S.No   DISTRICT   ZONE   INDUSTRIAL PARK   PLOT NO   ALLOTMENT NUMBER   NAME OF THE INDUSTRY   ALLOTMENT DATE   PROVISIONAL ALLOTMENT DATE   FINAL ALLOTMENT DATE   DATE OF PHYSICAL POSSESSION   ALLOTMENT VALUE   REBATE AMOUNT   NET ALLOTMENT VALUE   ADVANCE TO BE PAID   AMOUNT RECEIVED   LAST PAID DATE   BALANCE ADVANCE AMOUNT   STATUS OF ALLOTMENT   CANCELLATION   CATEGORY OF ALLOTMENT   EXTENT IN SQM   IMPLEMENTATION STATUS CODE NEW   IMPLEMENTATION DUE DATE   DCP DATE   EOT PERIOD   NOTICE ISSUED DATE   IMPL ZM REMARKS   ALLOTMENT AGE IN DAYS 
1
VIJAYAWADA
Krishna
AN MACHILIPATNAM
PLOT NO_10
64633
TARAK INDUSTRIES
23-JUN-2023
27-JUN-2023
15-SEP-2023
-
365,772.00
182,886.00
182,886.00
45,722.00
0.00
-
45,722.00
Final Allotment
-
SC
132
NA
22-JUN-2025
-
-
-
25% Paid under sc category
298
2
VIJAYAWADA
Krishna
AN MACHILIPATNAM
PLOT NO_200 B
64756
K S Enterprises
23-JUN-2023
27-JUN-2023
03-NOV-2023
-
748,170.00
374,085.00
374,085.00
374,085.00
0.00
-
374,085.00
Final Allotment
-
SC
270
NA
22-JUN-2025
-
-
-
LAND COST PAID
298
3
VIJAYAWADA
Krishna
IP_VEERAPANENIGUDEM-PH-1
C18
65091
Riyan Shopping Bags
20-NOV-2023
24-NOV-2023
27-FEB-2024
-
2,752,572.00
1,376,287.00
1,376,285.00
344,071.00
0.00
-
344,071.00
Final Allotment
-
SC,Women
1236
NA
19-NOV-2025
-
-
-
Provisional Allotment
148
4
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/177
54789
KEERTHI ENGINEERING WORKS
22-JUL-2022
22-JUL-2022
17-OCT-2023
-
204,000.00
102,000.00
102,000.00
102,000.00
102,000.00
29-FEB-2024
0.00
Final Allotment
NA
SC
500
NA
31-MAR-2025
-
-
-
FINAL ALLOTMENT
638
5
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/267
54801
M/s TECHNO CIRCUITS
09-JUL-2022
09-JUL-2022
04-OCT-2018
-
205,632.00
102,816.00
102,816.00
102,816.00
102,816.00
29-FEB-2024
0.00
Final Allotment
NA
SC
504
NA
31-MAR-2025
-
-
-
Re allotmet on 09-jul-2022
651
6
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/3
54626
RAVI PACKAGING INDUSTRIES
09-JUL-2022
09-JUL-2022
09-JAN-2019
-
206,856.00
103,428.00
103,428.00
103,428.00
103,428.00
29-FEB-2024
0.00
Provisional Allotment
NA
SC
507
R2
31-MAR-2025
-
-
-
REALLOTTED UNDER YSR JBVM
651
7
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/91,PLOT NO._10/92
54753
Nishanam Feeds
28-DEC-2022
28-DEC-2022
13-MAR-2019
-
408,816.00
204,408.00
204,408.00
204,408.00
204,408.00
29-FEB-2024
0.00
Final Allotment
NA
SC
1002
NA
31-MAR-2025
-
-
-
Reallot under YSR JBV
479
8
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/60,PLOT NO._10/61,PLOT NO._10/62
54630
M/s MBK PROJECTS
23-AUG-2022
23-AUG-2022
04-DEC-2018
-
615,672.00
307,836.00
307,836.00
307,836.00
307,836.00
29-FEB-2024
0.00
Final Allotment
-
SC
1509
NA
31-MAR-2025
-
-
-
"JBVM.The alllottee paid the land in full and requested for EOT for a period of 3 years for implementation with out levying penalty. Recommended for EOT for 3 years from 1st April, 2022 without in terms of G.O.Ms.No.7, clause 7 (Vi)."
