Tirupati
IP,SRIKALAHASTI
A-1
26570
VIJAYALAKSHMI RE-ROLLING MILLS
10-OCT-1975
10-OCT-1975
-
04-AUG-1978
13,888.00
-
-
13,888.00
0.00
-
13,888.00
Cancelled
Cancelled & Resumed
Others
2904
R2
03-AUG-1980
-
-
-
Cancelled the allotment for non-implementation of the unit. Possession resumed. Cancellation deed in respect of Sale Agreement to be executed by the allottee.
17730
57
TIRUPATI
Tirupati
IP,SRIKALAHASTI
B-1,B2,B3
17098
HI-Q BATTERIES PVT LTD
11-SEP-2006
11-SEP-2006
-
11-AUG-2006
10,000.00
-
-
10,000.00
0.00
-
10,000.00
Cancelled
Cancelled
Others
4182
G4
30-JUN-2011
-
-
-
Allotment cancelled. Allottee requested for restoration. There after no initiation for implementation of unit. Resumption order to be issued.
6436
58
TIRUPATI
Tirupati
IP,SRIKALAHASTI
B5
26999
SIRI PLASTIC INDUSTRIES
15-JUL-2010
15-JUL-2010
30-NOV-2010
05-JAN-2011
836,000.00
-
-
836,000.00
0.00
-
836,000.00
Cancelled
Cancelled & Resumed
Women-General
1672
R1
31-AUG-2015
-
-
-
Sale Deed executed before implementation. Cancelled the allotment for non-implementation of the unit. Possession resumed. Cancellation deed in respect of sale deed to be executed by the allottee.
5033
59
TIRUPATI
Tirupati
IP,SRIKALAHASTI
B4
26979
G.R.R. PLASTICS
15-JUL-2010
15-JUL-2010
30-NOV-2010
05-JAN-2011
836,500.00
-
-
836,500.00
0.00
-
836,500.00
Cancelled
Cancelled & Resumed
Others
1673
R1
31-AUG-2015
-
-
-
Sale Deed executed before implementation. Cancelled the allotment for non-implementation of the unit. Possession resumed. Cancellation deed in respect of sale deed to be executed by the allottee.
5033
60
TIRUPATI
Tirupati
IP,VITTAIAHPALEM
UDL/A
52201
HI-TECH PIPES LIMITED
12-MAY-2017
12-MAY-2017
-
-
14,872,725.00
0.00
14,872,725.00
14,872,725.00
1,867,683.00
29-FEB-2024
13,005,042.00
Cancelled
Cancelled
General
101175
NA
11-MAY-2018
-
-
-
Allotment cancelled and EMD & deposit refunded.
2540
61
TIRUPATI
Tirupati
IP_GUNTAKINDAPALLI_LAO_SUJAN
UDL
58713
M/s. Sugen Life Sciences (P) Ltd.,
07-NOV-2012
07-NOV-2012
-
-
16,247,880.00
0.00
16,247,880.00
16,247,880.00
0.00
-
16,247,880.00
Cancelled
Cancelled
General
32376
NA
26-MAR-2020
-
-
-
Allotment cancelled since the allottee withdrawn application.
