S.No  |  DISTRICT  |  ZONE  |  INDUSTRIAL PARK  |  PLOT NO  |  ALLOTMENT NUMBER  |  NAME OF THE INDUSTRY  |  ALLOTMENT DATE  |  PROVISIONAL ALLOTMENT DATE  |  FINAL ALLOTMENT DATE  |  DATE OF PHYSICAL POSSESSION  |  ALLOTMENT VALUE  |  REBATE AMOUNT  |  NET ALLOTMENT VALUE  |  ADVANCE TO BE PAID  |  AMOUNT RECEIVED  |  LAST PAID DATE  |  BALANCE ADVANCE AMOUNT  |  STATUS OF ALLOTMENT  |  CANCELLATION  |  CATEGORY OF ALLOTMENT  |  EXTENT IN SQM  |  IMPLEMENTATION STATUS CODE NEW  |  IMPLEMENTATION DUE DATE  |  DCP DATE  |  EOT PERIOD  |  NOTICE ISSUED DATE  |  IMPL ZM REMARKS  |  ALLOTMENT AGE IN DAYS  |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
VIJAYAWADA |
Krishna |
AN MACHILIPATNAM |
PLOT NO_10 |
64633 |
TARAK INDUSTRIES |
23-JUN-2023 |
27-JUN-2023 |
15-SEP-2023 |
- |
365,772.00
|
182,886.00 |
182,886.00 |
45,722.00 |
0.00 |
- |
45,722.00 |
Final Allotment |
- |
SC |
132 |
NA |
22-JUN-2025 |
- |
- |
- |
25% Paid under sc category |
298 |
2 |
VIJAYAWADA |
Krishna |
AN MACHILIPATNAM |
PLOT NO_200 B |
64756 |
K S Enterprises |
23-JUN-2023 |
27-JUN-2023 |
03-NOV-2023 |
- |
748,170.00
|
374,085.00 |
374,085.00 |
374,085.00 |
0.00 |
- |
374,085.00 |
Final Allotment |
- |
SC |
270 |
NA |
22-JUN-2025 |
- |
- |
- |
LAND COST PAID |
298 |
3 |
VIJAYAWADA |
Krishna |
IP_VEERAPANENIGUDEM-PH-1 |
C18 |
65091 |
Riyan Shopping Bags |
20-NOV-2023 |
24-NOV-2023 |
27-FEB-2024 |
- |
2,752,572.00
|
1,376,287.00 |
1,376,285.00 |
344,071.00 |
0.00 |
- |
344,071.00 |
Final Allotment |
- |
SC,Women |
1236 |
NA |
19-NOV-2025 |
- |
- |
- |
Provisional Allotment |
148 |
4 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/177 |
54789 |
KEERTHI ENGINEERING WORKS |
22-JUL-2022 |
22-JUL-2022 |
17-OCT-2023 |
- |
204,000.00
|
102,000.00 |
102,000.00 |
102,000.00 |
102,000.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
NA |
SC |
500 |
NA |
31-MAR-2025 |
- |
- |
- |
FINAL ALLOTMENT |
638 |
5 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/267 |
54801 |
M/s TECHNO CIRCUITS |
09-JUL-2022 |
09-JUL-2022 |
04-OCT-2018 |
- |
205,632.00
|
102,816.00 |
102,816.00 |
102,816.00 |
102,816.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
NA |
SC |
504 |
NA |
31-MAR-2025 |
- |
- |
- |
Re allotmet on 09-jul-2022 |
651 |
6 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/3 |
54626 |
RAVI PACKAGING INDUSTRIES |
09-JUL-2022 |
09-JUL-2022 |
09-JAN-2019 |
- |
206,856.00
|
103,428.00 |
103,428.00 |
103,428.00 |
103,428.00 |
29-FEB-2024 |
0.00 |
Provisional Allotment |
NA |
SC |
507 |
R2 |
31-MAR-2025 |
- |
- |
- |
REALLOTTED UNDER YSR JBVM |
651 |
7 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/91,PLOT NO._10/92 |
54753 |
Nishanam Feeds |
28-DEC-2022 |
28-DEC-2022 |
13-MAR-2019 |
- |
408,816.00
|
204,408.00 |
204,408.00 |
204,408.00 |
204,408.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
NA |
SC |
1002 |
NA |
31-MAR-2025 |
- |
- |
- |
Reallot under YSR JBV |
479 |
8 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/60,PLOT NO._10/61,PLOT NO._10/62 |
54630 |
M/s MBK PROJECTS |
23-AUG-2022 |
23-AUG-2022 |
04-DEC-2018 |
- |
615,672.00
|
307,836.00 |
307,836.00 |
307,836.00 |
307,836.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
- |
SC |
1509 |
NA |
31-MAR-2025 |
- |
- |
- |
"JBVM.The alllottee paid the land in full and requested for EOT for a period of 3 years for implementation with out levying penalty.
