S.No  |  DISTRICT  |  ZONE  |  INDUSTRIAL PARK  |  PLOT NO  |  ALLOTMENT NUMBER  |  NAME OF THE INDUSTRY  |  ALLOTMENT DATE  |  PROVISIONAL ALLOTMENT DATE  |  FINAL ALLOTMENT DATE  |  DATE OF PHYSICAL POSSESSION  |  ALLOTMENT VALUE  |  REBATE AMOUNT  |  NET ALLOTMENT VALUE  |  ADVANCE TO BE PAID  |  AMOUNT RECEIVED  |  LAST PAID DATE  |  BALANCE ADVANCE AMOUNT  |  STATUS OF ALLOTMENT  |  CANCELLATION  |  CATEGORY OF ALLOTMENT  |  EXTENT IN SQM  |  IMPLEMENTATION STATUS CODE NEW  |  IMPLEMENTATION DUE DATE  |  DCP DATE  |  EOT PERIOD  |  NOTICE ISSUED DATE  |  IMPL ZM REMARKS  |  ALLOTMENT AGE IN DAYS  |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
PUTTAPARTHY |
Anantapur |
IP _Anantapur |
Plot No. 76 & 77,Plot No.75 |
44924 |
M/s. Techno Industrial Engineering Materal Testing, Designing-cum-Servicing Centre |
18-MAR-2011 |
18-MAR-2011 |
13-APR-2011 |
13-APR-2011 |
4,266,050.00
|
- |
- |
4,266,050.00 |
0.00 |
- |
4,266,050.00 |
Sale Agreement(Lease Deed) |
Court Case |
General |
8533 |
R2 |
13-APR-2013 |
- |
- |
- |
Covered by court case |
4781 |
2 |
PUTTAPARTHY |
Anantapur |
IP_GOOTY |
89 |
18913 |
M/s. Sai Ganesh Granites |
16-JAN-2010 |
16-JAN-2010 |
19-MAR-2010 |
12-MAY-2016 |
166,250.00
|
- |
- |
166,250.00 |
0.00 |
- |
166,250.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
Others |
1750 |
R2 |
11-MAY-2018 |
- |
- |
08-AUG-2022 |
EoT Sanctioned but Fee not paid. |
5207 |
3 |
PUTTAPARTHY |
Anantapur |
IP_GOOTY |
49,50,54,55 |
24838 |
Madhu Decorticators |
23-MAR-2010 |
23-MAR-2010 |
29-MAY-2010 |
10-JUN-2010 |
159,600.00
|
7,980.00 |
151,620.00 |
151,620.00 |
0.00 |
- |
151,620.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
1596 |
G2 |
10-JUN-2012 |
- |
- |
08-AUG-2022 |
Notice issued for submission of documents |
5141 |
4 |
PUTTAPARTHY |
Anantapur |
IP_GOOTY |
40 |
45109 |
M/s. Venkateswara Brick Industry |
19-FEB-2014 |
19-FEB-2014 |
06-JUN-2014 |
16-JUL-2014 |
184,800.00
|
61,594.00 |
123,206.00 |
123,206.00 |
71,144.00 |
- |
52,062.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
840 |
G2 |
16-JUL-2016 |
- |
- |
08-AUG-2022 |
Sale Agreement registered on Lease Basis.Not Working due to Covid. |
3712 |
5 |
PUTTAPARTHY |
Anantapur |
IP_GOOTY |
37,38 |
57588 |
KG SEED PROCESSING |
16-OCT-2018 |
16-OCT-2018 |
15-APR-2019 |
29-JUL-2019 |
811,300.00
|
405,650.00 |
405,650.00 |
405,650.00 |
409,000.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
1900 |
G4 |
28-JUL-2021 |
- |
- |
08-AUG-2022 |
Civil Works in progress |
2012 |
6 |
PUTTAPARTHY |
Anantapur |
IP_GOOTY |
88 |
61157 |
Sri Narasimha All Millers |
02-MAR-2020 |
02-MAR-2020 |
21-APR-2020 |
01-OCT-2020 |
1,062,901.00
|
531,450.00 |
531,451.00 |
531,451.00 |
531,451.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
2219 |
G2 |
01-APR-2023 |
- |
- |
06-SEP-2022 |
Trail Production under progress |
1509 |
7 |
PUTTAPARTHY |
Anantapur |
IP_GOOTY |
70 |
62119 |
NANDINI INDUSTRY |
06-JAN-2021 |
06-JAN-2021 |
13-JUL-2021 |
20-SEP-2021 |
597,792.00
|
298,896.00 |
298,896.00 |
298,896.00 |
304,796.00 |
29-FEB-2024 |
0.00 |
Lease Deed(AR 2020) |
- |
ST |
1248 |
G3 |
20-SEP-2023 |
- |
- |
- |
Civil Works completed,Machinery erected |
1199 |
8 |
PUTTAPARTHY |
Anantapur |
IP_GOOTY |
124,125 |
61800 |
SRI LAKSHMI NARASIMHA INDUSTRIES |
20-FEB-2021 |
20-FEB-2021 |
13-JUL-2021 |
20-SEP-2021 |
871,301.00
|
435,651.00 |
435,650.00 |
435,650.00 |
435,651.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
- |
SC |
1819 |
R2 |
20-MAR-2024 |
- |
- |
- |
Sale Agreement executed & Registered.Approvals yet to be obtained. |
1154 |
9 |
PUTTAPARTHY |
Anantapur |
IP_Guntakal |
CFC3 |
39359 |
SRI SAI GRANITES |
19-NOV-2011 |
19-NOV-2011 |
29-FEB-2012 |
23-JUL-2012 |
1,155,600.00
|
- |
- |
1,155,600.00 |
0.00 |
- |
1,155,600.00 |
Sale Agreement(Lease Deed) |
Court Case |
Women-General |
1926 |
R2 |
23-JUL-2014 |
- |
- |
- |
Covered by court case |
4535 |
10 |
PUTTAPARTHY |
Anantapur |
IP-RAPTHADU |
PLOT-1 |
54140 |
M/s. Page Industries Ltd |
08-DEC-2017 |
08-DEC-2017 |
26-FEB-2018 |
22-JUN-2018 |
26,870,000.00
|
0.00 |
26,870,000.00 |
26,870,000.00 |
28,591,040.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
- |
General |
108743 |
R2 |
21-JUN-2021 |
- |
- |
- |
Allottee requested for cancellation of Allottment .Pending at Govt Level/HO. |
2324 |
11 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
Plot-278 |
59227 |
YOGA AGRI FOODS N HEALTH PRODUCTS |
02-MAR-2019 |
02-MAR-2019 |
25-JUN-2019 |
07-NOV-2019 |
219,900.00
|
109,950.00 |
109,950.00 |
109,950.00 |
138,770.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
BC |
300 |
G3 |
17-MAY-2021 |
- |
- |
08-AUG-2022 |
Civil works Completed.Machinery erected. |