606
9
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._9/26
54687
SNJ Synthetics Ltd
08-JAN-2018
08-JAN-2018
28-MAY-2019
-
918,000.00
0.00
918,000.00
918,000.00
918,000.00
29-FEB-2024
0.00
Final Allotment
Notice Issued
General
2250
NA
18-JAN-2020
-
-
07-JUL-2022
Notice issued to pay the differential land cost, But not responded.
2294
10
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/28
54622
Dr. Narayana Reddy Agriculture LLP
08-JAN-2018
08-JAN-2018
04-SEP-2018
-
1,632,000.00
0.00
1,632,000.00
1,632,000.00
1,632,000.00
29-FEB-2024
0.00
Final Allotment
NA
General
4000
NA
19-JAN-2020
-
-
-
Pay the differential land cost
2294
11
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._9/55
55357
Bhavana Polymers
02-MAR-2018
02-MAR-2018
17-AUG-2019
-
204,408.00
102,204.00
102,204.00
102,204.00
204,408.00
29-FEB-2024
0.00
Final Allotment
Notice Issued
BC
501
NA
30-AUG-2020
-
-
08-JUL-2022
Notice issued to pay the differential land cost, But not responded.
2241
12
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._9/45
55373
M/s DJS HI-TECH Engineering & Industrial Gases
02-MAR-2018
02-MAR-2018
03-JUL-2018
-
204,408.00
0.00
204,408.00
204,408.00
204,408.00
29-FEB-2024
0.00
Final Allotment
Notice Issued
General
501
NA
30-AUG-2020
-
-
08-JUL-2022
Notice issued to pay the differential land cost, But not responded.
2241
13
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/45
55295
VANITHA INDUSTRIES
09-JUL-2022
09-JUL-2022
28-MAY-2019
-
205,224.00
102,612.00
102,612.00
102,612.00
102,612.00
29-FEB-2024
0.00
Final Allotment
NA
SC
503
NA
31-MAR-2025
-
-
-
Reallotted under YSR JBV Under Go No 7
651
14
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/56
55302
M/s Ruchi Oil Industries
31-JUL-2022
31-JUL-2022
23-JUN-2019
-
205,224.00
102,612.00
102,612.00
102,612.00
102,612.00
29-FEB-2024
0.00
Final Allotment
-
SC
503
NA
31-MAR-2025
-
-
-
JVBM.The land cost paid by the allottee. The allotted plot covered in Land Acquisition Court dispute. Requested for alternate plot with same estate. Hence, recommended for allotment of alternate Plot No.10/56 measuring 503.00 Sq.Mtrs. Sale aggrement to be executed.
629
15
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/67
55850
M/s SRINESH INDUSTRIES
18-JAN-2023
18-JAN-2023
28-MAR-2019
-
205,224.00
140,556.00
64,668.00
64,668.00
140,556.00
29-FEB-2024
0.00
Final Allotment
NA
SC_W
503
NA
31-MAR-2025
-
-
-
REALLOTMENT UNDER YSR JVB
458
16
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/108
55916
M/S HEMA POLYMERS
09-JUL-2022
09-JUL-2022
04-DEC-2018
-
205,224.00
102,612.00
102,612.00
102,612.00
102,612.00
29-FEB-2024
0.00
Final Allotment
NA
ST
503
NA
31-MAR-2025
-
-
-
Reallotment of GO No 07 JBV
651
17
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/217
55160
Harsha Engineering Works
23-AUG-2022
23-AUG-2022
08-NOV-2022
-
205,632.00
102,816.00
102,816.00
102,816.00
102,816.00
29-FEB-2024
0.00
Final Allotment
-
SC
504
NA
31-MAR-2025
-
-
-
JBVM The allottee paid the land cost in full. Pending for execution of Sale Agreement due to non confirmation of the land cost. Hence, recommended for execution of sale agreement for the same plot duly giving time of 3 years for implementation of the project.
606
18
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._11/27/A,PLOT NO._11/28
55796
Vijaya Engineering Works
02-MAR-2018
02-MAR-2018
22-OCT-2020
-
306,816.00
0.00
306,816.00
306,816.00
306,816.00
29-FEB-2024
0.00
Final Allotment
Notice Issued
General
752
NA
30-AUG-2020
-
-
05-JUL-2022
Notice issued to pay the differential land cost, But not responded.