Recommended for EOT for 3 years from 1st April, 2022 without in terms of G.O.Ms.No.7, clause 7 (Vi)."
|
606 |
9 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._9/26 |
54687 |
SNJ Synthetics Ltd |
08-JAN-2018 |
08-JAN-2018 |
28-MAY-2019 |
- |
918,000.00
|
0.00 |
918,000.00 |
918,000.00 |
918,000.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
Notice Issued |
General |
2250 |
NA |
18-JAN-2020 |
- |
- |
07-JUL-2022 |
Notice issued to pay the differential land cost, But not responded.
|
2294 |
10 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/28 |
54622 |
Dr. Narayana Reddy Agriculture LLP |
08-JAN-2018 |
08-JAN-2018 |
04-SEP-2018 |
- |
1,632,000.00
|
0.00 |
1,632,000.00 |
1,632,000.00 |
1,632,000.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
NA |
General |
4000 |
NA |
19-JAN-2020 |
- |
- |
- |
Pay the differential land cost |
2294 |
11 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._9/55 |
55357 |
Bhavana Polymers |
02-MAR-2018 |
02-MAR-2018 |
17-AUG-2019 |
- |
204,408.00
|
102,204.00 |
102,204.00 |
102,204.00 |
204,408.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
Notice Issued |
BC |
501 |
NA |
30-AUG-2020 |
- |
- |
08-JUL-2022 |
Notice issued to pay the differential land cost, But not responded.
|
2241 |
12 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._9/45 |
55373 |
M/s DJS HI-TECH Engineering & Industrial Gases |
02-MAR-2018 |
02-MAR-2018 |
03-JUL-2018 |
- |
204,408.00
|
0.00 |
204,408.00 |
204,408.00 |
204,408.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
Notice Issued |
General |
501 |
NA |
30-AUG-2020 |
- |
- |
08-JUL-2022 |
Notice issued to pay the differential land cost, But not responded.
|
2241 |
13 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/45 |
55295 |
VANITHA INDUSTRIES |
09-JUL-2022 |
09-JUL-2022 |
28-MAY-2019 |
- |
205,224.00
|
102,612.00 |
102,612.00 |
102,612.00 |
102,612.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
NA |
SC |
503 |
NA |
31-MAR-2025 |
- |
- |
- |
Reallotted under YSR JBV Under Go No 7 |
651 |
14 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/56 |
55302 |
M/s Ruchi Oil Industries |
31-JUL-2022 |
31-JUL-2022 |
23-JUN-2019 |
- |
205,224.00
|
102,612.00 |
102,612.00 |
102,612.00 |
102,612.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
- |
SC |
503 |
NA |
31-MAR-2025 |
- |
- |
- |
JVBM.The land cost paid by the allottee. The allotted plot covered in Land Acquisition Court dispute. Requested for alternate plot with same estate.
Hence, recommended for allotment of alternate Plot No.10/56 measuring 503.00 Sq.Mtrs. Sale aggrement to be executed. |
629 |
15 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/67 |
55850 |
M/s SRINESH INDUSTRIES |
18-JAN-2023 |
18-JAN-2023 |
28-MAR-2019 |
- |
205,224.00
|
140,556.00 |
64,668.00 |
64,668.00 |
140,556.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
NA |
SC_W |
503 |
NA |
31-MAR-2025 |
- |
- |
- |
REALLOTMENT UNDER YSR JVB |
458 |
16 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/108 |
55916 |
M/S HEMA POLYMERS |
09-JUL-2022 |
09-JUL-2022 |
04-DEC-2018 |
- |
205,224.00
|
102,612.00 |
102,612.00 |
102,612.00 |
102,612.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
NA |
ST |
503 |
NA |
31-MAR-2025 |
- |
- |
- |
Reallotment of GO No 07 JBV |
651 |
17 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/217 |
55160 |
Harsha Engineering Works |
23-AUG-2022 |
23-AUG-2022 |
08-NOV-2022 |
- |
205,632.00
|
102,816.00 |
102,816.00 |
102,816.00 |
102,816.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
- |
SC |
504 |
NA |
31-MAR-2025 |
- |
- |
- |
JBVM The allottee paid the land cost in full. Pending for execution of Sale Agreement due to non confirmation of the land cost. Hence, recommended for execution of sale agreement for the same plot duly giving time of 3 years for implementation of the project. |
606 |
18 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._11/27/A,PLOT NO._11/28 |
55796 |
Vijaya Engineering Works |
02-MAR-2018 |
02-MAR-2018 |
22-OCT-2020 |
- |
306,816.00
|
0.00 |
306,816.00 |
306,816.00 |
306,816.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
Notice Issued |
General |
752 |
NA |
30-AUG-2020 |
- |
- |
05-JUL-2022 |
Notice issued to pay the differential land cost, But not responded.