1875 |
12 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
265 |
59318 |
GAGANA INDUSTRIES |
02-MAR-2019 |
02-MAR-2019 |
10-JUL-2019 |
10-DEC-2019 |
219,900.00
|
109,950.00 |
109,950.00 |
109,950.00 |
109,950.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC,Women |
300 |
R2 |
10-DEC-2021 |
- |
30-SEP-2023 |
15-SEP-2023 |
Sale Agreement executed & registered.Approvals yet to be obtained. |
1875 |
13 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
211 |
59298 |
M/s GEETHIKA INDUSTRIES |
02-MAR-2019 |
02-MAR-2019 |
07-FEB-2020 |
16-DEC-2020 |
287,336.00
|
143,668.00 |
143,668.00 |
143,668.00 |
143,668.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
BC |
392 |
R2 |
15-DEC-2022 |
- |
- |
08-SEP-2023 |
Sale Agreement executed & Registered.Approvals yet to be obtained. |
1875 |
14 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
123,124,125B,79,80 |
58447 |
VINAYAK NP ENTERPRISES |
12-MAR-2019 |
12-MAR-2019 |
28-JUN-2019 |
07-NOV-2019 |
989,550.00
|
494,775.00 |
494,775.00 |
494,775.00 |
902,318.00 |
29-FEB-2024 |
0.00 |
Sale Deed |
NA |
ST,Women |
1350 |
G4 |
07-NOV-2021 |
- |
- |
08-AUG-2022 |
Civil works under progress |
1865 |
15 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
33,34 |
60016 |
SRI LAKSHMI VENKATESWARA INDUSTRIES |
19-AUG-2019 |
19-AUG-2019 |
03-DEC-2019 |
22-JUN-2020 |
439,800.00
|
0.00 |
439,800.00 |
439,800.00 |
439,800.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
600 |
G2 |
21-DEC-2021 |
- |
- |
08-AUG-2022 |
Trail Production under progress |
1705 |
16 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
181,182,183,184 |
60079 |
R K STONES AND GRANITES |
03-SEP-2019 |
03-SEP-2019 |
24-FEB-2020 |
14-SEP-2020 |
1,011,540.00
|
505,770.00 |
505,770.00 |
505,770.00 |
505,770.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
BC |
1380 |
G4 |
13-SEP-2022 |
- |
31-MAR-2024 |
08-AUG-2022 |
Civil Works commenced |
1690 |
17 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
186,Plot--185 |
60918 |
M/s R K STONES & GRANITES |
21-DEC-2019 |
21-DEC-2019 |
17-AUG-2020 |
14-SEP-2020 |
566,490.00
|
0.00 |
566,490.00 |
566,490.00 |
567,671.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
690 |
G4 |
13-SEP-2022 |
- |
31-MAR-2024 |
08-AUG-2022 |
Civil Works Commenced |
1581 |
18 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-55A |
24159 |
M. GOUSE |
07-JUL-2010 |
07-JUL-2010 |
07-JUL-2010 |
22-SEP-2010 |
4,170.00
|
- |
- |
4,170.00 |
0.00 |
- |
4,170.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
Others |
139 |
G4 |
22-SEP-2012 |
- |
- |
01-DEC-2021 |
Notice Issued |
5035 |
19 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-258 |
25035 |
M. MUNI RAJU |
10-AUG-2010 |
10-AUG-2010 |
10-AUG-2010 |
18-SEP-2010 |
5,922.00
|
- |
- |
5,922.00 |
0.00 |
- |
5,922.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
Others |
198 |
G4 |
18-SEP-2012 |
- |
- |
29-JUN-2019 |
Notice Issued |
5001 |
20 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-308B |
25232 |
S. ZABIULLA |
06-SEP-2010 |
06-SEP-2010 |
06-SEP-2010 |
01-OCT-2010 |
3,642.00
|
- |
- |
3,642.00 |
0.00 |
- |
3,642.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
Others |
122 |
G2 |
01-OCT-2012 |
- |
- |
01-DEC-2021 |
Production Commenced |
4974 |
21 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-28A |
25265 |
SAIFULLA |
06-SEP-2010 |
06-SEP-2010 |
06-SEP-2010 |
02-JAN-2013 |
7,593.00
|
- |
- |
7,593.00 |
0.00 |
- |
7,593.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
Others |
254 |
G2 |
06-JAN-2012 |
- |
- |
01-DEC-2021 |
Production started |
4974 |
22 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-88B |
25310 |
S. ALLABAKASH |
06-SEP-2010 |
06-SEP-2010 |
06-SEP-2010 |
01-OCT-2010 |
9,732.00
|
- |
- |
9,732.00 |
0.00 |
- |
9,732.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
Others |
325 |
G4 |
01-OCT-2012 |
- |
- |
01-DEC-2021 |
Notice Issued |
4974 |
23 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-122A |
58826 |
Fakruddin Electrical Works |
03-FEB-2014 |
03-FEB-2014 |
03-FEB-2014 |
09-JUN-2015 |
4,170.00
|
0.00 |
4,170.00 |
4,170.00 |
0.00 |
- |
4,170.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
139 |
G4 |
08-JUN-2017 |
- |
- |
29-JUN-2019 |
Notice Issued |
3728 |
24 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-155A |
59002 |
S.Nayaz |
01-JUL-2016 |
01-JUL-2016 |
28-JUL-2016 |
07-MAY-2018 |
6,360.00
|
0.00 |
6,360.00 |
6,360.00 |
0.00 |
- |
6,360.00 |
Sale Agreement(Lease Deed) |
- |
General |
212 |
G2 |
26-MAR-2020 |
- |
- |
- |
Unit is working. |
2849 |
25 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-55 |
59035 |
M/s Shameer Diesel Pump Workshop |
01-MAR-2017 |
01-MAR-2017 |