2241
19
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/122
55213
SSS CNC TECHNICS
02-MAR-2018
02-MAR-2018
07-MAR-2020
-
310,080.00
0.00
310,080.00
310,080.00
310,080.00
29-FEB-2024
0.00
Final Allotment
Notice Issued
General
760
NA
08-MAR-2020
-
-
02-JUL-2022
Dispute.Final Allotment to be executed
2241
20
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/127
55843
VENKAT ENTERPRISES
02-MAR-2018
02-MAR-2018
23-JUN-2019
-
310,080.00
0.00
310,080.00
310,080.00
310,081.00
29-FEB-2024
0.00
Final Allotment
-
General
760
NA
30-AUG-2020
-
-
-
Final Allotment
2241
21
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/20/B
55287
Akhila Polymers
02-MAR-2018
02-MAR-2018
18-NOV-2019
-
408,000.00
0.00
408,000.00
408,000.00
408,000.00
29-FEB-2024
0.00
Final Allotment
Notice Issued
General
1000
NA
30-AUG-2020
-
-
07-JUL-2022
Sale agreement to be issued
2241
22
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/240/A,PLOT NO._18/247/A
55277
NAGASAI INDUSTRIES
02-MAR-2018
02-MAR-2018
18-JAN-2021
-
408,816.00
0.00
408,816.00
408,816.00
408,816.00
29-FEB-2024
0.00
Final Allotment
Notice Issued
General
1002
NA
08-MAR-2020
-
-
05-JUL-2022
Notice issued to pay the differential land cost, But not responded.
2241
23
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/241/A,PLOT NO._18/246/A
55706
AADI ENGINEERING & TECHNOLOGIES
02-MAR-2018
02-MAR-2018
30-AUG-2019
-
408,816.00
204,408.00
204,408.00
204,408.00
204,409.00
29-FEB-2024
0.00
Final Allotment
-
BC
1002
NA
08-MAR-2020
-
-
-
Notice issued to pay the differential land cost, But not responded.
2241
24
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/79,PLOT NO._10/80
55268
SRI MADHURI ENGINEERING WORKS
02-MAR-2018
02-MAR-2018
14-DEC-2020
-
410,448.00
205,224.00
205,224.00
205,224.00
205,224.00
29-FEB-2024
0.00
Final Allotment
-
SC_W
1006
NA
08-MAR-2020
-
-
-
Final Allotment
2241
25
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/10
55286
Sri Raghava Metals
02-MAR-2018
02-MAR-2018
16-JUL-2019
-
510,000.00
0.00
510,000.00
510,000.00
510,000.00
29-FEB-2024
0.00
Final Allotment
Notice Issued
General
1250
NA
30-AUG-2020
-
-
07-JUL-2022
Notice issued to pay the differential land cost, approached to court.
2241
26
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._17/30
55563
S R ENGINEERING WORKS
02-MAR-2018
02-MAR-2018
03-AUG-2019
-
510,000.00
0.00
510,000.00
510,000.00
510,000.00
29-FEB-2024
0.00
Final Allotment
Notice Issued
General
1250
NA
30-AUG-2020
-
-
07-JUL-2022
Notice issued to pay the differential land cost, But not responde
2241
27
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._19/4
55893
SHIVANI INDUSTRIES
02-MAR-2018
02-MAR-2018
23-JUN-2019
-
581,808.00
0.00
581,808.00
581,808.00
581,808.00
29-FEB-2024
0.00
Final Allotment
Notice Issued
General
1426
NA
08-MAR-2020
-
-
07-JUL-2022
Notice issued to pay the differential land cost, But not responde
2241
28
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._11/73
55791
S.V.INDUSTRIES
02-MAR-2018
02-MAR-2018
14-NOV-2019
-
612,000.00
0.00
612,000.00
612,000.00
612,000.00
29-FEB-2024
0.00
Final Allotment
Notice Issued
General
1500
NA
30-AUG-2020
-
-
07-JUL-2022
Notice issued to pay the differential land cost, But not responded.
2241
29
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/131
57451
Sri Bhavani Metals Pvt Ltd
02-MAR-2018
02-MAR-2018
30-AUG-2019
-
715,632.00
0.00
715,632.00
715,632.00
71,400.00
29-FEB-2024
644,232.00
Final Allotment
Notice Issued
General
1754
NA
30-AUG-2020
-
-
07-JUL-2022
Notice issued to pay the differential land cost, But not responded.
