S.No  |  DISTRICT  |  ZONE  |  INDUSTRIAL PARK  |  PLOT NO  |  ALLOTMENT NUMBER  |  NAME OF THE INDUSTRY  |  ALLOTMENT DATE  |  PROVISIONAL ALLOTMENT DATE  |  FINAL ALLOTMENT DATE  |  DATE OF PHYSICAL POSSESSION  |  ALLOTMENT VALUE  |  REBATE AMOUNT  |  NET ALLOTMENT VALUE  |  ADVANCE TO BE PAID  |  AMOUNT RECEIVED  |  LAST PAID DATE  |  BALANCE ADVANCE AMOUNT  |  STATUS OF ALLOTMENT  |  CANCELLATION  |  CATEGORY OF ALLOTMENT  |  EXTENT IN SQM  |  IMPLEMENTATION STATUS CODE NEW  |  IMPLEMENTATION DUE DATE  |  DCP DATE  |  EOT PERIOD  |  NOTICE ISSUED DATE  |  IMPL ZM REMARKS  |  ALLOTMENT AGE IN DAYS  |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
GUNTUR |
Bapatla |
AN CHIRALA |
216,245 |
63531 |
SRI VENKATESWARA AUTO GARAGE BUS & LORRY WORKSHOP/NAGAM PARVATHI |
15-MAR-2022 |
01-APR-2022 |
15-APR-2023 |
- |
785,538.00
|
392,769.00 |
392,769.00 |
392,769.00 |
147,037.00 |
29-FEB-2024 |
245,732.00 |
Final Allotment |
NA |
BC,Women |
351 |
NA |
- |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
er released |
750 |
2 |
GUNTUR |
Bapatla |
AN CHIRALA |
29 |
63640 |
BISMILLAH LORRY BODY BUILDING WORKS |
31-MAR-2022 |
01-APR-2022 |
16-AUG-2022 |
- |
590,832.00
|
0.00 |
590,832.00 |
590,832.00 |
58,412.00 |
29-FEB-2024 |
532,420.00 |
Final Allotment |
- |
BC |
264 |
NA |
- |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
750 |
3 |
GUNTUR |
Bapatla |
AN CHIRALA |
111 |
63683 |
SRI SRINIVASA AUTOMOBILES & SERVICE CENTRE/GANGULA MADHAVI |
31-MAR-2022 |
01-APR-2022 |
15-APR-2023 |
- |
369,270.00
|
0.00 |
369,270.00 |
369,270.00 |
36,927.00 |
29-FEB-2024 |
332,343.00 |
Final Allotment |
- |
BC,Women |
165 |
NA |
- |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
750 |
4 |
GUNTUR |
Bapatla |
AN CHIRALA |
210 |
63694 |
M/s. Anitha Engineering Works |
31-MAR-2022 |
01-APR-2022 |
29-APR-2023 |
- |
559,500.00
|
279,750.00 |
279,750.00 |
279,750.00 |
0.00 |
- |
279,750.00 |
Final Allotment |
- |
SC |
250 |
NA |
- |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
750 |
5 |
GUNTUR |
Bapatla |
AN CHIRALA |
70 |
63710 |
M/s. Nageena Industries |
31-MAR-2022 |
01-APR-2022 |
30-AUG-2022 |
- |
425,220.00
|
212,610.00 |
212,610.00 |
212,610.00 |
42,746.00 |
29-FEB-2024 |
169,864.00 |
Final Allotment |
- |
BC |
190 |
NA |
- |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
750 |
6 |
GUNTUR |
Bapatla |
AN CHIRALA |
24 |
63711 |
KS WELDING WORKS/SHAIK KARIMOON |
31-MAR-2022 |
01-APR-2022 |
25-MAR-2023 |
- |
402,840.00
|
0.00 |
402,840.00 |
402,840.00 |
39,104.00 |
29-FEB-2024 |
363,736.00 |
Final Allotment |
- |
BC,Women |
180 |
NA |
- |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
750 |
7 |
GUNTUR |
Bapatla |
AN CHIRALA |
33 |
63734 |
MEKA SUNITHA |
31-MAR-2022 |
01-APR-2022 |
30-AUG-2022 |
- |
458,790.00
|
229,395.00 |
229,395.00 |
229,395.00 |
0.00 |
- |
229,395.00 |
Final Allotment |
- |
SC,Women |
205 |
NA |
- |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