01-APR-2017 |
07-MAY-2018 |
1,920.00
|
0.00 |
1,920.00 |
1,920.00 |
0.00 |
- |
1,920.00 |
Sale Agreement(Lease Deed) |
- |
General |
64 |
G2 |
26-MAR-2020 |
- |
- |
- |
Plot was allotted by the President and Other members of the Association. |
2606 |
26 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-214 |
59034 |
M/s. Sikandar Electrical Works |
01-MAR-2017 |
01-MAR-2017 |
01-APR-2017 |
01-APR-2017 |
3,510.00
|
0.00 |
3,510.00 |
3,510.00 |
0.00 |
- |
3,510.00 |
Sale Agreement(Lease Deed) |
- |
General |
117 |
G2 |
26-MAR-2020 |
- |
- |
- |
Implemented |
2606 |
27 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-85B |
58897 |
M/s.Alimulla Lathe Works |
27-MAR-2019 |
27-MAR-2019 |
27-MAR-2019 |
27-MAR-2019 |
8,160.00
|
0.00 |
8,160.00 |
8,160.00 |
0.00 |
- |
8,160.00 |
Sale Agreement(Lease Deed) |
- |
General |
272 |
G2 |
26-MAR-2020 |
- |
- |
- |
Implemented Auto Nagar Association |
1850 |
28 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-27A |
58865 |
M/s. Rahamatulla Heavy Vehical Works |
27-MAR-2019 |
27-MAR-2019 |
- |
09-JUN-2015 |
12,150.00
|
0.00 |
12,150.00 |
12,150.00 |
0.00 |
- |
12,150.00 |
Sale Agreement(Lease Deed) |
- |
General |
405 |
G4 |
08-JUN-2017 |
- |
- |
- |
Sale Agreement executed on 28-MAY-2015 |
1850 |
29 |
PUTTAPARTHY |
Sri Sathya Sai |
APIIC_HINDUPUR_GC |
LAND3 |
2118 |
NEOGEON PROPERTIES (P) LTD., |
21-NOV-2005 |
21-NOV-2005 |
28-MAR-2006 |
10-MAY-2006 |
84,983,216.00
|
- |
- |
84,983,216.00 |
0.00 |
- |
84,983,216.00 |
Sale Agreement(Lease Deed) |
Court Case |
General |
1416450 |
R2 |
10-MAY-2008 |
- |
- |
- |
Supplementary Agreement cum Amendment was executed vide doc No.11421/2024 Dt:28.02.2024 . |
6724 |
30 |
PUTTAPARTHY |
Sri Sathya Sai |
APIIC_HINDUPUR_GC |
212 |
24839 |
AZAD ISPAT INDIA PVT.LTD |
11-AUG-2010 |
11-AUG-2010 |
12-NOV-2010 |
15-NOV-2010 |
667,280.00
|
- |
- |
667,280.00 |
0.00 |
- |
667,280.00 |
Cancelled & Restored |
Notice Issued |
General |
1335 |
R2 |
15-NOV-2012 |
- |
28-FEB-2014 |
23-FEB-2024 |
Final Show cause notice on 23.02.2024 issued for Non-Implementation of project . |
5000 |
31 |
PUTTAPARTHY |
Sri Sathya Sai |
APIIC_HINDUPUR_GC |
256G |
43751 |
SLNS Instries |
08-JAN-2015 |
08-JAN-2015 |
16-MAY-2015 |
02-DEC-2015 |
1,305,584.00
|
- |
- |
1,305,584.00 |
0.00 |
- |
1,305,584.00 |
Cancelled & Restored |
- |
SC |
2332 |
G4 |
02-DEC-2017 |
- |
31-MAR-2020 |
19-FEB-2024 |
Show Cause Notice Issued for Non-plementation of the project Dt:19.02.2024. |
3389 |
32 |
PUTTAPARTHY |
Sri Sathya Sai |
APIIC_HINDUPUR_GC |
226,227 |
53020 |
Menapati Cashew Factory |
30-MAR-2017 |
30-MAR-2017 |
16-MAR-2018 |
14-JUN-2018 |
2,116,368.00
|
1,058,184.00 |
1,058,184.00 |
1,058,184.00 |
0.00 |
- |
1,058,184.00 |
Sale Agreement(Lease Deed) |
- |
ST |
2989 |
R2 |
31-MAY-2020 |
- |
14-JUN-2022 |
15-APR-2024 |
Notice issued for Non-Implementation of Project & request for alternative allotment on Dt:15.04.2024. |
2577 |
33 |
PUTTAPARTHY |
Sri Sathya Sai |
APIIC_HINDUPUR_GC |
258B |
57100 |
VADISALA INDUSTRIES |
30-APR-2018 |
30-APR-2018 |
28-NOV-2018 |
15-MAR-2019 |
1,279,950.00
|
639,975.00 |
639,975.00 |
639,975.00 |
0.00 |
- |
639,975.00 |
Lease Deed(AR 2020) |
Notice Issued |
SC |
966 |
R2 |
13-MAR-2021 |
- |
- |
03-OCT-2023 |
Show Cause Notice issued for Non- Implementatiion of the Project Dt:03.10.2023 and the allottee requested for EOT . |
2181 |
34 |
PUTTAPARTHY |
Sri Sathya Sai |
ERRAMANCHI-NH-UDL-3 |
PLOT-2 |
63044 |
M/s QSR HOTELS |
03-DEC-2021 |
04-DEC-2021 |
05-DEC-2021 |
26-DEC-2021 |
22,080,432.00
|
0.00 |
22,080,432.00 |
22,080,432.00 |
0.00 |
- |
22,080,432.00 |
Sale Agreement(Lease Deed) |
- |
SC |
8094 |
G4 |
25-DEC-2023 |
- |
- |
12-DEC-2023 |
The allottee has submitted FSSAI Certificate Food Safety Certificate , Udhyam Registration , labour license and power release certificate and civil works are under progress. |
867 |
35 |
PUTTAPARTHY |
Sri Sathya Sai |
Gudipalli-UDL |
UDL-3 |
56121 |
M/s Inn Pharma Technologies(P) Ltd. |
17-APR-2018 |
17-APR-2018 |
04-MAY-2018 |
19-JUL-2018 |
4,448,554.00
|
0.00 |
4,448,554.00 |
4,448,554.00 |
4,448,462.00 |
29-FEB-2024 |
92.00 |
Cancelled & Restored |
Notice Issued |
General |
19426 |
R2 |
18-JAN-2020 |
- |
18-JUL-2020 |
10-JUN-2019 |
Allotment of Alternative Land of Plot UDL-3 at UDL- Gudipalli and Sale Agreement was executed on Dt:13.09.2023 and requested to HO for modification of extent on Dt:22.12.2023 |
2194 |
36 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_GOLLAPURAM |
PLOT-15 |
4188 |
SRI SUBRAMANYESWARA STEELS PRIVATE LIMITED |
23-JUN-2009 |
23-JUN-2009 |
14-JUL-2009 |
29-OCT-2009 |
6,500,000.00
|
- |
- |
6,500,000.00 |
0.00 |
- |
6,500,000.00 |