|
2241 |
19 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/122 |
55213 |
SSS CNC TECHNICS |
02-MAR-2018 |
02-MAR-2018 |
07-MAR-2020 |
- |
310,080.00
|
0.00 |
310,080.00 |
310,080.00 |
310,080.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
Notice Issued |
General |
760 |
NA |
08-MAR-2020 |
- |
- |
02-JUL-2022 |
Dispute.Final Allotment to be executed |
2241 |
20 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/127 |
55843 |
VENKAT ENTERPRISES |
02-MAR-2018 |
02-MAR-2018 |
23-JUN-2019 |
- |
310,080.00
|
0.00 |
310,080.00 |
310,080.00 |
310,081.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
- |
General |
760 |
NA |
30-AUG-2020 |
- |
- |
- |
Final Allotment |
2241 |
21 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/20/B |
55287 |
Akhila Polymers |
02-MAR-2018 |
02-MAR-2018 |
18-NOV-2019 |
- |
408,000.00
|
0.00 |
408,000.00 |
408,000.00 |
408,000.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
Notice Issued |
General |
1000 |
NA |
30-AUG-2020 |
- |
- |
07-JUL-2022 |
Sale agreement to be issued |
2241 |
22 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/240/A,PLOT NO._18/247/A |
55277 |
NAGASAI INDUSTRIES |
02-MAR-2018 |
02-MAR-2018 |
18-JAN-2021 |
- |
408,816.00
|
0.00 |
408,816.00 |
408,816.00 |
408,816.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
Notice Issued |
General |
1002 |
NA |
08-MAR-2020 |
- |
- |
05-JUL-2022 |
Notice issued to pay the differential land cost, But not responded.
|
2241 |
23 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/241/A,PLOT NO._18/246/A |
55706 |
AADI ENGINEERING & TECHNOLOGIES |
02-MAR-2018 |
02-MAR-2018 |
30-AUG-2019 |
- |
408,816.00
|
204,408.00 |
204,408.00 |
204,408.00 |
204,409.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
- |
BC |
1002 |
NA |
08-MAR-2020 |
- |
- |
- |
Notice issued to pay the differential land cost, But not responded. |
2241 |
24 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/79,PLOT NO._10/80 |
55268 |
SRI MADHURI ENGINEERING WORKS |
02-MAR-2018 |
02-MAR-2018 |
14-DEC-2020 |
- |
410,448.00
|
205,224.00 |
205,224.00 |
205,224.00 |
205,224.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
- |
SC_W |
1006 |
NA |
08-MAR-2020 |
- |
- |
- |
Final Allotment |
2241 |
25 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/10 |
55286 |
Sri Raghava Metals |
02-MAR-2018 |
02-MAR-2018 |
16-JUL-2019 |
- |
510,000.00
|
0.00 |
510,000.00 |
510,000.00 |
510,000.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
Notice Issued |
General |
1250 |
NA |
30-AUG-2020 |
- |
- |
07-JUL-2022 |
Notice issued to pay the differential land cost, approached to court. |
2241 |
26 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._17/30 |
55563 |
S R ENGINEERING WORKS |
02-MAR-2018 |
02-MAR-2018 |
03-AUG-2019 |
- |
510,000.00
|
0.00 |
510,000.00 |
510,000.00 |
510,000.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
Notice Issued |
General |
1250 |
NA |
30-AUG-2020 |
- |
- |
07-JUL-2022 |
Notice issued to pay the differential land cost, But not responde |
2241 |
27 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._19/4 |
55893 |
SHIVANI INDUSTRIES |
02-MAR-2018 |
02-MAR-2018 |
23-JUN-2019 |
- |
581,808.00
|
0.00 |
581,808.00 |
581,808.00 |
581,808.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
Notice Issued |
General |
1426 |
NA |
08-MAR-2020 |
- |
- |
07-JUL-2022 |
Notice issued to pay the differential land cost, But not responde |
2241 |
28 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._11/73 |
55791 |
S.V.INDUSTRIES |
02-MAR-2018 |
02-MAR-2018 |
14-NOV-2019 |
- |
612,000.00
|
0.00 |
612,000.00 |
612,000.00 |
612,000.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
Notice Issued |
General |
1500 |
NA |
30-AUG-2020 |
- |
- |
07-JUL-2022 |
Notice issued to pay the differential land cost, But not responded.
|
2241 |
29 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/131 |
57451 |
Sri Bhavani Metals Pvt Ltd |
02-MAR-2018 |
02-MAR-2018 |
30-AUG-2019 |
- |
715,632.00
|
0.00 |
715,632.00 |
715,632.00 |
71,400.00 |
29-FEB-2024 |
644,232.00 |
Final Allotment |
Notice Issued |
General |
1754 |
NA |
30-AUG-2020 |
- |
- |
07-JUL-2022 |
Notice issued to pay the differential land cost, But not responded.