750 |
8 |
GUNTUR |
Bapatla |
AN CHIRALA |
35,36 |
63940 |
M/s. OM SIVA SAI GARAGE |
08-JUL-2022 |
22-JUL-2022 |
18-MAY-2023 |
- |
944,436.00
|
- |
- |
944,436.00 |
94,444.00 |
29-FEB-2024 |
849,992.00 |
Final Allotment |
- |
General |
422 |
NA |
- |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
638 |
9 |
GUNTUR |
Bapatla |
AN CHIRALA |
37,38 |
63941 |
M/s. Bhadradri Ramayya Garage |
08-JUL-2022 |
22-JUL-2022 |
09-MAY-2023 |
- |
962,340.00
|
0.00 |
962,340.00 |
962,340.00 |
96,234.00 |
29-FEB-2024 |
866,106.00 |
Final Allotment |
- |
General |
430 |
NA |
- |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
638 |
10 |
GUNTUR |
Bapatla |
AN CHIRALA |
51,52 |
63942 |
KONDRU RAGHAVENDRA RAO |
08-JUL-2022 |
21-JUL-2022 |
25-MAR-2023 |
- |
805,680.00
|
0.00 |
805,680.00 |
805,680.00 |
0.00 |
- |
805,680.00 |
Final Allotment |
- |
SC |
360 |
NA |
- |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
639 |
11 |
GUNTUR |
Bapatla |
AN CHIRALA |
213,214 |
63948 |
ZEE TECH HYDRAULICS/SHAIK SADIYA |
08-JUL-2022 |
22-JUL-2022 |
09-FEB-2023 |
- |
1,119,000.00
|
0.00 |
1,119,000.00 |
1,119,000.00 |
111,900.00 |
29-FEB-2024 |
1,007,100.00 |
Final Allotment |
NA |
BC,Women |
500 |
NA |
- |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
638 |
12 |
GUNTUR |
Bapatla |
AN CHIRALA |
397,398,407 |
64157 |
HASEENA BUS & LORRY BODY BUILDING WORKS |
27-DEC-2022 |
28-JAN-2023 |
29-APR-2023 |
- |
1,016,052.00
|
0.00 |
1,016,052.00 |
1,016,052.00 |
101,606.00 |
29-FEB-2024 |
914,446.00 |
Final Allotment |
- |
BC,Women |
454 |
NA |
26-DEC-2024 |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
448 |
13 |
GUNTUR |
Bapatla |
AN CHIRALA |
19,20 |
64158 |
BATTULA SUNITHA |
27-DEC-2022 |
28-JAN-2023 |
29-APR-2023 |
- |
805,680.00
|
402,840.00 |
402,840.00 |
402,840.00 |
0.00 |
- |
402,840.00 |
Final Allotment |
- |
SC,Women |
360 |
NA |
26-DEC-2024 |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
448 |
14 |
GUNTUR |
Bapatla |
AN CHIRALA |
34 |
64163 |
BATTULA VIJAY KUMAR |
27-DEC-2022 |
17-JAN-2023 |
04-SEP-2023 |
- |
402,840.00
|
0.00 |
402,840.00 |
402,840.00 |
0.00 |
- |
402,840.00 |
Final Allotment |
- |
SC |
180 |
NA |
26-DEC-2024 |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
459 |
15 |
GUNTUR |
Bapatla |
AN CHIRALA |
101 |
64164 |
MANCHALA ALEKYA |
27-DEC-2022 |
06-JAN-2023 |
10-MAY-2023 |
- |
577,404.00
|
0.00 |
577,404.00 |
577,404.00 |
0.00 |
- |
577,404.00 |
Final Allotment |
- |
SC,Technocrat,Women |
258 |
NA |
26-DEC-2024 |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
470 |
16 |
GUNTUR |
Bapatla |
AN CHIRALA |
100 |
64176 |
ROYAL MOTORS MECHANICAL SHOP |
27-DEC-2022 |
17-JAN-2023 |
09-MAY-2023 |
- |
570,690.00
|
0.00 |
570,690.00 |
570,690.00 |
57,740.00 |
29-FEB-2024 |
512,950.00 |
Final Allotment |
- |
BC |
255 |
NA |
26-DEC-2024 |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
459 |
17 |
GUNTUR |
Bapatla |
AN CHIRALA |
62 |
