S.No  |  DISTRICT  |  ZONE  |  INDUSTRIAL PARK  |  PLOT NO  |  ALLOTMENT NUMBER  |  NAME OF THE INDUSTRY  |  ALLOTMENT DATE  |  PROVISIONAL ALLOTMENT DATE  |  FINAL ALLOTMENT DATE  |  DATE OF PHYSICAL POSSESSION  |  ALLOTMENT VALUE  |  REBATE AMOUNT  |  NET ALLOTMENT VALUE  |  ADVANCE TO BE PAID  |  AMOUNT RECEIVED  |  LAST PAID DATE  |  BALANCE ADVANCE AMOUNT  |  STATUS OF ALLOTMENT  |  CANCELLATION  |  CATEGORY OF ALLOTMENT  |  EXTENT IN SQM  |  IMPLEMENTATION STATUS CODE NEW  |  IMPLEMENTATION DUE DATE  |  DCP DATE  |  EOT PERIOD  |  NOTICE ISSUED DATE  |  IMPL ZM REMARKS  |  ALLOTMENT AGE IN DAYS  |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
SRIKAKULAM |
Srikakulam |
APIE_ AMUDALAVALASA |
12A |
60573 |
M/S SOWMYA CANTEEN |
04-NOV-2019 |
04-NOV-2019 |
28-JAN-2020 |
30-JAN-2020 |
816,867.00
|
408,434.00 |
408,433.00 |
408,433.00 |
1,226,485.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
BC |
323 |
G2 |
29-JAN-2022 |
- |
28-JAN-2023 |
16-NOV-2020 |
EOT Sanctioned upto 28.1.2022 |
1634 |
2 |
SRIKAKULAM |
Srikakulam |
APIE_ AMUDALAVALASA |
4A |
60572 |
Ambica Enterprises |
04-NOV-2019 |
04-NOV-2019 |
14-NOV-2019 |
01-OCT-2020 |
3,459,672.00
|
0.00 |
3,459,672.00 |
3,459,672.00 |
3,459,672.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
1368 |
G2 |
01-OCT-2021 |
- |
- |
05-JUL-2022 |
The Unit is Working and requested the allottee to submit necessary documents to process sale deed |
1634 |
3 |
SRIKAKULAM |
Srikakulam |
APIE_ AMUDALAVALASA |
13A |
60574 |
M/S THANU FLOOR MILL |
04-NOV-2019 |
04-NOV-2019 |
31-DEC-2019 |
30-JAN-2020 |
905,382.00
|
452,691.00 |
452,691.00 |
452,691.00 |
458,691.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
- |
BC |
358 |
G2 |
29-JAN-2022 |
- |
30-AUG-2022 |
16-NOV-2020 |
Construciton of unit is completed and EOT Considered upto 30-Aug-2022 |
1634 |
4 |
SRIKAKULAM |
Srikakulam |
IP_PALASA |
Pl-80 |
13804 |
SRI VENKATESWARA MODERN RICE MILL |
31-JAN-2004 |
31-JAN-2004 |
09-JUN-2005 |
29-APR-2006 |
24,420.00
|
- |
- |
24,420.00 |
24,420.00 |
- |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
489 |
R2 |
28-APR-2008 |
- |
- |
20-JUL-2022 |
Notice issued on 21.07.2022 and land dispute with adjacent land owner and report was submitted to Head office on 23.11.2022 and orders are awaited |
7390 |
5 |
SRIKAKULAM |
Srikakulam |
IP_PALASA |
Pl-77 |
13802 |
SRI VEKATESWARA MODERN RICE MILL |
31-JAN-2004 |
31-JAN-2004 |
09-JUN-2005 |
29-APR-2006 |
24,450.00
|
- |
- |
24,450.00 |
24,420.00 |
- |
30.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
489 |
R2 |
28-APR-2008 |
- |
- |
22-JUN-2018 |
Notice issued on 21.07.2022 and land dispute with adjacent land owner and report was submitted to Head office on 23.11.2022 and orders are awaited |
7390 |
6 |
SRIKAKULAM |
Srikakulam |
IP_PALASA |
Pl-76 |
13801 |
SRI VENKESWARA MODERN RICE MILL |
31-JAN-2004 |
31-JAN-2004 |
09-JUN-2005 |
29-APR-2006 |
37,500.00
|
- |
- |
37,500.00 |
37,500.00 |
- |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
750 |
R2 |
28-APR-2008 |
- |
- |
22-JUN-2018 |
Notice issued on 21.07.2022 and land dispute with adjacent land owner and report was submitted to Head office on 23.11.2022 and orders are awaited |
7390 |
7 |
SRIKAKULAM |
Srikakulam |
IP_PALASA |
Pl-79 |