Sale Agreement(Lease Deed) |
- |
General |
40470 |
R1 |
29-OCT-2011 |
- |
- |
- |
Land covered by POT |
5414 |
37 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_GOLLAPURAM |
PLOT-44 |
23287 |
JAYA DEALTRADE PRIVATE LIMITED |
18-MAY-2010 |
18-MAY-2010 |
16-JUL-2010 |
22-JUL-2010 |
6,522,186.00
|
- |
- |
6,522,186.00 |
0.00 |
- |
6,522,186.00 |
Sale Agreement(Lease Deed) |
Court Case |
Others |
40470 |
R2 |
22-JUL-2012 |
- |
- |
- |
As per the mail received from HO on Dt:28.06.2023 and detailed report to send head offfice on M/s Jaya Deal trade Pvt Ltd on Dt:19.11.2023 |
5085 |
38 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_GOLLAPURAM |
PLOT-61/D,PLOT-61/E |
61757 |
CONSOLIDATED MANUFACTURING INDUSTRIES INDIA PRIVATE LIMITED |
29-APR-2020 |
29-APR-2020 |
16-NOV-2020 |
18-DEC-2020 |
13,460,322.00
|
0.00 |
13,460,322.00 |
13,460,322.00 |
13,460,322.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
- |
General |
8094 |
G3 |
17-DEC-2022 |
- |
- |
02-JAN-2024 |
The company has erected manchinery and requested allottee to apply eot through online single desk portal and EOT under process. |
1451 |
39 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_GOLLAPURAM |
PLOT-23A |
62422 |
VIRGO LAMINATES LIMITED UNIT-2 |
19-FEB-2021 |
19-FEB-2021 |
06-AUG-2021 |
23-SEP-2021 |
20,190,484.00
|
0.00 |
20,190,484.00 |
20,190,484.00 |
20,190,484.00 |
29-FEB-2024 |
0.00 |
Lease Deed(AR 2020) |
- |
General |
12141 |
G3 |
22-SEP-2023 |
- |
- |
11-DEC-2023 |
The company has erected the manchinery and the company yet to start the commercial production , PESO license is awaited and amendment orders issued Dt:20.02.2024 from lease to ORS . |
1155 |
40 |
PUTTAPARTHY |
Sri Sathya Sai |
IP GUDIPALLI |
Plot-35 |
57408 |
UE PRESS TOOLS PVT LTD |
19-JUL-2018 |
19-JUL-2018 |
24-OCT-2018 |
29-JAN-2020 |
6,001,701.00
|
0.00 |
6,001,701.00 |
6,001,701.00 |
1,800,362.00 |
29-FEB-2024 |
4,201,339.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
1214 |
R2 |
28-JAN-2021 |
- |
27-JUL-2023 |
17-NOV-2023 |
Cancellation Proposal sent to head office on Dt:02.02.2024 for approval of Non-Implementation of the project . |
2101 |
41 |
PUTTAPARTHY |
Sri Sathya Sai |
IP GUDIPALLI |
Plot-5 |
58071 |
GROB MACHINE TOOLS INDIA PRIVATE LIMITED |
22-NOV-2018 |
22-NOV-2018 |
28-FEB-2019 |
12-JUL-2019 |
150,103,328.00
|
0.00 |
150,103,328.00 |
150,103,328.00 |
59,400,000.00 |
29-FEB-2024 |
90,703,328.00 |
Sale Agreement(Lease Deed) |
- |
General |
80940 |
G3 |
11-JUL-2021 |
- |
10-JAN-2023 |
19-SEP-2023 |
The Company has commenced the erection of machinery. |
1975 |
42 |
PUTTAPARTHY |
Sri Sathya Sai |
IP GUDIPALLI |
Plot-23,Plot-34 |
61543 |
Saify Ind |
24-FEB-2020 |
24-FEB-2020 |
22-DEC-2020 |
25-FEB-2021 |
26,888,268.00
|
0.00 |
26,888,268.00 |
26,888,268.00 |
26,888,268.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
16188 |
G4 |
24-FEB-2023 |
- |
- |
15-SEP-2023 |
EOT Orders issued upto Dt:23.02.2025 and civil works are under progress - Compound wall constructed. |
1516 |
43 |
PUTTAPARTHY |
Sri Sathya Sai |
IP GUDIPALLI |
Plot-1,Plot-2 |
61718 |
Smile Electronics Limited |
29-APR-2020 |
29-APR-2020 |
06-OCT-2020 |
06-NOV-2020 |
101,772,792.00
|
0.00 |
101,772,792.00 |
101,772,792.00 |
101,952,928.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
61272 |
G4 |
05-NOV-2022 |
- |
- |
15-SEP-2023 |
Modification orders issued for implementation of the project upto Dt:06.03.2024 and civil works are under progress |
1451 |
44 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_Kadiri |
S17C |
4175 |
AP OIL SEEDS GROWERS FEDERATION |
30-APR-1995 |
30-APR-1995 |
02-AUG-1995 |
02-AUG-1995 |
81,724.00
|
- |
- |
81,724.00 |
0.00 |
- |
81,724.00 |
Sale Agreement(Lease Deed) |
- |
Others |
1635 |
R2 |
29-APR-1997 |
- |
- |
20-SEP-2023 |
Final Show Cause Notice issued for Non-Implementation of Project Dt:20.09.2023 |
10582 |
45 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_Kadiri |
F3 |
45430 |
M/s. Sri Rajeswari Plastic Industry |
11-JUN-2014 |
11-JUN-2014 |
02-DEC-2014 |
08-MAY-2015 |
204,385.00
|
- |
- |
204,385.00 |
0.00 |
- |
204,385.00 |
Sale Agreement(Lease Deed) |
- |
SC |
930 |
G2 |
10-JUN-2016 |
- |
- |
07-DEC-2023 |
Notice Issued issued for Non-Implementation of the project on Dt:07.12.2023. |
3600 |
46 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_Kadiri |
F1,F2 |
45432 |
M/s. Simha Plastic Industry |
11-JUN-2014 |
11-JUN-2014 |
13-JAN-2015 |
16-OCT-2015 |
1,753,501.00
|
- |
- |
1,753,501.00 |
0.00 |
- |
1,753,501.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
1860 |
R2 |
15-OCT-2017 |
- |
20-OCT-2018 |
07-DEC-2023 |
Notice issued for Non-Implementation of the project Dt:07.12.2023 |