64178 |
BISMILLAH FOUNDRY WORKS/SHAIK SHAHEDA |
27-DEC-2022 |
17-JAN-2023 |
09-MAY-2023 |
- |
447,600.00
|
0.00 |
447,600.00 |
447,600.00 |
44,984.00 |
29-FEB-2024 |
402,616.00 |
Final Allotment |
- |
BC,Women |
200 |
NA |
26-DEC-2024 |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
459 |
18 |
GUNTUR |
Bapatla |
AN CHIRALA |
67 |
64189 |
M/s Rathna Auto Garage |
27-DEC-2022 |
13-JAN-2023 |
05-SEP-2023 |
- |
362,556.00
|
181,278.00 |
181,278.00 |
181,278.00 |
0.00 |
- |
181,278.00 |
Final Allotment |
NA |
SC |
195 |
NA |
26-DEC-2024 |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
Final Allotment orders has issued. |
463 |
19 |
GUNTUR |
Bapatla |
AN CHIRALA |
63 |
64191 |
M/s. Aasha Enterprises |
27-DEC-2022 |
17-JAN-2023 |
22-AUG-2023 |
- |
447,600.00
|
0.00 |
447,600.00 |
447,600.00 |
0.00 |
- |
447,600.00 |
Final Allotment |
- |
SC |
200 |
NA |
26-DEC-2024 |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
459 |
20 |
GUNTUR |
Bapatla |
AN CHIRALA |
78,79 |
64214 |
M/s. Sneha Industries |
27-DEC-2022 |
09-JAN-2023 |
16-SEP-2023 |
- |
895,200.00
|
447,600.00 |
447,600.00 |
447,600.00 |
0.00 |
- |
447,600.00 |
Final Allotment |
- |
SC |
400 |
NA |
26-DEC-2024 |
- |
- |
- |
Final Allotment orders had issued.
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
467 |
21 |
GUNTUR |
Bapatla |
AN CHIRALA |
229,230,231,232 |
64221 |
M/s Chandra Automobiles |
27-DEC-2022 |
17-JAN-2023 |
28-APR-2023 |
- |
1,438,139.00
|
0.00 |
1,438,139.00 |
1,438,139.00 |
0.00 |
- |
1,438,139.00 |
Final Allotment |
- |
SC |
612 |
NA |
26-DEC-2024 |
- |
- |
- |
Road side Premium to be paid
|
459 |
22 |
GUNTUR |
Bapatla |
AN CHIRALA |
42,43 |
64233 |
M/s. FRIENDS AUTO GARAGE |
27-DEC-2022 |
28-JAN-2023 |
05-SEP-2023 |
- |
939,960.00
|
445,832.00 |
494,128.00 |
494,128.00 |
0.00 |
- |
494,128.00 |
Final Allotment |
NA |
SC |
400 |
NA |
26-DEC-2024 |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
448 |
23 |
GUNTUR |
Bapatla |
AN CHIRALA |
71,72 |
64360 |
M/s. Prakash Garage |
01-MAR-2023 |
02-MAR-2023 |
15-SEP-2023 |
- |
913,104.00
|
456,552.00 |
456,552.00 |
456,552.00 |
0.00 |
- |
456,552.00 |
Final Allotment |
NA |
SC |
400 |
NA |
02-MAR-2025 |
- |
- |
- |
Final Allotment orders has been issued.
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
415 |
24 |
GUNTUR |
Bapatla |
AN CHIRALA |
85,86 |
64414 |
Joshika Bakers and Restaurant |
01-MAR-2023 |
02-MAR-2023 |
25-JUL-2023 |
- |
1,141,380.00
|
951,250.00 |
190,130.00 |
190,130.00 |
0.00 |
- |
190,130.00 |
Final Allotment |
- |
SC |
500 |
NA |
02-MAR-2025 |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
415 |
25 |
GUNTUR |
Bapatla |
AN CHIRALA |
215 |
64611 |
SAI WELDING WORKS |
23-JUN-2023 |
30-JUN-2023 |
23-FEB-2024 |
- |
1,122,475.00
|
0.00 |
1,122,475.00 |
1,122,475.00 |
55,950.00 |
29-FEB-2024 |
1,066,525.00 |
Final Allotment |
- |
BC |
250 |
NA |
22-JUN-2025 |
- |
- |
- |
Final allotment orders has been issued.