4187
62
TIRUPATI
Tirupati
IP_GUNTAKINDAPALLI_LAO_SUJAN
UDL
58883
Sugen Life Sciences (P) Ltd
06-AUG-2013
06-AUG-2013
-
-
12,820,071.00
0.00
12,820,071.00
12,820,071.00
0.00
-
12,820,071.00
Cancelled
Cancelled
General
32376
NA
21-MAR-2015
-
-
-
Cancelled
3915
63
TIRUPATI
Tirupati
IP_GUNTAKINDAPALLI_LAO_SUJAN
PLOT NO - 3
49719
M/s.Janany Cement Industries Pvt.Ltd
27-JUN-2016
27-JUN-2016
23-JAN-2017
24-APR-2017
9,868,950.00
-
-
9,868,950.00
993,514.00
29-FEB-2024
8,875,436.00
Cancelled
Cancelled & Resumed
General
29260
NA
23-APR-2019
-
-
-
Allottee withdrawn the allotment and cancellation orders issued on 06.02.2019
2859
64
TIRUPATI
Tirupati
IP_GUNTAKINDAPALLI_LAO_SUJAN
PLOT NO - 5
52704
M/s.Gee Gee Kay (P) Ltd
01-JUN-2017
01-JUN-2017
14-JUL-2017
14-JUL-2017
2,322,000.00
0.00
2,322,000.00
2,322,000.00
232,497.00
29-FEB-2024
2,089,503.00
Cancelled
Cancelled & Resumed
General
6961
R2
13-JUL-2019
-
-
01-APR-2018
Allotment cancelled and resumed
2520
65
TIRUPATI
Tirupati
IP_GUNTAKINDAPALLI_LAO_SUJAN
11-A
61171
THOTA BRICK INDUSTRIES
01-JAN-2020
01-JAN-2020
-
-
4,667,167.00
0.00
4,667,167.00
4,667,167.00
379,720.00
29-FEB-2024
4,287,447.00
Cancelled
Cancelled
General
8062
NA
31-DEC-2020
-
-
-
LAND COST TO BE PAID
1576
66
TIRUPATI
Tirupati
IP_GUNTAKINDAPALLI_LAO_SUJAN
5A
61553
M/s SANTHOSH CONSTRUCTION & ELECTRICALS
24-FEB-2020
24-FEB-2020
-
-
1,632,486.00
0.00
1,632,486.00
1,632,486.00
221,182.00
29-FEB-2024
1,411,304.00
Cancelled
Cancelled
BC
3466
NA
23-FEB-2021
-
-
-
Applicant withdrawn the allotment
1522
67
TIRUPATI
Tirupati
IP_GUNTAKINDAPALLI_LAO_SUJAN
5A
62190
M/s. KAVITHA BIOFUELS
16-DEC-2020
16-DEC-2020
-
-
1,632,486.00
0.00
1,632,486.00
1,632,486.00
0.00
-
1,632,486.00
Cancelled
Cancelled
SC
3466
NA
15-DEC-2024
-
-
-
Due to Non Payment.
1226
68
TIRUPATI
Tirupati
IP_GUNTAKINDAPALLI_LAO_SUJAN
5A
63091
M/s. PHARMACOP INDIA PRIVATE LIMITED
13-DEC-2021
14-DEC-2021
-
-
1,830,048.00
0.00
1,830,048.00
1,830,048.00
0.00
-
1,830,048.00
Cancelled
Cancelled
SC,Women
3466
NA
12-DEC-2025
-
-
-
Cancelled Allotment
863
69
TIRUPATI
Tirupati
IP_Kurukalva and Vikruthamala
UDL
58383
M/s. Reliance Prolific Traders (P) Ltd.,
23-JAN-2019
23-JAN-2019
-
-
346,821,280.00
0.00
346,821,280.00
346,821,280.00
0.00
-
346,821,280.00
Cancelled
Cancelled
General
553144
NA
22-JAN-2021
-
-
-
Cancelled Allotment.Due to non payment of land cost.
1919
70
TIRUPATI
Tirupati
IP_TIRUPATI
SHED No.5
28097
MURUGAN STEEL FURNITURE WORKS
20-APR-1989
20-APR-1989
-
01-MAY-1989
1.00
-
-
1.00
0.00
-
1.00
Cancelled
Cancelled
SC
101
NA
01-MAY-1991
-
-
-
cancelled
12789
71
TIRUPATI
Tirupati
IP_TIRUPATI
PLOT NO.44,PLOT NO.45
28144
VIJETHA PRINTERS (P) LTD.