|
2241 |
30 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/33/A |
55787 |
ASCENTECH ENGINEERING |
02-MAR-2018 |
02-MAR-2018 |
25-NOV-2020 |
- |
816,000.00
|
0.00 |
816,000.00 |
816,000.00 |
816,000.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
Notice Issued |
General |
2000 |
NA |
30-AUG-2020 |
- |
- |
07-JUL-2022 |
Notice issued to pay the differential land cost, But not responded.
|
2241 |
31 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/10,PLOT NO._18/11 |
55270 |
Sri Vinayak electricals |
02-MAR-2018 |
02-MAR-2018 |
09-SEP-2019 |
- |
1,224,000.00
|
0.00 |
1,224,000.00 |
1,224,000.00 |
1,247,664.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
Notice Issued |
General |
3000 |
NA |
08-MAR-2020 |
- |
- |
07-JUL-2022 |
Notice issued to pay the differential land cost, But not responded.
|
2241 |
32 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/43 |
55301 |
Creative Pre Fab |
02-MAR-2018 |
02-MAR-2018 |
07-MAR-2020 |
- |
1,653,216.00
|
0.00 |
1,653,216.00 |
1,653,216.00 |
1,653,216.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
Notice Issued |
General |
4052 |
NA |
08-MAR-2020 |
- |
- |
07-JUL-2022 |
Notice issued to pay the differential land cost, But not responded.
|
2241 |
33 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._18/228,PLOT NO._18/229 |
55203 |
metal tech industries |
02-MAR-2018 |
02-MAR-2018 |
28-JAN-2020 |
- |
4,088,816.00
|
2,000,000.00 |
2,088,816.00 |
2,088,816.00 |
204,408.00 |
29-FEB-2024 |
1,884,408.00 |
Final Allotment |
Notice Issued |
SC |
1002 |
NA |
08-MAR-2020 |
- |
- |
08-JUL-2022 |
Notice issued to pay the differential land cost, But not responde |
2241 |
34 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._10/89 |
56624 |
TULASIRAM DISPOSABLE PLASTIC CUP AND PLATES |
23-AUG-2022 |
23-AUG-2022 |
12-MAR-2020 |
- |
204,408.00
|
102,204.00 |
102,204.00 |
102,204.00 |
102,408.00 |
29-FEB-2024 |
0.00 |
Final Allotment |
- |
ST |
501 |
NA |
31-MAR-2025 |
- |
- |
- |
JBV Reallotment on 23-08-2022.Final Allotment.Sale Agreement to be Executed |
606 |
35 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._22/9 |
57003 |
M/s. Sanjay Industries |
09-AUG-2022 |
09-AUG-2022 |
18-NOV-2022 |
- |
205,224.00
|
102,000.00 |
103,224.00 |
103,224.00 |
0.00 |
- |
103,224.00 |
Final Allotment |
NA |
SC |
503 |
NA |
31-MAR-2025 |
- |
- |
- |
REALLOTMENT UNDE NO GO NO 7 |
620 |
36 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/88,Plot No-31/89 |
64735 |
M/s. DSR Life Sciences |
23-JUN-2023 |
27-JUN-2023 |
21-OCT-2023 |
- |
4,438,856.00
|
0.00 |
4,438,856.00 |
2,219,428.00 |
443,886.00 |
29-FEB-2024 |
1,775,542.00 |
Final Allotment |
- |
General |
2014 |
NA |
22-JUN-2025 |
- |
- |
- |
Provisional Allotment |
298 |
37 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/58,Plot No-31/59 |
65048 |
M/s. J M R Plastics |
20-NOV-2023 |
23-NOV-2023 |
24-FEB-2024 |
- |
2,208,408.00
|
0.00 |
2,208,408.00 |
552,102.00 |
0.00 |
- |
552,102.00 |
Final Allotment |
- |
SC |
1002 |
R3 |
19-NOV-2025 |
- |
- |
- |
Provisional Allotment |
149 |
38 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/65,Plot No-31/68 |
65059 |
M/s. Rajgruha Industries |
20-NOV-2023 |
23-NOV-2023 |
27-FEB-2024 |
- |
3,272,940.00
|
0.00 |
3,272,940.00 |
818,235.00 |
0.00 |
- |
818,235.00 |
Final Allotment |
- |
SC |
1485 |
R3 |
19-NOV-2025 |
- |
- |
- |
Provisional Allotment |
149 |
39 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/69,Plot No-31/70 |
65169 |
M/s. Excel Garments |
20-NOV-2023 |
23-NOV-2023 |
12-FEB-2024 |
- |
3,416,200.00
|
0.00 |
3,416,200.00 |
854,050.00 |
0.00 |
- |
854,050.00 |