3600 |
47 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_Kadiri |
E2,E3 |
45410 |
M/s. Lakshmi Narasimha GN Decorticators |
11-JUN-2014 |
11-JUN-2014 |
28-MAY-2016 |
16-JUN-2016 |
2,064,430.00
|
- |
- |
2,064,430.00 |
0.00 |
- |
2,064,430.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
2044 |
R2 |
15-JUN-2018 |
- |
- |
05-DEC-2023 |
Final Reminder- Show cause Notice issued for Non-implementation of the Project Dt:05.12.2023. |
3600 |
48 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_Kadiri |
E4 |
46602 |
M/s. Sri Karthikeya Industries |
30-MAR-2015 |
30-MAR-2015 |
16-JUL-2015 |
16-OCT-2015 |
1,164,989.00
|
- |
- |
1,164,989.00 |
0.00 |
- |
1,164,989.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
1022 |
G4 |
29-MAR-2017 |
- |
18-AUG-2018 |
05-DEC-2023 |
Notice Issued for Non- Implementation of the Project Dt:05.12.2023. |
3308 |
49 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_Kadiri |
E5 |
46603 |
M/s. Sri Venkateswara Readymade Garments |
30-MAR-2015 |
30-MAR-2015 |
16-JUL-2015 |
16-OCT-2015 |
1,164,989.00
|
- |
- |
1,164,989.00 |
0.00 |
- |
1,164,989.00 |
Lease Deed(AR 2020) |
Notice Issued |
SC |
1022 |
G4 |
29-MAR-2017 |
- |
15-SEP-2018 |
05-DEC-2023 |
Notice issued for Non-Implementation of the Project Dt:05.12.2023. |
3308 |
50 |
PUTTAPARTHY |
Sri Sathya Sai |
IP-Tekulodu |
Plot-2 |
59599 |
R.N. PAPER MILLS |
02-AUG-2019 |
02-AUG-2019 |
03-SEP-2019 |
25-JAN-2020 |
12,664,332.00
|
0.00 |
12,664,332.00 |
12,664,332.00 |
13,271,521.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
23068 |
G4 |
24-JAN-2021 |
- |
- |
02-JAN-2024 |
Notice Issued for submission of implementation status of the project and also requested for payment of additional process fee and also for change in legal status and constitution on 02.01.2024. |
1722 |
51 |
PUTTAPARTHY |
Sri Sathya Sai |
IP-Tekulodu |
Plot-3 |
60347 |
Dowell Surgicals Pvt Ltd |
03-OCT-2019 |
03-OCT-2019 |
28-NOV-2019 |
25-JAN-2020 |
11,109,015.00
|
0.00 |
11,109,015.00 |
11,109,015.00 |
11,109,015.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
20235 |
R1 |
24-JAN-2021 |
- |
- |
12-OCT-2021 |
Detailed Report sent to HO stating that the allottee has not complied with APIIC request for alternate land and has submitted non-acceptance letter sent for further instructions in the matter. |
1660 |
52 |
PUTTAPARTHY |
Sri Sathya Sai |
IP-Madakasira |
Land-1 |
61046 |
SIDDI VINAYAK INDUSTRIES |
16-DEC-2019 |
16-DEC-2019 |
12-FEB-2020 |
18-JAN-2021 |
1,456,920.00
|
0.00 |
1,456,920.00 |
1,456,920.00 |
1,456,920.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
20235 |
R1 |
17-JAN-2023 |
- |
- |
18-APR-2024 |
Show Cause Notice - Reminder- issued for Non-Implementation of the Project Dt:18.04.2024. |
1586 |
53 |
PUTTAPARTHY |
Sri Sathya Sai |
IP-Madakasira |
Land-1B |
61127 |
M/s SIDDHESHWAR INDUSTRIES |
01-JAN-2020 |
01-JAN-2020 |
12-FEB-2020 |
18-JAN-2021 |
1,456,920.00
|
0.00 |
1,456,920.00 |
1,456,920.00 |
1,456,920.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
20235 |
R1 |
17-JAN-2023 |
- |
- |
16-APR-2024 |
Show cause notice - Reminder - issued for Non- Implementation of the Project Dt:16.04.2024. |
1570 |
54 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_SADLAPALLI |
PLOT-S3 |
11488 |
KHUSHNOOR INDUSTRIES |
11-AUG-2006 |
11-AUG-2006 |
23-MAR-2007 |
02-APR-2007 |
158,700.00
|
- |
- |
158,700.00 |
0.00 |
- |
158,700.00 |
Sale Agreement(Lease Deed) |
- |
General |
920 |
R2 |
10-AUG-2008 |
- |
- |
06-FEB-2024 |
Notice issued for Non-Implementation of the project & apply for extension of time on Dt:06.02.2024. |
6461 |
55 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_AMMAVARIPALLI |
Plot-17,Plot-18 |
59327 |
Kerry Indev Logistics Private Limited |
07-MAR-2019 |
07-MAR-2019 |
24-JUN-2019 |
24-JUL-2019 |
88,826,352.00
|
0.00 |
88,826,352.00 |
88,826,352.00 |
5,920,946.00 |
29-FEB-2024 |
82,905,400.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
24316 |
G4 |
23-JUL-2021 |
- |
31-DEC-2023 |
30-MAR-2024 |
Eot orders issued upto 31.12.2023 and Final Reminder notice issued for Non- Payment of Penalty of EOT on Dt:30.03.2024. |
1870 |
56 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_AMMAVARIPALLI |
Plot-24,Plot-25 |
63064 |
Jin Myung Tech India Pvt. Ltd. |
10-DEC-2021 |
11-DEC-2021 |
16-DEC-2021 |
11-JAN-2022 |
54,635,448.00
|
0.00 |
54,635,448.00 |
54,635,448.00 |
54,635,448.00 |
29-FEB-2024 |
0.00 |
Lease Deed(AR 2020) |
- |
General |
16150 |
G2 |
10-JAN-2024 |
- |
- |
19-SEP-2023 |
Notice issued for submission of quarterly progress on implementation of project. Detailed Report is forwarded to head office for exemption from purview of Go.Ms.No.151 on Dt:28.06.2023.