2241
30
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/33/A
55787
ASCENTECH ENGINEERING
02-MAR-2018
02-MAR-2018
25-NOV-2020
-
816,000.00
0.00
816,000.00
816,000.00
816,000.00
29-FEB-2024
0.00
Final Allotment
Notice Issued
General
2000
NA
30-AUG-2020
-
-
07-JUL-2022
Notice issued to pay the differential land cost, But not responded.
2241
31
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/10,PLOT NO._18/11
55270
Sri Vinayak electricals
02-MAR-2018
02-MAR-2018
09-SEP-2019
-
1,224,000.00
0.00
1,224,000.00
1,224,000.00
1,247,664.00
29-FEB-2024
0.00
Final Allotment
Notice Issued
General
3000
NA
08-MAR-2020
-
-
07-JUL-2022
Notice issued to pay the differential land cost, But not responded.
2241
32
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/43
55301
Creative Pre Fab
02-MAR-2018
02-MAR-2018
07-MAR-2020
-
1,653,216.00
0.00
1,653,216.00
1,653,216.00
1,653,216.00
29-FEB-2024
0.00
Final Allotment
Notice Issued
General
4052
NA
08-MAR-2020
-
-
07-JUL-2022
Notice issued to pay the differential land cost, But not responded.
2241
33
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/228,PLOT NO._18/229
55203
metal tech industries
02-MAR-2018
02-MAR-2018
28-JAN-2020
-
4,088,816.00
2,000,000.00
2,088,816.00
2,088,816.00
204,408.00
29-FEB-2024
1,884,408.00
Final Allotment
Notice Issued
SC
1002
NA
08-MAR-2020
-
-
08-JUL-2022
Notice issued to pay the differential land cost, But not responde
2241
34
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/89
56624
TULASIRAM DISPOSABLE PLASTIC CUP AND PLATES
23-AUG-2022
23-AUG-2022
12-MAR-2020
-
204,408.00
102,204.00
102,204.00
102,204.00
102,408.00
29-FEB-2024
0.00
Final Allotment
-
ST
501
NA
31-MAR-2025
-
-
-
JBV Reallotment on 23-08-2022.Final Allotment.Sale Agreement to be Executed
606
35
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._22/9
57003
M/s. Sanjay Industries
09-AUG-2022
09-AUG-2022
18-NOV-2022
-
205,224.00
102,000.00
103,224.00
103,224.00
0.00
-
103,224.00
Final Allotment
NA
SC
503
NA
31-MAR-2025
-
-
-
REALLOTMENT UNDE NO GO NO 7
620
36
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
Plot No-31/88,Plot No-31/89
64735
M/s. DSR Life Sciences
23-JUN-2023
27-JUN-2023
21-OCT-2023
-
4,438,856.00
0.00
4,438,856.00
2,219,428.00
443,886.00
29-FEB-2024
1,775,542.00
Final Allotment
-
General
2014
NA
22-JUN-2025
-
-
-
Provisional Allotment
298
37
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
Plot No-31/58,Plot No-31/59
65048
M/s. J M R Plastics
20-NOV-2023
23-NOV-2023
24-FEB-2024
-
2,208,408.00
0.00
2,208,408.00
552,102.00
0.00
-
552,102.00
Final Allotment
-
SC
1002
R3
19-NOV-2025
-
-
-
Provisional Allotment
149
38
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
Plot No-31/65,Plot No-31/68
65059
M/s. Rajgruha Industries
20-NOV-2023
23-NOV-2023
27-FEB-2024
-
3,272,940.00
0.00
3,272,940.00
818,235.00
0.00
-
818,235.00
Final Allotment
-
SC
1485
R3
19-NOV-2025
-
-
-
Provisional Allotment
149
39
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