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
295 |
26 |
GUNTUR |
Bapatla |
AN CHIRALA |
139 |
64615 |
BISMILLAH TINKERING WORKS/SHAIK GOUSE |
23-JUN-2023 |
30-JUN-2023 |
07-FEB-2024 |
- |
342,414.00
|
0.00 |
342,414.00 |
171,207.00 |
33,570.00 |
29-FEB-2024 |
137,637.00 |
Final Allotment |
Notice Issued |
BC |
150 |
NA |
22-JUN-2025 |
- |
- |
19-AUG-2023 |
Final Allotment orders has been issued.
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
295 |
27 |
GUNTUR |
Bapatla |
AN CHIRALA |
275 |
64614 |
SRINU BRAKE & HYDRAULIC PIPE WORKS |
23-JUN-2023 |
30-JUN-2023 |
31-AUG-2023 |
- |
376,655.00
|
0.00 |
376,655.00 |
376,655.00 |
36,927.00 |
29-FEB-2024 |
339,728.00 |
Final Allotment |
- |
BC |
165 |
NA |
22-JUN-2025 |
- |
- |
- |
Allottee paid 50% of the land cost so executed the final allotment order.
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
295 |
28 |
GUNTUR |
Bapatla |
AN CHIRALA |
57 |
64616 |
SRI VIGNESHWARA MECHANICAL WORKS |
23-JUN-2023 |
30-JUN-2023 |
29-AUG-2023 |
- |
1,251,784.00
|
0.00 |
1,251,784.00 |
1,251,784.00 |
89,042.00 |
29-FEB-2024 |
1,162,742.00 |
Final Allotment |
NA |
BC,Women |
279 |
NA |
22-JUN-2025 |
- |
- |
- |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
295 |
29 |
GUNTUR |
Bapatla |
AN CHIRALA |
132 |
64637 |
PRABHU BEEDING WORKS |
23-JUN-2023 |
28-JUN-2023 |
12-OCT-2023 |
- |
335,700.00
|
0.00 |
335,700.00 |
83,925.00 |
0.00 |
- |
83,925.00 |
Final Allotment |
- |
SC |
150 |
NA |
22-JUN-2025 |
- |
- |
19-AUG-2023 |
Final Allotment letter has been issued. |
297 |
30 |
GUNTUR |
Bapatla |
AN CHIRALA |
107 |
64641 |
SRI LAKSHMI VENKATESWARA AUTOMOBILES |
23-JUN-2023 |
30-JUN-2023 |
31-OCT-2023 |
- |
362,556.00
|
0.00 |
362,556.00 |
181,278.00 |
36,256.00 |
29-FEB-2024 |
145,022.00 |
Final Allotment |
- |
General |
162 |
NA |
22-JUN-2025 |
- |
- |
21-AUG-2023 |
Final Allotment orders has been issued. |
295 |
31 |
GUNTUR |
Bapatla |
AN CHIRALA |
64 |
64646 |
JYOTHSNA MOTOR MECHANICAL WORKS |
23-JUN-2023 |
28-JUN-2023 |
23-AUG-2023 |
- |
443,124.00
|
0.00 |
443,124.00 |
110,781.00 |
0.00 |
- |
110,781.00 |
Final Allotment |
- |
SC,Women |
198 |
NA |
22-JUN-2025 |
- |
- |
- |
Final Allotment order has been issued.
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
297 |
32 |
GUNTUR |
Bapatla |
AN CHIRALA |
135 |
64671 |
MADHAVA AUTOMOBILES |
23-JUN-2023 |
30-JUN-2023 |
23-AUG-2023 |
- |
335,700.00
|
0.00 |
335,700.00 |
167,850.00 |
33,570.00 |
29-FEB-2024 |
134,280.00 |
Final Allotment |
- |
General |
150 |
NA |
22-JUN-2025 |
- |
- |
- |
Final Allotment Order has been issued.