Final Allotment |
- |
SC |
1550 |
R3 |
19-NOV-2025 |
- |
- |
- |
Provisional Allotment |
149 |
40 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No_31/5 |
65300 |
M/s. B & B Foods Enterprises |
22-DEC-2023 |
23-DEC-2023 |
15-MAR-2024 |
- |
4,100,498.00
|
0.00 |
4,100,498.00 |
1,025,125.00 |
0.00 |
- |
1,025,125.00 |
Final Allotment |
- |
SC |
1824 |
NA |
26-DEC-2025 |
- |
- |
- |
Final Allotment |
119 |
41 |
VIJAYAWADA |
Krishna |
JP_MACHILIPATNAM |
LAND (33 KV) |
40912 |
THE DIVISIONAL ELECTRICAL ENGINEER(OPERATION) |
21-APR-2009 |
21-APR-2009 |
21-APR-2009 |
- |
99,999.60
|
- |
- |
99,999.60 |
0.00 |
- |
99,999.60 |
Final Allotment |
- |
Others |
2004 |
G1 |
21-APR-2011 |
- |
- |
- |
- |
5478 |
42 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
MSME-7 |
61491 |
SHIVA ENGINERING WORKS |
18-JAN-2023 |
18-JAN-2023 |
06-FEB-2024 |
- |
1,005,000.00
|
502,500.00 |
502,500.00 |
502,500.00 |
0.00 |
- |
502,500.00 |
Final Allotment |
Cancelled |
SC |
300 |
NA |
31-MAR-2025 |
- |
- |
- |
REALLOTMENT UNDER YSR JVB |
458 |
43 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
MSME-4 |
61497 |
JONNADULA CHAITANYA |
17-FEB-2020 |
17-FEB-2020 |
16-SEP-2021 |
- |
984,000.00
|
492,000.00 |
492,000.00 |
492,000.00 |
43,230.00 |
29-FEB-2024 |
448,770.00 |
Final Allotment |
- |
BC |
300 |
NA |
16-FEB-2021 |
- |
- |
- |
Final Allotment |
1524 |
44 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
75 |
63320 |
VASANTARAO AUTO CONSULTANCY |
19-JAN-2022 |
31-JAN-2022 |
24-AUG-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
General |
51 |
NA |
18-JAN-2026 |
- |
- |
- |
Final Allotment |
810 |
45 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
89 |
63322 |
VIGNESWARA LORRY SUPLLY OFFICE |
19-JAN-2022 |
29-JAN-2022 |
23-SEP-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
General |
51 |
NA |
18-JAN-2026 |
- |
- |
- |
FINAL ALLOTMENT ORDERS.SALE DEED AT TO BE EXECUTED |
812 |
46 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
131 |
63387 |
GIRISHWAR MECHANICAL WORKS |
07-FEB-2022 |
14-FEB-2022 |
19-OCT-2023 |
- |
188,445.00
|
94,223.00 |
94,222.00 |
94,222.00 |
0.00 |
- |
94,222.00 |
Final Allotment |
- |
SC |
51 |
NA |
06-FEB-2026 |
- |
- |
- |
Land Cost Paid |
796 |
47 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
124 |
63491 |
KOTESWARAMMA MECHANICAL WORKS |
15-MAR-2022 |
29-MAR-2022 |
11-AUG-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
General |
51 |
NA |
14-MAR-2026 |
- |
- |
- |
Final Allotment |
753 |
48 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
151 |
64124 |
JABEER MECHANICAL WORKS |
27-DEC-2022 |
04-JAN-2023 |
11-AUG-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
BC |
51 |
NA |
26-DEC-2024 |
- |
- |
- |
Final Allotment |
472 |
49 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
84 |
64206 |
SHABUL MOTORS |
27-DEC-2022 |
04-JAN-2023 |
11-AUG-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
BC |
51 |
NA |
26-DEC-2024 |
- |
- |
- |
Final Allotment |
472 |
50 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
79 |
64208 |
LAKSHMI AUTOSTORES |
27-DEC-2022 |
04-JAN-2023 |
11-AUG-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
General |
51 |
NA |
26-DEC-2024 |
- |
- |
- |
Provisional Allotment |
472 |
51 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
23 |
64209 |
SRI RAGHAVAIAH AUTOMOBILES |
27-DEC-2022 |
04-JAN-2023 |
11-AUG-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
General |
51 |
NA |
26-DEC-2024 |
- |
- |
- |
Prvisional Allotment |
472 |
52 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
186 |
64315 |
FATHIMA KOLLIMI WORKS |