|
860 |
57 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_Kappalabanda |
Plot-2,Plot-3,Plot-4 |
57948 |
Diabetic Food International Private Limited |
29-JAN-2019 |
29-JAN-2019 |
09-SEP-2019 |
24-JAN-2019 |
14,994,200.00
|
0.00 |
14,994,200.00 |
14,994,200.00 |
14,994,200.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
- |
Ex-Servicemen |
8216 |
R2 |
23-JAN-2020 |
- |
- |
- |
Report sent to Head office for allotment of alternate plot at Msme-KappalabandaDt:16.08.2022. |
1907 |
58 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_Ms_Indus_Gene_ExpressionLtd |
LAND-1 |
61404 |
M/s. Indusgene Expression Limited |
04-FEB-2020 |
04-FEB-2020 |
07-FEB-2020 |
16-MAY-2020 |
6,679,174.00
|
0.00 |
6,679,174.00 |
6,679,174.00 |
0.00 |
- |
6,679,174.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
78349.92 |
R2 |
15-MAY-2022 |
- |
- |
07-JUL-2022 |
Request for extension of time application is rejected on Dt:05.09.2023 and requested to submit a detailed report regarding implementation of project ,assured employment ,line of activity . |
1536 |
59 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_LEPAKSHI |
PLOT-3 |
9909 |
LEPAKSHI KNOWLEDGE CITY |
28-JAN-2009 |
28-JAN-2009 |
10-FEB-2009 |
10-FEB-2009 |
10,074,954.00
|
- |
- |
10,074,954.00 |
0.00 |
- |
10,074,954.00 |
Sale Deed |
- |
Others |
838740.75 |
R1 |
14-OCT-2011 |
- |
- |
- |
Enforcement Directorate |
5560 |
60 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_LEPAKSHI |
PLOT-4 |
9912 |
LEPAKSHI KNOWLEDGE CITY |
28-JAN-2009 |
28-JAN-2009 |
- |
10-FEB-2009 |
18,963,760.00
|
- |
- |
18,963,760.00 |
0.00 |
- |
18,963,760.00 |
Sale Deed |
- |
Others |
1578734.7 |
R1 |
10-FEB-2011 |
- |
- |
- |
Resumed by Enforcement Directorate |
5560 |
61 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_LEPAKSHI |
PLOT-2 |
9900 |
LEPAKSHI KNOWLEDGE CITY |
28-JAN-2009 |
28-JAN-2009 |
12-FEB-2009 |
10-FEB-2009 |
54,358,568.00
|
- |
- |
54,358,568.00 |
0.00 |
- |
54,358,568.00 |
Sale Deed |
- |
Others |
4525355.4 |
R1 |
14-OCT-2011 |
- |
- |
- |
Enforcement Directorate |
5560 |
62 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_LEPAKSHI |
PLOT-1 |
9892 |
LEPAKSHI KNOWLEDGE CITY |
28-JAN-2009 |
28-JAN-2009 |
12-FEB-2009 |
10-FEB-2009 |
77,266,752.00
|
- |
- |
77,266,752.00 |
0.00 |
- |
77,266,752.00 |
Sale Deed |
- |
Others |
6432463.68 |
R1 |
14-OCT-2011 |
- |
- |
- |
Enforcement Directorate |
5560 |
63 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_LEPAKSHI |
PLOT-5 |
9914 |
LEPAKSHI KNOWLEDGE CITY |
28-JAN-2009 |
28-JAN-2009 |
15-APR-2009 |
10-FEB-2009 |
142,145,504.00
|
- |
- |
142,145,504.00 |
0.00 |
- |
142,145,504.00 |
Sale Deed |
- |
Others |
3287216.22 |
R1 |
14-OCT-2011 |
- |
- |
- |
Enforcement Directorate |
5560 |
64 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_LEPAKSHI |
PLOT-7 |
9928 |
LEPAKSHI KNOWLEDGE CITY |
28-APR-2009 |
28-APR-2009 |
28-APR-2009 |
28-APR-2009 |
13,686,867.00
|
- |
- |
13,686,867.00 |
0.00 |
- |
13,686,867.00 |
Sale Deed |
- |
Others |
1139432.85 |
R1 |
10-FEB-2011 |
- |
- |
- |
Enforcement Directorate |
5470 |
65 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_LEPAKSHI |
PLOT-6 |
9921 |
LEPAKSHI KNOWLEDGE CITY |
28-APR-2009 |
28-APR-2009 |
28-APR-2009 |
28-APR-2009 |
68,659,416.00
|
- |
- |
68,659,416.00 |
0.00 |
- |
68,659,416.00 |
Sale Agreement(Lease Deed) |
- |
Others |
5715901.86 |
R1 |
10-FEB-2011 |
- |
- |
- |
Enforcement Directorate |
5470 |
66 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_LEPAKSHI |
PLOT-12 |
9943 |
LEPAKSHI KNOWLEDGE CITY |
14-OCT-2009 |
14-OCT-2009 |
15-OCT-2009 |
14-OCT-2009 |
878,500.00
|
- |
- |
878,500.00 |
0.00 |
- |
878,500.00 |
Sale Deed |
- |
Others |
71105.79 |
R1 |
14-OCT-2011 |
- |
- |
- |
Enforcement Directorate |
5301 |
67 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_LEPAKSHI |
PLOT-14 |
9948 |
LEPAKSHI KNOWLEDGE HUB |
14-OCT-2009 |
14-OCT-2009 |
15-OCT-2019 |
14-OCT-2009 |
7,797,455.00
|
- |
- |
7,797,455.00 |
0.00 |
- |
7,797,455.00 |
Sale Deed |
- |
Others |
649138.8 |
R1 |
10-FEB-2011 |
- |
- |
- |
Enforcement Directorate |
5301 |
68 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_LEPAKSHI |
PLOT-11 |
9940 |
LEPAKSHI KNOWLEDGE CITY |
14-OCT-2009 |
14-OCT-2009 |
15-OCT-2019 |
14-OCT-2009 |
8,790,124.00
|
- |
- |
8,790,124.00 |
0.00 |
- |
8,790,124.00 |
Sale Deed |
- |
Others |
731778.54 |
R1 |
10-FEB-2011 |
- |
- |
- |
Enforcement Directorate |
5301 |
69 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_LEPAKSHI |
PLOT-16 |
9955 |
LEPAKSHI KNOWLEDGE CITY |
14-OCT-2009 |
14-OCT-2009 |
15-OCT-2009 |
14-OCT-2009 |
9,186,316.00
|
- |
- |
9,186,316.00 |
0.00 |
- |
9,186,316.00 |
Sale Deed |
- |
Others |