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
295 |
33 |
GUNTUR |
Bapatla |
AN CHIRALA |
74 |
64692 |
BISMILLAH AUTOMOBILES SHOP |
23-JUN-2023 |
30-JUN-2023 |
31-OCT-2023 |
- |
447,600.00
|
0.00 |
447,600.00 |
223,800.00 |
40,284.00 |
29-FEB-2024 |
183,516.00 |
Final Allotment |
NA |
BC |
200 |
NA |
22-JUN-2025 |
- |
- |
21-AUG-2023 |
Final Allotment orders has been issued. |
295 |
34 |
GUNTUR |
Bapatla |
AN CHIRALA |
73 |
64693 |
MADINA LORRY BODY BUILDING WORKS |
23-JUN-2023 |
30-JUN-2023 |
31-OCT-2023 |
- |
447,600.00
|
0.00 |
447,600.00 |
223,800.00 |
40,284.00 |
29-FEB-2024 |
183,516.00 |
Final Allotment |
- |
BC |
200 |
NA |
22-JUN-2025 |
- |
- |
21-AUG-2023 |
Final Allotment orders has been issued. |
295 |
35 |
GUNTUR |
Bapatla |
AN CHIRALA |
207 |
64695 |
AYAN PAINTING WORKS |
23-JUN-2023 |
30-JUN-2023 |
21-AUG-2023 |
- |
559,500.00
|
0.00 |
559,500.00 |
279,750.00 |
55,950.00 |
29-FEB-2024 |
223,800.00 |
Final Allotment |
- |
General |
250 |
NA |
22-JUN-2025 |
- |
- |
- |
Final Allotment Order has been issued.
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
295 |
36 |
GUNTUR |
Bapatla |
AN CHIRALA |
140 |
64696 |
SRI VENKATESWARA MECHANICAL WORKS |
23-JUN-2023 |
30-JUN-2023 |
31-OCT-2023 |
- |
335,700.00
|
0.00 |
335,700.00 |
167,850.00 |
33,570.00 |
29-FEB-2024 |
134,280.00 |
Final Allotment |
- |
General |
150 |
NA |
22-JUN-2025 |
- |
- |
17-AUG-2023 |
Final Allotment orders has been issued. |
295 |
37 |
GUNTUR |
Bapatla |
AN CHIRALA |
110 |
64700 |
M/s. Bhavishya Engineering Works |
23-JUN-2023 |
30-JUN-2023 |
08-NOV-2023 |
- |
369,270.00
|
0.00 |
369,270.00 |
369,270.00 |
36,927.00 |
29-FEB-2024 |
332,343.00 |
Final Allotment |
- |
General |
165 |
NA |
22-JUN-2025 |
- |
- |
19-AUG-2023 |
Final Allotment orders has been issued. |
295 |
38 |
GUNTUR |
Bapatla |
AN CHIRALA |
48 |
64702 |
CHANDU AUTOMOBILES |
23-JUN-2023 |
30-JUN-2023 |
15-SEP-2023 |
- |
402,840.00
|
0.00 |
402,840.00 |
201,420.00 |
40,284.00 |
29-FEB-2024 |
161,136.00 |
Final Allotment |
- |
BC |
180 |
NA |
22-JUN-2025 |
- |
- |
21-AUG-2023 |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
295 |
39 |
GUNTUR |
Bapatla |
AN CHIRALA |
177 |
64737 |
AZMEER PAINTING & DENTING WORKS |
23-JUN-2023 |
30-JUN-2023 |
23-JAN-2024 |
- |
342,414.00
|
0.00 |
342,414.00 |
171,207.00 |
33,570.00 |
29-FEB-2024 |
137,637.00 |
Final Allotment |
- |
Women,General |
150 |
NA |
22-JUN-2025 |
- |
- |
19-AUG-2023 |
Covered under 22- A List, Pursuing with Dist Collector , Bapatla for removal from 22-A list as Award was passed infavour of APIIC
|
295 |
40 |
GUNTUR |
Bapatla |
AN CHIRALA |
130 |
64951 |
M/s. Lakshmi mechanical works |
20-NOV-2023 |
21-NOV-2023 |
31-JAN-2024 |
- |
342,414.00
|
0.00 |
342,414.00 |
171,207.00 |
33,570.00 |
29-FEB-2024 |
137,637.00 |
Final Allotment |
- |
General |
150 |
R3 |
19-NOV-2025 |