Plot No-31/69,Plot No-31/70
65169
M/s. Excel Garments
20-NOV-2023
23-NOV-2023
12-FEB-2024
-
3,416,200.00
0.00
3,416,200.00
854,050.00
0.00
-
854,050.00
Final Allotment
-
SC
1550
R3
19-NOV-2025
-
-
-
Provisional Allotment
149
40
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
Plot No_31/5
65300
M/s. B & B Foods Enterprises
22-DEC-2023
23-DEC-2023
15-MAR-2024
-
4,100,498.00
0.00
4,100,498.00
1,025,125.00
0.00
-
1,025,125.00
Final Allotment
-
SC
1824
NA
26-DEC-2025
-
-
-
Final Allotment
119
41
VIJAYAWADA
Krishna
JP_MACHILIPATNAM
LAND (33 KV)
40912
THE DIVISIONAL ELECTRICAL ENGINEER(OPERATION)
21-APR-2009
21-APR-2009
21-APR-2009
-
99,999.60
-
-
99,999.60
0.00
-
99,999.60
Final Allotment
-
Others
2004
G1
21-APR-2011
-
-
-
-
5478
42
VIJAYAWADA
Krishna
AN CHALLAPALLI
MSME-7
61491
SHIVA ENGINERING WORKS
18-JAN-2023
18-JAN-2023
06-FEB-2024
-
1,005,000.00
502,500.00
502,500.00
502,500.00
0.00
-
502,500.00
Final Allotment
Cancelled
SC
300
NA
31-MAR-2025
-
-
-
REALLOTMENT UNDER YSR JVB
458
43
VIJAYAWADA
Krishna
AN CHALLAPALLI
MSME-4
61497
JONNADULA CHAITANYA
17-FEB-2020
17-FEB-2020
16-SEP-2021
-
984,000.00
492,000.00
492,000.00
492,000.00
43,230.00
29-FEB-2024
448,770.00
Final Allotment
-
BC
300
NA
16-FEB-2021
-
-
-
Final Allotment
1524
44
VIJAYAWADA
Krishna
AN CHALLAPALLI
75
63320
VASANTARAO AUTO CONSULTANCY
19-JAN-2022
31-JAN-2022
24-AUG-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
General
51
NA
18-JAN-2026
-
-
-
Final Allotment
810
45
VIJAYAWADA
Krishna
AN CHALLAPALLI
89
63322
VIGNESWARA LORRY SUPLLY OFFICE
19-JAN-2022
29-JAN-2022
23-SEP-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
General
51
NA
18-JAN-2026
-
-
-
FINAL ALLOTMENT ORDERS.SALE DEED AT TO BE EXECUTED
812
46
VIJAYAWADA
Krishna
AN CHALLAPALLI
131
63387
GIRISHWAR MECHANICAL WORKS
07-FEB-2022
14-FEB-2022
19-OCT-2023
-
188,445.00
94,223.00
94,222.00
94,222.00
0.00
-
94,222.00
Final Allotment
-
SC
51
NA
06-FEB-2026
-
-
-
Land Cost Paid
796
47
VIJAYAWADA
Krishna
AN CHALLAPALLI
124
63491
KOTESWARAMMA MECHANICAL WORKS
15-MAR-2022
29-MAR-2022
11-AUG-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
General
51
NA
14-MAR-2026
-
-
-
Final Allotment
753
48
VIJAYAWADA
Krishna
AN CHALLAPALLI
151
64124
JABEER MECHANICAL WORKS
27-DEC-2022
04-JAN-2023
11-AUG-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
BC
51
NA
26-DEC-2024
-
-
-
Final Allotment
472
49
VIJAYAWADA
Krishna
AN CHALLAPALLI
84
64206
SHABUL MOTORS
27-DEC-2022
04-JAN-2023
11-AUG-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
BC
51
NA
26-DEC-2024
-
-
-
Final Allotment
472
50
VIJAYAWADA
Krishna
AN CHALLAPALLI
79
64208
LAKSHMI AUTOSTORES
27-DEC-2022
04-JAN-2023
11-AUG-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
General
51
NA
26-DEC-2024
-
-
-
Provisional Allotment
472
51
VIJAYAWADA
Krishna
AN CHALLAPALLI
23
64209
SRI RAGHAVAIAH AUTOMOBILES
27-DEC-2022
04-JAN-2023
11-AUG-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
General
51
NA
26-DEC-2024