764761.59 |
R1 |
28-APR-2011 |
- |
- |
- |
Enforcement Directorate |
5301 |
70 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_LEPAKSHI |
PLOT-10 |
9937 |
LEPAKSHI KNOWLEDGE CITY |
14-OCT-2009 |
14-OCT-2009 |
15-OCT-2009 |
14-OCT-2009 |
14,912,390.00
|
- |
- |
14,912,390.00 |
0.00 |
- |
14,912,390.00 |
Sale Deed |
- |
Others |
1241457.72 |
R1 |
14-OCT-2011 |
- |
- |
- |
Enforcement Directorate |
5301 |
71 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_LEPAKSHI |
PLOT-15 |
9952 |
LEPAKSHI KNOWLEDGE CITY |
14-OCT-2009 |
14-OCT-2009 |
15-OCT-2009 |
14-OCT-2009 |
18,649,238.00
|
- |
- |
18,649,238.00 |
0.00 |
- |
18,649,238.00 |
Sale Deed |
- |
Others |
1552550.61 |
R1 |
14-OCT-2011 |
- |
- |
- |
Enforcement Directorate |
5301 |
72 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_LEPAKSHI |
PLOT-9 |
9933 |
LEPAKSHI KNOWLEDGE CITY |
14-OCT-2009 |
14-OCT-2009 |
15-OCT-2009 |
14-OCT-2009 |
21,035,628.00
|
- |
- |
21,035,628.00 |
0.00 |
- |
21,035,628.00 |
Sale Deed |
- |
Others |
1751217.84 |
R1 |
14-OCT-2011 |
- |
- |
- |
Enforcement Directorate |
5301 |
73 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_LEPAKSHI |
PLOT-13 |
9945 |
LEPAKSHI KNOWLEDGE CITY |
14-OCT-2009 |
14-OCT-2009 |
15-OCT-2019 |
14-OCT-2009 |
30,682,792.00
|
- |
- |
30,682,792.00 |
0.00 |
- |
30,682,792.00 |
Sale Deed |
- |
Others |
2554344.99 |
R1 |
28-APR-2011 |
- |
- |
- |
Enforcement Directorate |
5301 |
74 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_LEPAKSHI |
PLOT-8 |
9932 |
LEPAKSHI KNOWLEDGE CITY |
14-OCT-2009 |
14-OCT-2009 |
14-OCT-2009 |
14-OCT-2009 |
36,539,500.00
|
- |
- |
36,539,500.00 |
0.00 |
- |
36,539,500.00 |
Sale Deed |
- |
Others |
2957507.13 |
R1 |
14-OCT-2011 |
- |
- |
- |
Enforcement Directorate |
5301 |
75 |
PUTTAPARTHY |
Sri Sathya Sai |
M/s. M B Smelters Pvt Ltd |
PLOT-1 |
61685 |
M/s. M B Smelters Pvt Ltd |
20-MAR-2020 |
20-MAR-2020 |
02-JUL-2020 |
21-SEP-2020 |
23,067,900.00
|
0.00 |
23,067,900.00 |
23,067,900.00 |
0.00 |
- |
23,067,900.00 |
Sale Agreement(Lease Deed) |
- |
General |
202350 |
G4 |
20-SEP-2022 |
- |
20-SEP-2023 |
- |
Sale Agreement was executed and EOT Sanctioned and Implementation due date upto 20.09.2023 |
1491 |
76 |
PUTTAPARTHY |
Sri Sathya Sai |
M/s. NACEN |
Land 1 |
49781 |
M/s. NACEN |
03-MAR-2015 |
03-MAR-2015 |
31-MAR-2015 |
27-FEB-2016 |
100,169,440.00
|
- |
- |
100,169,440.00 |
0.00 |
- |
100,169,440.00 |
Sale Deed |
- |
General |
2024876 |
G4 |
26-FEB-2018 |
- |
- |
06-MAY-2021 |
The company has commenced Civil works and implementation of the project is under Progress |
3335 |
77 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
17 |
59245 |
M/s SRI BHARGAV SAI GARMENTS |
02-MAR-2019 |
02-MAR-2019 |
11-JUL-2019 |
20-MAR-2020 |
209,100.00
|
104,550.00 |
104,550.00 |
104,550.00 |
130,688.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
375 |
R2 |
19-MAR-2022 |
- |
- |
06-JAN-2024 |
Final Show Cause Notice Issued for Non-Implementation of Project Dt:06.01.2024 and also requested the allottee to apply EOT through SDP portal through mail Dt:12.02.2024. |
1875 |
78 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
20 |
59125 |
S V INDUSTRIES |
02-MAR-2019 |
02-MAR-2019 |
17-AUG-2020 |
15-FEB-2022 |
261,375.00
|
130,687.00 |
130,688.00 |
130,688.00 |
130,688.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
- |
BC |
375 |
R2 |
14-FEB-2024 |
- |
- |
08-JAN-2024 |
Final Show Cause Notice Issued for Non- Implementation of Project Dt:08.01.2024 and the allottee has applied EOT through SDP Portal. |
1875 |
79 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
108 |
59314 |
Sri Jaiguru Crane Services |
02-MAR-2019 |
02-MAR-2019 |
30-APR-2019 |
19-MAR-2020 |
565,267.00
|
0.00 |
565,267.00 |
565,267.00 |
565,267.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
811 |
G2 |
18-MAR-2021 |
- |
- |
08-JAN-2024 |
The company has gone into production and first sale invoice yet to be submitted by Allottee. |
1875 |
80 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
90,91 |
59931 |
M/s VISWAKSENA INDUSTRY |
30-AUG-2019 |
30-AUG-2019 |
22-NOV-2019 |
19-MAR-2020 |
418,200.00
|
209,100.00 |
209,100.00 |
209,100.00 |
209,100.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
SC |
600 |
R2 |
18-SEP-2022 |
- |
- |
05-DEC-2023 |
Final Show Cause Notice Issued for Non-Implementation of the Project Dt:05.12.2023and requested the allottte to apply for EoT through mail Dt:12.02.2024. |
1694 |
81 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
61,62 |
60187 |
M/s. Sri Hanuman Bricks |
30-AUG-2019 |
30-AUG-2019 |
24-FEB-2020 |
12-AUG-2020 |
418,200.00
|
209,100.00 |
209,100.00 |
209,100.00 |
209,100.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