13803 |
SRI VENKATESWARA MORDEN RICE MILL |
31-JAN-2004 |
31-JAN-2004 |
09-JUN-2005 |
29-APR-2006 |
37,500.00
|
- |
- |
37,500.00 |
37,500.00 |
- |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
750 |
R2 |
28-APR-2008 |
- |
- |
20-JUL-2022 |
Notice issued on 21.07.2022 and land dispute with adjacent land owner and report was submitted to Head office on 23.11.2022 and orders are awaited |
7390 |
8 |
SRIKAKULAM |
Srikakulam |
IP PYIDIBHIMAVARAM |
SPL-3 |
42109 |
ESI Corporation, New Delhi |
04-OCT-2012 |
04-OCT-2012 |
11-MAY-2016 |
11-JAN-2017 |
3,823,680.00
|
840,400.00 |
2,983,280.00 |
2,983,280.00 |
3,173,080.00 |
- |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
Others |
2276 |
G2 |
10-JAN-2020 |
- |
31-DEC-2021 |
20-JUL-2022 |
EOT sanctioned up to 30.7.2021and
The Unit is Working and requested the allottee to submit necessary documents to process sale deed |
4221 |
9 |
SRIKAKULAM |
Srikakulam |
IP_SRIKAKULAM |
CFC-2 |
50159 |
M/s. APSFC |
30-AUG-2016 |
30-AUG-2016 |
05-NOV-2016 |
24-JAN-2017 |
4,043,250.00
|
- |
- |
4,043,250.00 |
0.00 |
- |
4,043,250.00 |
Sale Agreement(Lease Deed) |
- |
General |
1348 |
G4 |
23-JAN-2019 |
- |
30-APR-2023 |
- |
EOT Sanctiioned upto 30.4.23.and Civil Works is in progress |
2795 |
10 |
SRIKAKULAM |
Srikakulam |
IP_CHITTIVALASA |
Bit -I,Bit-II |
59822 |
LANTECH PHARMACEUTICALS LTD |
09-AUG-2019 |
09-AUG-2019 |
30-JUN-2021 |
17-AUG-2021 |
22,809,200.00
|
0.00 |
22,809,200.00 |
22,809,200.00 |
31,810,190.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
57023 |
R2 |
16-AUG-2023 |
- |
- |
31-MAR-2023 |
Possession handedover on 17.08.2021 and Notice issued on 31.3.2023 for Non Implementation of the Unit |
1721 |
11 |
SRIKAKULAM |
Srikakulam |
IP_CHITTIVALASA |
Bit-III |
59825 |
M/s. TOPSTONE METALS AND ALLOYS INDIA PRIVATE LIMITED |
09-AUG-2019 |
09-AUG-2019 |
20-NOV-2020 |
23-DEC-2020 |
17,402,400.00
|
2,000,000.00 |
15,402,400.00 |
15,402,400.00 |
6,101,000.00 |
29-FEB-2024 |
9,301,400.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
43506 |
R2 |
22-DEC-2022 |
- |
- |
31-MAR-2023 |
Possession handedover on 23.12.2020 and Notice issued on 31.3.2023 due to Non Implementation of the Unit |
1721 |
12 |
SRIKAKULAM |
Srikakulam |
IP_SANCHAM |
UDL |
55555 |
Aizant Pharmaceuticals Pvt Ltd |
20-MAR-2018 |
20-MAR-2018 |
30-MAY-2018 |
13-JUN-2019 |
23,709,048.00
|
0.00 |
23,709,048.00 |
23,709,048.00 |
23,709,048.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
- |
Technocrat |
69528 |
G4 |
13-JUN-2023 |
- |
13-JUN-2023 |
26-FEB-2021 |
Land in Possession of the Company and EOT sanctioned upto 13.6.2023 and Civil Works under process |
2228 |
13 |
SRIKAKULAM |
Srikakulam |
IP_SOMPET_LAO_NCCL |
LA-01 |
9857 |
NCC POWER PROJECTS LIMITED |
29-MAY-2009 |
29-MAY-2009 |
29-MAY-2009 |
08-JUN-2009 |
99,199,208.00
|
- |
- |
99,199,208.00 |
99,199,208.00 |
- |
0.00 |
Sale Deed (NOC) |
Court Case |
General |
3936477 |
R1 |
29-MAY-2011 |
- |
- |
- |
The land was allotted to the Company on 28.5.2009 at Rs. 1.02 Lakhs per Acre. The Company paid the total land cost to APIIC. Hence the Possession was handed over to the Company on 29.05.2009 and Sale deed was executed on 06.06.2009. . Due to agitations from the local people the Company has not started construction |