-
-
-
Prvisional Allotment
472
52
VIJAYAWADA
Krishna
AN CHALLAPALLI
186
64315
FATHIMA KOLLIMI WORKS
01-MAR-2023
02-MAR-2023
12-SEP-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
BC
51
NA
02-MAR-2025
-
-
-
Land cost paid
415
53
VIJAYAWADA
Krishna
AN CHALLAPALLI
194
64318
KHADAR BEG FOUNDARY WORKS
01-MAR-2023
02-MAR-2023
11-AUG-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
BC
51
NA
02-MAR-2025
-
-
-
Final Allotment
415
54
VIJAYAWADA
Krishna
AN CHALLAPALLI
197
64323
BISMILLAH WELDING WORKS
01-MAR-2023
02-MAR-2023
11-AUG-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
BC
51
NA
02-MAR-2025
-
-
-
Provisional Allotment
415
55
VIJAYAWADA
Krishna
AN CHALLAPALLI
153
64324
ARSHAD SEAT AND BAG WORKS
01-MAR-2023
02-MAR-2023
11-AUG-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
BC
51
NA
02-MAR-2025
-
-
-
Final Allotment
415
56
VIJAYAWADA
Krishna
AN CHALLAPALLI
100
64327
BHAVANI SREEJA AUTO ELECTRICAL WORKS
01-MAR-2023
02-MAR-2023
11-AUG-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
General
51
NA
02-MAR-2025
-
-
-
Provisional Allotment
415
57
VIJAYAWADA
Krishna
AN CHALLAPALLI
15
64331
RAVI OILS
01-MAR-2023
02-MAR-2023
11-AUG-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
General
51
NA
02-MAR-2025
-
-
-
Provisional Allotment
415
58
VIJAYAWADA
Krishna
AN CHALLAPALLI
10
64332
BALAJI TYRES
01-MAR-2023
02-MAR-2023
11-AUG-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
General
51
NA
02-MAR-2025
-
-
-
Final Allotment
415
59
VIJAYAWADA
Krishna
AN CHALLAPALLI
116
64337
SANKAR BATTERY WORKS
01-MAR-2023
02-MAR-2023
11-AUG-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
General
51
NA
02-MAR-2025
-
-
-
Final Allotment
415
60
VIJAYAWADA
Krishna
AN CHALLAPALLI
154
64391
SRI VENKATESWARA MECHANICAL WORKS
01-MAR-2023
02-MAR-2023
04-SEP-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
General
51
NA
02-MAR-2025
-
-
-
Land cost paid with in time
415
61
VIJAYAWADA
Krishna
AN CHALLAPALLI
6
64392
LEELA KRISHNA LUBRICANTS
01-MAR-2023
02-MAR-2023
11-AUG-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
General
51
NA
02-MAR-2025
-
-
-
Final Allotment
415
62
VIJAYAWADA
Krishna
AN CHALLAPALLI
152
64395
RAMESH ENGINEERING WORKS
01-MAR-2023
02-MAR-2023
11-AUG-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
BC
51
NA
02-MAR-2025
-
-
-
Final Allotment
415
63
VIJAYAWADA
Krishna
AN CHALLAPALLI
8
64396
LEELA KRISHNA AUTOMOBILES
01-MAR-2023
02-MAR-2023
12-SEP-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
BC
51
NA
02-MAR-2025
-
-
-
Land cost Paid
415
64
VIJAYAWADA
Krishna
AN CHALLAPALLI
188
64403
MUSTAFA FOUNDARY WORKS
01-MAR-2023
02-MAR-2023
11-AUG-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
BC
51
NA
02-MAR-2025
-
-
-
Final Allotment
415
65
VIJAYAWADA
Krishna
AN CHALLAPALLI
139
64444
KARTHEEK WELDING WORKS
01-MAR-2023
02-MAR-2023
04-SEP-2023
-
188,445.00
94,223.00
94,222.00
94,222.00
0.00
-
94,222.00
Land Cost Paid
-
SC
51
NA
02-MAR-2025
-
-
-
Land cost paid with in time