01-MAR-2023 |
02-MAR-2023 |
12-SEP-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
BC |
51 |
NA |
02-MAR-2025 |
- |
- |
- |
Land cost paid |
415 |
53 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
194 |
64318 |
KHADAR BEG FOUNDARY WORKS |
01-MAR-2023 |
02-MAR-2023 |
11-AUG-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
BC |
51 |
NA |
02-MAR-2025 |
- |
- |
- |
Final Allotment |
415 |
54 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
197 |
64323 |
BISMILLAH WELDING WORKS |
01-MAR-2023 |
02-MAR-2023 |
11-AUG-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
BC |
51 |
NA |
02-MAR-2025 |
- |
- |
- |
Provisional Allotment |
415 |
55 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
153 |
64324 |
ARSHAD SEAT AND BAG WORKS |
01-MAR-2023 |
02-MAR-2023 |
11-AUG-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
BC |
51 |
NA |
02-MAR-2025 |
- |
- |
- |
Final Allotment |
415 |
56 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
100 |
64327 |
BHAVANI SREEJA AUTO ELECTRICAL WORKS |
01-MAR-2023 |
02-MAR-2023 |
11-AUG-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
General |
51 |
NA |
02-MAR-2025 |
- |
- |
- |
Provisional Allotment |
415 |
57 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
15 |
64331 |
RAVI OILS |
01-MAR-2023 |
02-MAR-2023 |
11-AUG-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
General |
51 |
NA |
02-MAR-2025 |
- |
- |
- |
Provisional Allotment |
415 |
58 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
10 |
64332 |
BALAJI TYRES |
01-MAR-2023 |
02-MAR-2023 |
11-AUG-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
General |
51 |
NA |
02-MAR-2025 |
- |
- |
- |
Final Allotment |
415 |
59 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
116 |
64337 |
SANKAR BATTERY WORKS |
01-MAR-2023 |
02-MAR-2023 |
11-AUG-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
General |
51 |
NA |
02-MAR-2025 |
- |
- |
- |
Final Allotment |
415 |
60 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
154 |
64391 |
SRI VENKATESWARA MECHANICAL WORKS |
01-MAR-2023 |
02-MAR-2023 |
04-SEP-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
General |
51 |
NA |
02-MAR-2025 |
- |
- |
- |
Land cost paid with in time |
415 |
61 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
6 |
64392 |
LEELA KRISHNA LUBRICANTS |
01-MAR-2023 |
02-MAR-2023 |
11-AUG-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
General |
51 |
NA |
02-MAR-2025 |
- |
- |
- |
Final Allotment |
415 |
62 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
152 |
64395 |
RAMESH ENGINEERING WORKS |
01-MAR-2023 |
02-MAR-2023 |
11-AUG-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
BC |
51 |
NA |
02-MAR-2025 |
- |
- |
- |
Final Allotment |
415 |
63 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
8 |
64396 |
LEELA KRISHNA AUTOMOBILES |
01-MAR-2023 |
02-MAR-2023 |
12-SEP-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
BC |
51 |
NA |
02-MAR-2025 |
- |
- |
- |
Land cost Paid |
415 |
64 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
188 |
64403 |
MUSTAFA FOUNDARY WORKS |
01-MAR-2023 |
02-MAR-2023 |
11-AUG-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
BC |
51 |
NA |
02-MAR-2025 |
- |
- |
- |
Final Allotment |
415 |
65 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
139 |
64444 |
KARTHEEK WELDING WORKS |
01-MAR-2023 |
02-MAR-2023 |
04-SEP-2023 |
- |
188,445.00
|
94,223.00 |
94,222.00 |
94,222.00 |
0.00 |
- |
94,222.00 |
Land Cost Paid |
- |
SC |
51 |
NA |
02-MAR-2025 |
- |
- |
- |
Land cost paid with in time |
415 |
66 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
82 |
64635 |