12-OCT-1999
12-OCT-1999
30-OCT-1999
30-OCT-1999
908,840.00
-
-
908,840.00
0.00
-
908,840.00
Cancelled
Cancelled
Women-General
4545
G4
29-OCT-2001
-
-
-
APPOINTED LIQUIDATOR BY HIGH COURT OF A.P., HYDERABAD
8962
72
TIRUPATI
Tirupati
IP_TIRUPATI
SHED No. 3
28094
RAMANA CHEMICAL PRODUCTS
07-JUN-2014
07-JUN-2014
-
18-JUN-1999
71,460.00
-
-
71,460.00
0.00
-
71,460.00
Cancelled
Cancelled
SC
101
NA
07-JUN-2016
-
-
-
Cancelled letter issued on 23-FEB-2015.
3610
73
TIRUPATI
Tirupati
MSME,Ramireddypalli
Plot No.16,Plot No.17,Plot No.18,Plot No.19,Plot No.20,Plot No.21,Plot No.22,Plot No.23
57513
ANIMINI ENTERPRISES PRIVATE LIMITED
08-OCT-2018
08-OCT-2018
-
-
9,975,570.00
0.00
9,975,570.00
9,975,570.00
997,560.00
29-FEB-2024
8,978,010.00
Cancelled
Cancelled
Women-General
3978
NA
07-OCT-2019
-
-
-
Allottee Withdrawn application.
2026
74
TIRUPATI
Tirupati
MSME,Ramireddypalli
11
59062
M/s.haindavi foods
12-FEB-2019
12-FEB-2019
-
-
637,991.00
318,995.00
318,996.00
318,996.00
158,464.00
29-FEB-2024
160,532.00
Cancelled
Cancelled
BC
401
NA
26-MAR-2020
-
-
-
Cancelled Allotment.
1899
75
TIRUPATI
Tirupati
MSME,Ramireddypalli
34
59443
Sri Sai industries
28-FEB-2019
28-FEB-2019
-
-
593,700.00
0.00
593,700.00
593,700.00
59,370.00
29-FEB-2024
534,330.00
Cancelled
Cancelled
General
300
NA
23-APR-2020
-
-
-
Allotment cancelled for non payment of land cost.
1883
76
TIRUPATI
Tirupati
MSME,Ramireddypalli
7
59371
Thoguru Raj Kumar
28-FEB-2019
28-FEB-2019
20-SEP-2019
-
850,970.00
425,485.00
425,485.00
425,485.00
0.00
-
425,485.00
Cancelled
Cancelled
SC
430
NA
23-APR-2020
-
-
-
Due to Non Payment
1883
77
TIRUPATI
Tirupati
MSME,Ramireddypalli
49
59452
M/s.SRI SIDDESHWARA INDUSTRIES
28-FEB-2019
28-FEB-2019
-
-
868,781.00
0.00
868,781.00
868,781.00
107,460.00
29-FEB-2024
761,321.00
Cancelled
Cancelled
BC,Women
439
NA
23-APR-2020
-
-
-
Allotment cancelled for non payment of land cost
1883
78
TIRUPATI
Tirupati
MSME,Ramireddypalli
70,71
59447
M/s BALAJI RICE MILL
28-FEB-2019
28-FEB-2019
-
-
1,401,132.00
0.00
1,401,132.00
1,401,132.00
138,530.00
29-FEB-2024
1,262,602.00
Cancelled
Cancelled
Women
708
NA
23-APR-2020
-
-
-
Due to Non Payment.
1883
79
TIRUPATI
Tirupati
MSME,Ramireddypalli
58,59
60500
M/s. Sankar Shalini Industry
28-OCT-2019
28-OCT-2019
-
-
1,939,875.00
969,938.00
969,937.00
969,937.00
0.00
-
969,937.00
Cancelled
Cancelled
ST
875
NA
27-OCT-2020
-
-
22-FEB-2021
Cancelled allotment. Due to Non payment of land cost.