415
66
VIJAYAWADA
Krishna
AN CHALLAPALLI
82
64635
KHUDDUS PAINTING WORKS
23-JUN-2023
28-JUN-2023
15-SEP-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
BC
51
NA
22-JUN-2025
-
-
-
Final Allotment
297
67
VIJAYAWADA
Krishna
AN CHALLAPALLI
119
64636
SAI MOTOR CYCLE WORKS
23-JUN-2023
28-JUN-2023
17-OCT-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
BC
51
NA
22-JUN-2025
-
-
-
Final Allotment
297
68
VIJAYAWADA
Krishna
AN CHALLAPALLI
103
64643
MALLI MECHANICAL WORKS
23-JUN-2023
27-JUN-2023
04-SEP-2023
-
188,445.00
94,223.00
94,222.00
94,222.00
0.00
-
94,222.00
Final Allotment
-
SC
51
NA
22-JUN-2025
-
-
-
Land cost paid with in time
298
69
VIJAYAWADA
Krishna
AN CHALLAPALLI
111
64644
SRI LAKSHMI ARUNA ENGINE REBOARING WORKS
23-JUN-2023
27-JUN-2023
04-SEP-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
General
51
NA
22-JUN-2025
-
-
-
Land cost paid with in time
298
70
VIJAYAWADA
Krishna
AN CHALLAPALLI
95
64662
SURESH MECHANICAL WORKS
23-JUN-2023
28-JUN-2023
17-OCT-2023
-
188,445.00
94,223.00
94,222.00
94,222.00
0.00
-
94,222.00
Final Allotment
-
SC
51
NA
22-JUN-2025
-
-
-
Provisional Allotment
297
71
VIJAYAWADA
Krishna
AN CHALLAPALLI
81
64663
MEHER PAINTS AND IRON
23-JUN-2023
28-JUN-2023
12-SEP-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
General
51
NA
22-JUN-2025
-
-
-
Provisional Allotment
297
72
VIJAYAWADA
Krishna
AN CHALLAPALLI
189
64669
RIDA AUTOMOBILES
23-JUN-2023
27-JUN-2023
23-SEP-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
BC
51
NA
22-JUN-2025
-
-
-
Land cost paid with in time
298
73
VIJAYAWADA
Krishna
AN CHALLAPALLI
233
64680
SYAM MECHANICAL WORKS
23-JUN-2023
27-JUN-2023
12-SEP-2023
-
243,870.00
121,935.00
121,935.00
121,935.00
0.00
-
121,935.00
Final Allotment
-
SC
66
NA
22-JUN-2025
-
-
-
Land cost paid with in time
298
74
VIJAYAWADA
Krishna
AN CHALLAPALLI
205
64697
KALYANA VENKATESWARA MECHANICAL WORKS
23-JUN-2023
28-JUN-2023
04-SEP-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
General
51
NA
22-JUN-2025
-
-
-
Land cost paid with in time
297
75
VIJAYAWADA
Krishna
AN CHALLAPALLI
35
64706
NATIONAL ELECTRONICS
23-JUN-2023
28-JUN-2023
04-SEP-2023
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Final Allotment
-
BC
51
NA
22-JUN-2025
-
-
-
Land cost paid with in time
297
76
VIJAYAWADA
Krishna
AN CHALLAPALLI
223
64717
BISMILLAH MECHANICAL WORKS
23-JUN-2023
27-JUN-2023
15-SEP-2023
-
243,870.00
0.00
243,870.00
243,870.00
24,387.00
29-FEB-2024
219,483.00
Final Allotment
-
BC
66
NA
22-JUN-2025
-
-
-
Land cost paid with in time
298
77
VIJAYAWADA
Krishna
State Food Park, Mallavalli
Plot No.11/C
57089
Vighna Enterprises
02-JUL-2018
02-JUL-2018
11-MAY-2019
-
1,027,000.00
513,500.00
513,500.00
513,500.00
570,000.00
29-FEB-2024
0.00
Provisional Allotment
Notice Issued
SC_W
1000
NA
02-JUL-2020
-
-
29-MAY-2022
NOTICE ISSUED
2119
78
VIJAYAWADA
NTR
IP-Peddavaram
298,299,300
59724
SHAURYA MILLETS
09-AUG-2019
09-AUG-2019
04-OCT-2021
-
831,285.00
0.00
831,285.00
831,285.00