KHUDDUS PAINTING WORKS |
23-JUN-2023 |
28-JUN-2023 |
15-SEP-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
BC |
51 |
NA |
22-JUN-2025 |
- |
- |
- |
Final Allotment |
297 |
67 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
119 |
64636 |
SAI MOTOR CYCLE WORKS |
23-JUN-2023 |
28-JUN-2023 |
17-OCT-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
BC |
51 |
NA |
22-JUN-2025 |
- |
- |
- |
Final Allotment |
297 |
68 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
103 |
64643 |
MALLI MECHANICAL WORKS |
23-JUN-2023 |
27-JUN-2023 |
04-SEP-2023 |
- |
188,445.00
|
94,223.00 |
94,222.00 |
94,222.00 |
0.00 |
- |
94,222.00 |
Final Allotment |
- |
SC |
51 |
NA |
22-JUN-2025 |
- |
- |
- |
Land cost paid with in time |
298 |
69 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
111 |
64644 |
SRI LAKSHMI ARUNA ENGINE REBOARING WORKS |
23-JUN-2023 |
27-JUN-2023 |
04-SEP-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
General |
51 |
NA |
22-JUN-2025 |
- |
- |
- |
Land cost paid with in time |
298 |
70 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
95 |
64662 |
SURESH MECHANICAL WORKS |
23-JUN-2023 |
28-JUN-2023 |
17-OCT-2023 |
- |
188,445.00
|
94,223.00 |
94,222.00 |
94,222.00 |
0.00 |
- |
94,222.00 |
Final Allotment |
- |
SC |
51 |
NA |
22-JUN-2025 |
- |
- |
- |
Provisional Allotment |
297 |
71 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
81 |
64663 |
MEHER PAINTS AND IRON |
23-JUN-2023 |
28-JUN-2023 |
12-SEP-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
General |
51 |
NA |
22-JUN-2025 |
- |
- |
- |
Provisional Allotment |
297 |
72 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
189 |
64669 |
RIDA AUTOMOBILES |
23-JUN-2023 |
27-JUN-2023 |
23-SEP-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
BC |
51 |
NA |
22-JUN-2025 |
- |
- |
- |
Land cost paid with in time |
298 |
73 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
233 |
64680 |
SYAM MECHANICAL WORKS |
23-JUN-2023 |
27-JUN-2023 |
12-SEP-2023 |
- |
243,870.00
|
121,935.00 |
121,935.00 |
121,935.00 |
0.00 |
- |
121,935.00 |
Final Allotment |
- |
SC |
66 |
NA |
22-JUN-2025 |
- |
- |
- |
Land cost paid with in time |
298 |
74 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
205 |
64697 |
KALYANA VENKATESWARA MECHANICAL WORKS |
23-JUN-2023 |
28-JUN-2023 |
04-SEP-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
General |
51 |
NA |
22-JUN-2025 |
- |
- |
- |
Land cost paid with in time |
297 |
75 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
35 |
64706 |
NATIONAL ELECTRONICS |
23-JUN-2023 |
28-JUN-2023 |
04-SEP-2023 |
- |
188,445.00
|
0.00 |
188,445.00 |
188,445.00 |
18,845.00 |
29-FEB-2024 |
169,600.00 |
Final Allotment |
- |
BC |
51 |
NA |
22-JUN-2025 |
- |
- |
- |
Land cost paid with in time |
297 |
76 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
223 |
64717 |
BISMILLAH MECHANICAL WORKS |
23-JUN-2023 |
27-JUN-2023 |
15-SEP-2023 |
- |
243,870.00
|
0.00 |
243,870.00 |
243,870.00 |
24,387.00 |
29-FEB-2024 |
219,483.00 |
Final Allotment |
- |
BC |
66 |
NA |
22-JUN-2025 |
- |
- |
- |
Land cost paid with in time |
298 |
77 |
VIJAYAWADA |
Krishna |
State Food Park, Mallavalli |
Plot No.11/C |
57089 |
Vighna Enterprises |
02-JUL-2018 |
02-JUL-2018 |
11-MAY-2019 |
- |
1,027,000.00
|
513,500.00 |
513,500.00 |
513,500.00 |
570,000.00 |
29-FEB-2024 |
0.00 |
Provisional Allotment |
Notice Issued |
SC_W |
1000 |
NA |
02-JUL-2020 |
- |
- |
29-MAY-2022 |
NOTICE ISSUED |
2119 |
78 |
VIJAYAWADA |
NTR |
IP-Peddavaram |
298,299,300 |
59724 |
SHAURYA MILLETS |
09-AUG-2019 |
09-AUG-2019 |
04-OCT-2021 |
- |
831,285.00
|