5445 |
14 |
SRIKAKULAM |
Srikakulam |
IP_SANTABOMMALI |
Land1 |
25973 |
EAST COAST ENERGY PVT.LTD |
02-MAY-2009 |
02-MAY-2009 |
29-SEP-2008 |
04-MAY-2008 |
222,006,944.00
|
- |
- |
222,006,944.00 |
222,006,944.00 |
- |
0.00 |
Sale Deed (NOC) |
NA |
General |
8339855 |
G3 |
05-APR-2014 |
- |
- |
- |
The land was allotted to the Company on 29.8.2008 at Rs. 1.07 Lakhs per Acre. The Company paid the total land cost to APIIC. Hence, the possession of the land was handed over to the Company on 2.5.2009 and sale deed was executed on 2.5.2009. Due to agitations from the local people and financial issues the Company has stopped construction |
5472 |
15 |
SRIKAKULAM |
Srikakulam |
IP_BOYAPALEM_VLL |
LAND-BPLM,LAND-CHVA,LAND-NRVA |
41997 |
VIVIMED LABS LTD |
05-SEP-2012 |
05-SEP-2012 |
28-SEP-2012 |
04-OCT-2012 |
14,685,339.00
|
- |
- |
14,685,339.00 |
14,685,339.00 |
- |
0.00 |
Sale Deed (NOC) |
Notice Issued |
General |
238449 |
R1 |
03-OCT-2014 |
- |
11-AUG-2021 |
14-JUN-2022 |
NOC issued to M/s Indusland Bank Limited, and Sale Deed execute and Show casue Notice issued on 14.6.2022e |
4250 |
16 |
SRIKAKULAM |
Vizianagaram |
GROWTH CENTRE BOBBILI |
268 |
28953 |
JAI MATA PLASTICS |
27-DEC-2006 |
27-DEC-2006 |
22-SEP-2007 |
15-FEB-2008 |
151,250.00
|
- |
- |
151,250.00 |
151,250.00 |
- |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
Others |
1513 |
G4 |
14-FEB-2010 |
- |
31-JAN-2014 |
25-JUL-2022 |
1st EOT granted upto 30-jan-2014 and Shed Constructed and Notice Issued on 25-jul-2022 for Non Implementation of the Unit |
6329 |
17 |
SRIKAKULAM |
Vizianagaram |
GROWTH CENTRE BOBBILI |
236,237,238,239,240,241,242,243,250,251,252,295,296,297,298,299,300,304,305,311,312,313,314,315,316,321,322,323,324 |
32837 |
STEEL EXCHANGE INDIA LTD. |
06-AUG-2007 |
06-AUG-2007 |
06-NOV-2007 |
13-DEC-2007 |
32,375,996.00
|
- |
- |
32,375,996.00 |
32,375,996.00 |
- |
0.00 |
Sale Agreement(Lease Deed) |
Court Case |
Others |
323785 |
G4 |
12-DEC-2009 |
- |
01-MAR-2020 |
27-DEC-2012 |
WP No : 8055/2019 filed by the company in Hon'ble High court for issuing show cause notice for non payment of EOT Fee is is pending. |
6107 |
18 |
SRIKAKULAM |
Vizianagaram |
GROWTH CENTRE BOBBILI |
1_A |
28609 |
CARBON RESOURCES PVT. LTD. |
05-NOV-2007 |
05-NOV-2007 |
23-FEB-2008 |
01-MAR-2008 |
4,046,760.00
|
- |
- |
4,046,760.00 |
4,046,760.00 |
- |
0.00 |
Sale Agreement(Lease Deed) |
- |
Others |
20234 |
G4 |
28-FEB-2010 |
- |
30-APR-2017 |
22-JAN-2013 |
1st EOT sanctioned upto 30.4.2007 and Constructed Security Room, Interal Roads, Workers Rest Rooms and 2nd EOT proposal submitted to Head Office on 31.3.2022
|
6016 |
19 |
SRIKAKULAM |
Vizianagaram |
GROWTH CENTRE BOBBILI |
290,291,292,293,294,306,307,308,309,310,325,326,327,328,329,330,331,332,333,334,335,336,337,338,339,340,341,342,343,344,345,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360,361,362,363 |
32845 |
MANGANESE ORE (INDIA) LTD. |
20-NOV-2007 |
20-NOV-2007 |
14-MAR-2008 |
19-MAR-2008 |
81,718,608.00
|
- |
- |
81,718,608.00 |
91,718,608.00 |
- |
0.00 |
Sale Deed (NOC) |
- |
Others |
454032 |
R1 |
15-JAN-2010 |
- |
- |
- |
Requested for alternative land at Appikonda, Visakahapatnam. Report submitted to HO on 23.4.2021 |
6001 |
20 |
SRIKAKULAM |
Vizianagaram |