- |
- |
30-DEC-2023 |
Final Allotment order has issued. |
151 |
41 |
GUNTUR |
Bapatla |
AN CHIRALA |
408 |
64961 |
BISMILLAH WELDING WORKS |
20-NOV-2023 |
21-NOV-2023 |
31-JAN-2024 |
- |
262,517.00
|
0.00 |
262,517.00 |
131,259.00 |
25,737.00 |
29-FEB-2024 |
105,522.00 |
Final Allotment |
NA |
BC |
115 |
R3 |
19-NOV-2025 |
- |
- |
30-DEC-2023 |
Final Allotment order has issued. |
151 |
42 |
GUNTUR |
Bapatla |
AN CHIRALA |
148 |
64984 |
RIYAZ AUTO GARAGE |
20-NOV-2023 |
21-NOV-2023 |
03-FEB-2024 |
- |
342,414.00
|
0.00 |
342,414.00 |
171,207.00 |
33,570.00 |
29-FEB-2024 |
137,637.00 |
Final Allotment |
- |
General |
150 |
R3 |
19-NOV-2025 |
- |
- |
30-DEC-2023 |
Final Allotment orders had issued. |
151 |
43 |
GUNTUR |
Bapatla |
AN CHIRALA |
147 |
64985 |
BISMILLAH CABIN PHOTO LIGHTING WORKS |
20-NOV-2023 |
21-NOV-2023 |
31-JAN-2024 |
- |
342,414.00
|
0.00 |
342,414.00 |
171,207.00 |
33,570.00 |
29-FEB-2024 |
137,637.00 |
Final Allotment |
- |
BC |
150 |
R3 |
19-NOV-2025 |
- |
- |
30-DEC-2023 |
Final Allotment order has issued. |
151 |
44 |
GUNTUR |
Bapatla |
AN CHIRALA |
131 |
65000 |
M/s. Naseera Industries |
20-NOV-2023 |
21-NOV-2023 |
31-JAN-2024 |
- |
335,700.00
|
0.00 |
335,700.00 |
167,850.00 |
33,570.00 |
29-FEB-2024 |
134,280.00 |
Final Allotment |
- |
BC |
150 |
R3 |
19-NOV-2025 |
- |
- |
30-DEC-2023 |
Final Allotment order has issued. |
151 |
45 |
GUNTUR |
Bapatla |
AN CHIRALA |
5 |
65047 |
MADINA AUTO GARAGE |
20-NOV-2023 |
21-NOV-2023 |
31-JAN-2024 |
- |
443,124.00
|
0.00 |
443,124.00 |
221,562.00 |
44,412.00 |
29-FEB-2024 |
177,150.00 |
Final Allotment |
- |
BC |
198 |
R3 |
19-NOV-2025 |
- |
- |
30-DEC-2023 |
Final Allotment order has issued. |
151 |
46 |
GUNTUR |
Bapatla |
Nagarajupalli |
PLOT NO.03 |
61721 |
ADS FOOD PRODUCTS |
29-APR-2020 |
29-APR-2020 |
25-MAR-2021 |
- |
679,896.00
|
339,948.00 |
339,948.00 |
339,948.00 |
0.00 |
- |
339,948.00 |
Final Allotment |
Notice Issued |
SC |
4047 |
NA |
28-APR-2024 |
- |
- |
14-JUN-2021 |
Proposals send to Head office to grand permission for sale agreement due to delay in conducting of survey of lands and fixing the boundries. |
1452 |
47 |
GUNTUR |
Guntur |
AN_GUNTUR_PHASE_IV |
38 BL.22-B |
64745 |
M/s. SJ Automobile Works |
23-JUN-2023 |
30-JUN-2023 |
21-OCT-2023 |
- |
298,312.00
|
149,156.00 |
149,156.00 |
74,578.00 |
0.00 |
- |
74,578.00 |
Final Allotment |
- |
SC |
28 |
NA |
22-JUN-2025 |
- |
- |
- |
Final Allotment orders has been issued. |
295 |
48 |
GUNTUR |
Palnadu |
MSME-PIDUGURALLA |
81 |
64138 |
ANAM HYDRALIC SPARE WORK SHOP |
27-DEC-2022 |
09-JAN-2023 |
15-SEP-2023 |
- |
299,887.00
|
0.00 |
299,887.00 |
299,887.00 |
29,401.00 |
29-FEB-2024 |
270,486.00 |
Final Allotment |
- |
Women |
97 |
NA |
26-DEC-2024 |
- |
- |
- |
Final Allotment orders has issued. |
467 |
49 |
GUNTUR |
Palnadu |
MSME-PIDUGURALLA |
22 |
64725 |