1641
80
TIRUPATI
Tirupati
MSME,Ramireddypalli
40
60686
M/s.Shallem Raj Polymers
15-NOV-2019
15-NOV-2019
01-JUN-2020
-
665,100.00
332,550.00
332,550.00
332,550.00
10.00
28-FEB-2024
332,540.00
Cancelled
Cancelled
SC
300
NA
14-NOV-2020
-
-
02-JUN-2021
Cancelled Allotment
1623
81
TIRUPATI
Tirupati
MSME,Ramireddypalli
2A
61845
M/s.SRI PARVATHI TURNING WORKS
16-MAY-2020
16-MAY-2020
-
-
1,161,708.00
0.00
1,161,708.00
1,161,708.00
0.00
-
1,161,708.00
Cancelled
Cancelled
General
524
NA
15-MAY-2024
-
-
22-FEB-2021
Due to non payment.
1440
82
TIRUPATI
Tirupati
MSME,Ramireddypalli
57
61846
M/s.DHARSHA INDUSTRIES
16-MAY-2020
16-MAY-2020
-
-
737,994.94
0.00
737,994.94
737,995.00
73,799.00
29-FEB-2024
664,196.00
Cancelled
Cancelled
SC_W
333
NA
15-MAY-2024
-
-
-
cancelled on 21.02.2021
1440
83
TIRUPATI
Tirupati
MSME,Ramireddypalli
48
61847
M/s.SRI LAKSHMI NARSIMHA PAPER PRODUCTS
16-MAY-2020
16-MAY-2020
19-AUG-2020
22-SEP-2020
665,100.00
0.00
665,100.00
665,100.00
66,610.00
29-FEB-2024
598,490.00
Cancelled
Deed Executed & Amount Refunded
Women-General
300
NA
21-SEP-2022
-
-
17-JAN-2022
Cancelled Allotment
1440
84
TIRUPATI
Tirupati
MSME,Ramireddypalli
49
61848
M/s.SHANVI PAPER PRODUCTS
16-MAY-2020
16-MAY-2020
-
-
971,445.00
0.00
971,445.00
971,445.00
0.00
-
971,445.00
Cancelled
Cancelled
Women-General
439
NA
15-MAY-2024
-
-
22-FEB-2021
-
1440
85
TIRUPATI
Tirupati
MSME,Ramireddypalli
60,61
61864
M/s.AGASYA ENTERPRICES
18-MAY-2020
18-MAY-2020
-
-
1,662,750.00
0.00
1,662,750.00
1,662,750.00
0.00
-
1,662,750.00
Cancelled
Cancelled
BC
750
NA
17-MAY-2024
-
-
-
Cancelled allotment. Due to Non Payment of land cost.
1438
86
TIRUPATI
Tirupati
MSME,Ramireddypalli
67
61865
M/s. S R ENTERPRISES
18-MAY-2020
18-MAY-2020
-
-
800,780.00
0.00
800,780.00
800,780.00
83,138.00
29-FEB-2024
717,642.00
Cancelled
Cancelled
BC
375
NA
17-MAY-2024
-
-
-
Cancelled allotment. Due to non payment of land cost.
1438
87
TIRUPATI
Tirupati
MSME,Ramireddypalli
50,55
61866
M/s. SRINIVASA ENTERPRISES
18-MAY-2020
18-MAY-2020
-
-
1,895,535.00
0.00
1,895,535.00
1,895,535.00
0.00
-
1,895,535.00
Cancelled
Cancelled
BC
856
NA
17-MAY-2024
-
-
-
-
1438
88
TIRUPATI
Tirupati
MSME,Ramireddypalli
16
61867
M/s.SRINIVASA ENGINEERING WORKS
18-MAY-2020
18-MAY-2020
-
-
2,054,073.00
0.00
2,054,073.00
2,054,073.00
0.00
-
2,054,073.00
Cancelled
Cancelled
General
927
NA
17-MAY-2024
-
-
22-FEB-2021
Cancelled allotment. Applicant withdrawn the allotment.