GROWTH CENTRE BOBBILI |
257_A2 |
44679 |
M/s.S.R.Lee Leather Industry |
09-APR-2013 |
09-APR-2013 |
11-OCT-2013 |
02-MAY-2014 |
1,800,960.00
|
- |
- |
1,800,960.00 |
1,800,960.00 |
- |
0.00 |
Sale Deed (NOC) |
- |
General |
4020 |
G4 |
01-MAY-2016 |
- |
30-JUN-2022 |
27-JUL-2018 |
EOT sanctioned up to 30-jun-2022 and under Construction and NOC issued to APSFC and Saledeed executed and handedover to APSFC |
4034 |
21 |
SRIKAKULAM |
Vizianagaram |
GROWTH CENTRE BOBBILI |
46 |
61891 |
M/s. SRI MARKANDEYA POWER LOOM INDUSTRIES |
20-MAY-2020 |
20-MAY-2020 |
03-JUN-2020 |
05-JUN-2020 |
1,788,000.00
|
894,000.00 |
894,000.00 |
894,000.00 |
894,320.00 |
29-FEB-2024 |
0.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
BC |
1500 |
G4 |
04-JUN-2021 |
- |
- |
16-APR-2022 |
Shed construction Completed. and Show casue notice issued on 16.4.2022 for Non Implementation of the Unit and requsted to submit timelines for EOT. |
1436 |
22 |
SRIKAKULAM |
Vizianagaram |
GROWTH CENTRE BOBBILI |
281_C |
62146 |
Uma Maheswara Fabrication Works |
16-DEC-2020 |
16-DEC-2020 |
09-AUG-2021 |
07-OCT-2021 |
1,096,640.00
|
0.00 |
1,096,640.00 |
1,096,640.00 |
109,664.00 |
29-FEB-2024 |
986,976.00 |
Lease Deed(AR 2020) |
- |
General |
920 |
G4 |
06-OCT-2023 |
- |
- |
- |
Civil Works Under process |
1226 |
23 |
SRIKAKULAM |
Vizianagaram |
GROWTH CENTRE BOBBILI |
98 |
62762 |
M/s Om Sri Sai Industries |
20-MAY-2021 |
20-MAY-2021 |
22-DEC-2021 |
09-FEB-2022 |
2,323,509.00
|
1,161,754.00 |
1,161,755.00 |
1,161,755.00 |
232,351.00 |
29-FEB-2024 |
929,404.00 |
Lease Deed(AR 2020) |
Notice Issued |
BC,Women |
1571 |
R2 |
08-FEB-2024 |
- |
- |
13-DEC-2022 |
Lease Deed executed on 31.1.2022 and possession handedover on 9.2.2022 and approvals to be obtained from competent Authorities and Notice issued on 13.12.2022 due to non iplementation of the Unit |
1071 |
24 |
SRIKAKULAM |
Vizianagaram |
IP_KANTAKAPALLI |
LAND3B |
46200 |
M/s. Seva Industries |
04-JUN-2014 |
04-JUN-2014 |
05-SEP-2014 |
29-JUL-2021 |
8,235,645.00
|
- |
- |
8,235,645.00 |
0.00 |
- |
8,235,645.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
Women-General |
29948 |
R2 |
28-JUL-2022 |
- |
- |
31-MAY-2022 |
Notice Issued on 31.5.2022 due to Non Implementation of the Unit and approvals to be obtained from competent Authorities |
3613 |
25 |
SRIKAKULAM |
Vizianagaram |
IP-MARUPALLI |
IP-MARUPALLI2 |
52500 |
Yelamanchili Dairy Ltd |
18-MAY-2017 |
18-MAY-2017 |
29-SEP-2017 |
04-OCT-2017 |
18,778,080.00
|
0.00 |
18,778,080.00 |
18,778,080.00 |
0.00 |
- |
18,778,080.00 |
Sale Deed (NOC) |
Court Case |
General |
161880 |
G4 |
03-OCT-2019 |
- |
- |
- |
Under Constrcutions and Sale Deed executed. Allottee filed WP in Hon'ble High court for not updating their name in revenue records is pending. |
2534 |
26 |
SRIKAKULAM |
Vizianagaram |
IP-MARUPALLI |
IP-MARUPALLI |
52980 |
Sri Chandana Food Park Ltd |
18-JUL-2017 |
18-JUL-2017 |
05-OCT-2017 |
14-OCT-2017 |
18,778,080.00
|
0.00 |
18,778,080.00 |
18,778,080.00 |
0.00 |
- |
18,778,080.00 |
Sale Deed (NOC) |
Court Case |
Technocrat |
161880 |
G4 |
13-OCT-2020 |
- |
- |
- |
Under Constrcutions and Sale Deed executed. Allottee filed WP No: /2022 in Hon'ble High court for not updating their name in revenue records is pending. |
2473 |