0.00
-
831,285.00
Final Allotment
Notice Issued
SC,Women
1015
NA
08-AUG-2020
-
-
20-JUN-2022
22A Final Allotment
1716
79
VIJAYAWADA
NTR
IP-Peddavaram
53,54
59769
UMA ENGINEERING WORKS
09-AUG-2019
09-AUG-2019
04-OCT-2021
-
491,400.00
245,700.00
245,700.00
245,700.00
49,140.00
29-FEB-2024
196,560.00
Final Allotment
Notice Issued
BC
600
NA
08-AUG-2020
-
-
20-JUN-2022
22A Final Allotment
1716
80
VIJAYAWADA
NTR
IP-Peddavaram
222
59773
VENKATESH GENERAL ENGINEERING WORKS
09-AUG-2019
09-AUG-2019
12-OCT-2021
-
245,700.00
122,850.00
122,850.00
122,850.00
24,570.00
29-FEB-2024
98,280.00
Final Allotment
-
BC
300
NA
08-AUG-2020
-
-
-
22A FINAL ALLOTMENT
1716
81
VIJAYAWADA
NTR
IP-Peddavaram
118
59782
SRAVYA SSRI TECHNOLOGIES
09-AUG-2019
09-AUG-2019
04-OCT-2021
-
245,700.00
122,850.00
122,850.00
122,850.00
24,570.00
29-FEB-2024
98,280.00
Final Allotment
Notice Issued
BC
300
NA
08-AUG-2020
-
-
20-JUN-2022
22A sale agreement to be executed
1716
82
VIJAYAWADA
NTR
IP-Peddavaram
135
59785
NEW RAHA MATTRESSES PRODUCTS
09-AUG-2019
09-AUG-2019
15-NOV-2021
-
285,831.00
142,916.00
142,915.00
142,915.00
28,583.00
29-FEB-2024
114,332.00
Final Allotment
Notice Issued
BC
349
NA
08-AUG-2020
-
-
20-JUN-2022
22A Sale agreement to be executed
1716
83
VIJAYAWADA
NTR
IP-Peddavaram
62,63
59798
Neeraja Enterprises
09-AUG-2019
09-AUG-2019
04-OCT-2021
-
491,400.00
0.00
491,400.00
491,400.00
49,140.00
29-FEB-2024
442,260.00
Final Allotment
Notice Issued
General
600
NA
08-AUG-2020
-
-
01-JUL-2022
22A Sale agreement to be executed
1716
84
VIJAYAWADA
NTR
IP-Peddavaram
265
59799
SHAHENSHA PAPAD
09-AUG-2019
09-AUG-2019
05-NOV-2021
-
274,365.00
137,183.00
137,182.00
137,182.00
27,437.00
29-FEB-2024
109,745.00
Final Allotment
Notice Issued
BC
335
NA
08-AUG-2020
-
-
20-JUN-2022
22A Sale agreement to be executed
1716
85
VIJAYAWADA
NTR
IP-Peddavaram
108,109,110
59805
KBS Engineering & Fabricators
09-AUG-2019
09-AUG-2019
01-JAN-2022
-
737,100.00
368,550.00
368,550.00
368,550.00
73,710.00
29-FEB-2024
294,840.00
Final Allotment
Notice Issued
BC
900
NA
08-AUG-2020
-
-
20-JUL-2022
22A Sale agreement to be executed
1716
86
VIJAYAWADA
NTR
IP-Peddavaram
275
59821
K R Engineering Works
09-AUG-2019
09-AUG-2019
04-OCT-2021
-
245,700.00
122,850.00
122,850.00
122,850.00
24,570.00
29-FEB-2024
98,280.00
Final Allotment
Notice Issued
BC
300
NA
08-AUG-2020
-
-
20-JUL-2022
22A Sale agreement to be executed
1716
87
VIJAYAWADA
NTR
IP-Peddavaram
161,162,163
61570
SRI VISHNU PAVAN ENGINEERING
24-FEB-2020
24-FEB-2020
18-JAN-2022
-
737,100.00
0.00
737,100.00
737,100.00
73,710.00
29-FEB-2024
663,390.00
Final Allotment
Notice Issued
General
900
NA
23-FEB-2021
-
-
20-JUL-2022
Final Allotment
1517
88
VIJAYAWADA
NTR
IP_JAGGAIAHPET
PLOT NO_164
62563
KAIZEN ENTERPRISES
05-MAR-2021
05-MAR-2021
27-FEB-2024
-
3,689,000.00
1,844,500.00
1,844,500.00
1,844,500.00
0.00
-
1,844,500.00
Final Allotment
-
SC
1054
NA
04-MAR-2025
-
-
-
Land cost paid.(10% excess area ho conseder on 30-05-2023
1142