SHALOM ENGINEERING WORKS |
23-JUN-2023 |
30-JUN-2023 |
12-OCT-2023 |
- |
303,100.00
|
151,550.00 |
151,550.00 |
151,550.00 |
0.00 |
- |
151,550.00 |
Final Allotment |
- |
SC |
100 |
NA |
22-JUN-2025 |
- |
- |
19-AUG-2023 |
Final Allotment orders has been issued. |
295 |
50 |
GUNTUR |
Palnadu |
MSME-PIDUGURALLA |
97 |
65020 |
SRI NAGA LAKSHMI LORRY MECHANICAL WORKS |
20-NOV-2023 |
21-NOV-2023 |
02-JAN-2024 |
- |
245,511.00
|
0.00 |
245,511.00 |
245,511.00 |
24,551.00 |
29-FEB-2024 |
220,960.00 |
Final Allotment |
NA |
Women |
81 |
R3 |
19-NOV-2025 |
- |
- |
- |
Final Allotment orders has been issued. |
151 |
51 |
GUNTUR |
Palnadu |
MSME-PIDUGURALLA |
82 |
65019 |
JAKIR A TO Z CAR GARRAGE |
20-NOV-2023 |
21-NOV-2023 |
02-JAN-2024 |
- |
392,636.00
|
0.00 |
392,636.00 |
392,636.00 |
38,494.00 |
29-FEB-2024 |
354,142.00 |
Final Allotment |
- |
BC |
127 |
R3 |
19-NOV-2025 |
- |
- |
- |
Final Allotment orders has been issued. |
151 |
52 |
GUNTUR |
Palnadu |
MSME-PIDUGURALLA |
20 |
65188 |
MUSKAN FOUNDRY WORKS |
20-NOV-2023 |
21-NOV-2023 |
31-JAN-2024 |
- |
245,511.00
|
0.00 |
245,511.00 |
245,511.00 |
24,551.00 |
29-FEB-2024 |
220,960.00 |
Final Allotment |
- |
BC,Women |
81 |
R3 |
19-NOV-2025 |
- |
- |
30-DEC-2023 |
Final Allotment order has issued. |
151 |
53 |
GUNTUR |
Palnadu |
MSME-PIDUGURALLA |
29 |
65356 |
MUSTAFA TYRE WORKS |
22-DEC-2023 |
23-DEC-2023 |
23-JAN-2024 |
- |
245,511.00
|
0.00 |
245,511.00 |
122,756.00 |
24,551.00 |
29-FEB-2024 |
98,205.00 |
Final Allotment |
- |
BC,Women |
81 |
R3 |
26-DEC-2025 |
- |
- |
- |
Final allotment orders has been issued. |
119 |
54 |
GUNTUR |
Palnadu |
MSME-RAYAVARAM |
102,103,104,105 |
64935 |
M/s MSR AUTOMOBILE FILTERS |
20-NOV-2023 |
21-NOV-2023 |
04-MAR-2024 |
- |
466,800.00
|
0.00 |
466,800.00 |
116,700.00 |
0.00 |
- |
116,700.00 |
Final Allotment |
- |
SC |
1200 |
R3 |
19-NOV-2025 |
- |
- |
30-DEC-2023 |
Final allotment orders has issued. |
151 |
55 |
GUNTUR |
Palnadu |
MSME-RAYAVARAM |
70 |
65016 |
M/s. Sreevani Plastics |
20-NOV-2023 |
21-NOV-2023 |
13-FEB-2024 |
- |
168,048.00
|
- |
- |
168,048.00 |
16,805.00 |
29-FEB-2024 |
151,243.00 |
Final Allotment |
- |
General |
432 |
R3 |
19-NOV-2025 |
- |
- |
- |
- |
151 |
56 |
GUNTUR |
Palnadu |
MSME-RAYAVARAM |
101,106 |
65057 |
M/s. B K R Industries |
20-NOV-2023 |
21-NOV-2023 |
04-MAR-2024 |
- |
233,400.00
|
0.00 |
233,400.00 |
58,350.00 |
0.00 |
- |
58,350.00 |
Final Allotment |
- |
SC |
600 |
R3 |
19-NOV-2025 |
- |
- |
30-DEC-2023 |
Final allotment order has bee issued. |
151 |
57 |
GUNTUR |
Palnadu |
MSME-RAYAVARAM |
87,88,96,97 |
65069 |
M/s. Teja Polymers |
20-NOV-2023 |
21-NOV-2023 |
14-FEB-2024 |
- |
466,800.00
|
0.00 |
466,800.00 |
116,700.00 |
0.00 |
- |
116,700.00 |
Final Allotment |
- |
SC |
1200 |
R3 |
19-NOV-2025 |
- |
- |
30-DEC-2023 |
Final Allotment order has issued. |
151 |