1438
89
TIRUPATI
Tirupati
MSME,Ramireddypalli
51
61870
M/s.BALAJI INDUSTRIES
18-MAY-2020
18-MAY-2020
-
-
947,768.00
0.00
947,768.00
947,768.00
94,777.00
29-FEB-2024
852,991.00
Cancelled
Cancelled
SC
428
NA
17-MAY-2024
-
-
22-FEB-2021
-
1438
90
TIRUPATI
Tirupati
MSME,Ramireddypalli
23
61871
M/s.YUVARAJ ENTERPRICES
18-MAY-2020
18-MAY-2020
-
-
1,149,958.00
0.00
1,149,958.00
1,149,958.00
0.00
-
1,149,958.00
Cancelled
Cancelled
BC
598
NA
17-MAY-2024
-
-
-
-
1438
91
TIRUPATI
Tirupati
MSME,Ramireddypalli
66
62290
MS BIOTECH
19-FEB-2021
19-FEB-2021
-
-
831,375.00
0.00
831,375.00
831,375.00
0.00
-
831,375.00
Cancelled
Cancelled
SC,Women
375
NA
18-FEB-2025
-
-
-
Allotte with drawn the allotment 05.06.2021
1161
92
TIRUPATI
Tirupati
MSME,Ramireddypalli
50
62775
LOVELY ENTERPRISE
20-MAY-2021
20-MAY-2021
-
-
948,876.00
0.00
948,876.00
948,876.00
94,888.00
29-FEB-2024
853,988.00
Cancelled
Cancelled
General
428
NA
19-MAY-2025
-
-
-
Cancelled Allotment
1071
93
TIRUPATI
Tirupati
MSME,Ramireddypalli
58,59,68,69
62799
NIDHI FLY ASH BRICK INDUSTRY
20-MAY-2021
20-MAY-2021
-
-
3,839,844.00
0.00
3,839,844.00
3,839,844.00
0.00
-
3,839,844.00
Cancelled
Cancelled
ST,Women
1732
NA
19-MAY-2025
-
-
-
Cancelled Allotment
1071
94
TIRUPATI
Tirupati
MSME,Ramireddypalli
51
62883
SIDDHARTH INDUSTRIES
15-JUL-2021
15-JUL-2021
-
-
948,876.00
474,438.00
474,438.00
474,438.00
0.00
-
474,438.00
Cancelled
Cancelled
SC
428
NA
14-JUL-2025
-
-
-
Cancelled Allotment
1015
95
TIRUPATI
Tirupati
MSME,Ramireddypalli
51
63518
KOTALA PADMAJA GARMENT INDUSTRY
15-MAR-2022
19-MAR-2022
-
-
948,876.00
474,438.00
474,438.00
474,438.00
94,888.00
29-FEB-2024
379,550.00
Cancelled
Cancelled
Women,General
428
NA
14-MAR-2026
-
-
02-AUG-2022
Cancelled Allotment. Due to Non Payment
768
96
TIRUPATI
Tirupati
MSME,Ramireddypalli
2A
63519
KCR INDUSTRIES
15-MAR-2022
19-MAR-2022
-
-
1,161,708.00
0.00
1,161,708.00
1,161,708.00
116,171.00
29-FEB-2024
1,045,537.00
Cancelled
Cancelled
General
524
NA
14-MAR-2026
-
-
12-MAY-2022
Cancelled Allotment. Due to Non Payment
768
97
TIRUPATI
Tirupati
MSME,Ramireddypalli
2A
64630
M/s SRI SAI INDUSTRIES
23-JUN-2023
24-JUN-2023
-
-
1,280,475.00
0.00
1,280,475.00
1,280,475.00
128,048.00
29-FEB-2024
1,152,427.00
Cancelled
Cancelled
General
525
NA
22-JUN-2025
-
-
13-SEP-2023
CAO issued on 07.02.2024
306