0.00 |
831,285.00 |
831,285.00 |
0.00 |
- |
831,285.00 |
Final Allotment |
Notice Issued |
SC,Women |
1015 |
NA |
08-AUG-2020 |
- |
- |
20-JUN-2022 |
22A Final Allotment |
1716 |
79 |
VIJAYAWADA |
NTR |
IP-Peddavaram |
53,54 |
59769 |
UMA ENGINEERING WORKS |
09-AUG-2019 |
09-AUG-2019 |
04-OCT-2021 |
- |
491,400.00
|
245,700.00 |
245,700.00 |
245,700.00 |
49,140.00 |
29-FEB-2024 |
196,560.00 |
Final Allotment |
Notice Issued |
BC |
600 |
NA |
08-AUG-2020 |
- |
- |
20-JUN-2022 |
22A Final Allotment |
1716 |
80 |
VIJAYAWADA |
NTR |
IP-Peddavaram |
222 |
59773 |
VENKATESH GENERAL ENGINEERING WORKS |
09-AUG-2019 |
09-AUG-2019 |
12-OCT-2021 |
- |
245,700.00
|
122,850.00 |
122,850.00 |
122,850.00 |
24,570.00 |
29-FEB-2024 |
98,280.00 |
Final Allotment |
- |
BC |
300 |
NA |
08-AUG-2020 |
- |
- |
- |
22A FINAL ALLOTMENT |
1716 |
81 |
VIJAYAWADA |
NTR |
IP-Peddavaram |
118 |
59782 |
SRAVYA SSRI TECHNOLOGIES |
09-AUG-2019 |
09-AUG-2019 |
04-OCT-2021 |
- |
245,700.00
|
122,850.00 |
122,850.00 |
122,850.00 |
24,570.00 |
29-FEB-2024 |
98,280.00 |
Final Allotment |
Notice Issued |
BC |
300 |
NA |
08-AUG-2020 |
- |
- |
20-JUN-2022 |
22A sale agreement to be executed |
1716 |
82 |
VIJAYAWADA |
NTR |
IP-Peddavaram |
135 |
59785 |
NEW RAHA MATTRESSES PRODUCTS |
09-AUG-2019 |
09-AUG-2019 |
15-NOV-2021 |
- |
285,831.00
|
142,916.00 |
142,915.00 |
142,915.00 |
28,583.00 |
29-FEB-2024 |
114,332.00 |
Final Allotment |
Notice Issued |
BC |
349 |
NA |
08-AUG-2020 |
- |
- |
20-JUN-2022 |
22A Sale agreement to be executed |
1716 |
83 |
VIJAYAWADA |
NTR |
IP-Peddavaram |
62,63 |
59798 |
Neeraja Enterprises |
09-AUG-2019 |
09-AUG-2019 |
04-OCT-2021 |
- |
491,400.00
|
0.00 |
491,400.00 |
491,400.00 |
49,140.00 |
29-FEB-2024 |
442,260.00 |
Final Allotment |
Notice Issued |
General |
600 |
NA |
08-AUG-2020 |
- |
- |
01-JUL-2022 |
22A Sale agreement to be executed |
1716 |
84 |
VIJAYAWADA |
NTR |
IP-Peddavaram |
265 |
59799 |
SHAHENSHA PAPAD |
09-AUG-2019 |
09-AUG-2019 |
05-NOV-2021 |
- |
274,365.00
|
137,183.00 |
137,182.00 |
137,182.00 |
27,437.00 |
29-FEB-2024 |
109,745.00 |
Final Allotment |
Notice Issued |
BC |
335 |
NA |
08-AUG-2020 |
- |
- |
20-JUN-2022 |
22A Sale agreement to be executed
|
1716 |
85 |
VIJAYAWADA |
NTR |
IP-Peddavaram |
108,109,110 |
59805 |
KBS Engineering & Fabricators |
09-AUG-2019 |
09-AUG-2019 |
01-JAN-2022 |
- |
737,100.00
|
368,550.00 |
368,550.00 |
368,550.00 |
73,710.00 |
29-FEB-2024 |
294,840.00 |
Final Allotment |
Notice Issued |
BC |
900 |
NA |
08-AUG-2020 |
- |
- |
20-JUL-2022 |
22A Sale agreement to be executed
|
1716 |
86 |
VIJAYAWADA |
NTR |
IP-Peddavaram |
275 |
59821 |
K R Engineering Works |
09-AUG-2019 |
09-AUG-2019 |
04-OCT-2021 |
- |
245,700.00
|
122,850.00 |
122,850.00 |
122,850.00 |
24,570.00 |
29-FEB-2024 |
98,280.00 |
Final Allotment |
Notice Issued |
BC |
300 |
NA |
08-AUG-2020 |
- |
- |
20-JUL-2022 |
22A Sale agreement to be executed |
1716 |
87 |
VIJAYAWADA |
NTR |
IP-Peddavaram |
161,162,163 |
61570 |
SRI VISHNU PAVAN ENGINEERING |
24-FEB-2020 |
24-FEB-2020 |
18-JAN-2022 |
- |
737,100.00
|
0.00 |
737,100.00 |
737,100.00 |
73,710.00 |
29-FEB-2024 |
663,390.00 |
Final Allotment |
Notice Issued |
General |
900 |
NA |
23-FEB-2021 |
- |
- |
20-JUL-2022 |
Final Allotment |
1517 |
88 |
VIJAYAWADA |
NTR |
IP_JAGGAIAHPET |
PLOT NO_164 |
62563 |
KAIZEN ENTERPRISES |
05-MAR-2021 |
05-MAR-2021 |
27-FEB-2024 |
- |
3,689,000.00
|
1,844,500.00 |
1,844,500.00 |
1,844,500.00 |
0.00 |
- |
1,844,500.00 |
Final Allotment |
- |
SC |
1054 |
NA |
04-MAR-2025 |
- |
- |
- |
Land cost paid.(10% excess area ho conseder on 30-05-2023 |
1142 |