- |
SC |
600 |
R2 |
11-FEB-2022 |
- |
- |
06-JAN-2024 |
Final Show Cause Notice Issued for Non-Implementation of Project Dt:06.01.2024 and also requested the allottee to apply EOT through SDP Portal through mail Dt:12.02.2024. |
1694 |
82 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
74,75,88,89 |
60088 |
M/s BLC ENGINEERING WORKS |
03-SEP-2019 |
03-SEP-2019 |
15-FEB-2020 |
12-JUN-2020 |
836,400.00
|
418,200.00 |
418,200.00 |
418,200.00 |
418,200.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
NA |
BC |
1200 |
G4 |
11-JUN-2021 |
- |
31-MAR-2024 |
02-MAR-2024 |
Eot granted upto Dt:31.03.2024 and Notice issued for submission of status of implementation on 02.03.2024. |
1690 |
83 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
174,175 |
60140 |
M/S Smartway Aluminium solutions |
03-SEP-2019 |
03-SEP-2019 |
22-NOV-2019 |
11-FEB-2020 |
1,923,720.00
|
961,860.00 |
961,860.00 |
961,860.00 |
961,860.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
BC |
2760 |
R2 |
10-AUG-2021 |
- |
- |
06-APR-2024 |
Final Show Cause Notice & Final Reminder Issued on 06.04.2024 for Non-Implementation of the Project . |
1690 |
84 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
49,50,51 |
60724 |
Viswanath Cement Bricks |
15-NOV-2019 |
15-NOV-2019 |
17-AUG-2020 |
05-FEB-2021 |
627,300.00
|
0.00 |
627,300.00 |
627,300.00 |
313,660.00 |
29-FEB-2024 |
313,640.00 |
Sale Agreement(Lease Deed) |
- |
Others |
900 |
G2 |
04-FEB-2023 |
- |
- |
08-SEP-2023 |
The company has gone into production and the first sale invoice has not yet submitted document. |
1617 |
85 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
23 |
60733 |
M/s. M.S. Industries |
15-NOV-2019 |
15-NOV-2019 |
07-APR-2020 |
12-AUG-2020 |
947,920.00
|
0.00 |
947,920.00 |
947,920.00 |
473,960.00 |
29-FEB-2024 |
473,960.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
Others |
1360 |
G2 |
11-FEB-2021 |
- |
- |
07-DEC-2023 |
The allottee has erected the machinery and the company has yet to submit the documents. |
1617 |
86 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
107 |
60736 |
venus labs |
15-NOV-2019 |
15-NOV-2019 |
23-JUN-2020 |
23-FEB-2021 |
701,182.00
|
0.00 |
701,182.00 |
701,182.00 |
771,300.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
- |
General |
1006 |
G3 |
22-FEB-2023 |
- |
- |
04-APR-2024 |
Notice issued for submission of status of implementation of project on 04.04.2024. |
1617 |
87 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
188,189 |
60920 |
NEEDEE RINSE |
02-DEC-2019 |
02-DEC-2019 |
07-APR-2020 |
04-FEB-2021 |
460,020.00
|
0.00 |
460,020.00 |
460,020.00 |
479,160.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
- |
Others |
660 |
R2 |
03-FEB-2023 |
- |
- |
16-FEB-2024 |
Final show cause notice issued on 16.02.2024 for Non-Implementation of the project. |
1600 |
88 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
106 |
61022 |
venus laboratories |
10-DEC-2019 |
10-DEC-2019 |
05-MAR-2020 |
23-FEB-2021 |
871,926.00
|
0.00 |
871,926.00 |
871,926.00 |
871,926.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
- |
General |
1201 |
G4 |
22-FEB-2023 |
- |
- |
04-APR-2024 |
Notice issued for submission of status of implementation of project on 04.04.2024. |
1592 |
89 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
10,7,8,9 |
61023 |
surya aromatics |
10-DEC-2019 |
10-DEC-2019 |
05-MAR-2020 |
23-FEB-2021 |
1,406,262.00
|
0.00 |
1,406,262.00 |
1,406,262.00 |
1,406,262.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
- |
General |
1937 |
G3 |
22-FEB-2023 |
- |
- |
07-DEC-2023 |
The company has erected the machinery and the commericial production yet to be start by the company . |
1592 |
90 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
200,201 |
61720 |
SRIVEN BIOFUELS |
29-APR-2020 |
29-APR-2020 |
23-DEC-2020 |
25-JUN-2021 |
1,926,804.00
|
963,402.00 |
963,402.00 |
963,402.00 |
1,926,804.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
- |
General |
2654 |
R2 |
24-JUN-2023 |
- |
- |
23-FEB-2024 |
Final Show-cause Notice issued on 23.02.2024 for Non-Implementation of the project . |
1451 |
91 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
22 |
63073 |
JCMARVEL ENGINEERING AND TRADING LLP |
10-DEC-2021 |
11-DEC-2021 |
16-DEC-2021 |
20-DEC-2021 |
1,757,120.00
|
0.00 |
1,757,120.00 |
1,757,120.00 |
1,757,120.00 |
29-FEB-2024 |
0.00 |
Lease Deed(AR 2020) |
- |
General |
1360 |
G3 |
19-DEC-2023 |
- |
- |
19-SEP-2023 |
The company has erected manchinery and the company has yet to start the commericial production and amendment orders issued on 19.02.2024 from lease deed to ORS as per Go Ms No.117 Dt:09.11.2023. |
860 |