S.No  |  DISTRICT  |  ZONE  |  INDUSTRIAL PARK  |  PLOT NO  |  ALLOTMENT NUMBER  |  NAME OF THE INDUSTRY  |  ALLOTMENT DATE  |  PROVISIONAL ALLOTMENT DATE  |  FINAL ALLOTMENT DATE  |  DATE OF PHYSICAL POSSESSION  |  ALLOTMENT VALUE  |  REBATE AMOUNT  |  NET ALLOTMENT VALUE  |  ADVANCE TO BE PAID  |  AMOUNT RECEIVED  |  LAST PAID DATE  |  BALANCE ADVANCE AMOUNT  |  STATUS OF ALLOTMENT  |  CANCELLATION  |  CATEGORY OF ALLOTMENT  |  EXTENT IN SQM  |  IMPLEMENTATION STATUS CODE NEW  |  IMPLEMENTATION DUE DATE  |  DCP DATE  |  EOT PERIOD  |  NOTICE ISSUED DATE  |  IMPL ZM REMARKS  |  ALLOTMENT AGE IN DAYS  |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
12 |
59504 |
M/s.Jai Govinda Ghar Nirman Limited |
02-NOV-2018 |
02-NOV-2018 |
20-MAY-2019 |
29-AUG-2019 |
86,177,696.00
|
0.00 |
86,177,696.00 |
86,177,696.00 |
8,617,770.00 |
29-FEB-2024 |
77,559,928.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
41037 |
R2 |
28-AUG-2023 |
- |
31-MAY-2027 |
14-NOV-2022 |
EOT orders considered upto 31.05.2027. |
2002 |
2 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
Plot.No.1 to 5,Plot.No.6to11&48to52 |
61107 |
M/s. Wingtech Mobile Communications (India) (P) Ltd |
24-DEC-2019 |
24-DEC-2019 |
18-SEP-2020 |
28-SEP-2020 |
288,336,608.00
|
0.00 |
288,336,608.00 |
288,336,608.00 |
28,833,660.00 |
29-FEB-2024 |
259,502,944.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
303526 |
G4 |
27-SEP-2026 |
- |
- |
01-NOV-2022 |
Civil works under progress and due date is 27.09.2026.Notice issued on 01.11.2022 |
1585 |
3 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
67,68,69/A |
62113 |
INNO TECHSYS PRIVATE LIMTED |
16-DEC-2020 |
16-DEC-2020 |
26-MAY-2021 |
22-OCT-2021 |
29,900,856.00
|
0.00 |
29,900,856.00 |
29,900,856.00 |
3,025,225.00 |
29-FEB-2024 |
26,875,630.00 |
Lease Deed(AR 2020) |
Notice Issued |
Women |
22827 |
R2 |
21-OCT-2024 |
- |
- |
10-APR-2023 |
Lease Deed executed on 12.08.2021. Notice issued on 10.04.2023. |
1227 |
4 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
14A |
62183 |
Clair Electro Industries Private Limited |
16-DEC-2020 |
16-DEC-2020 |
08-JUN-2021 |
03-AUG-2021 |
15,895,540.00
|
0.00 |
15,895,540.00 |
15,895,540.00 |
3,231,229.00 |
29-FEB-2024 |
12,664,311.00 |
Lease Deed(AR 2020) |
Notice Issued |
General |
12134 |
R2 |
02-AUG-2024 |
- |
- |
03-NOV-2022 |
Vide letter dt:03.11.2022, the allottee has been requested to submit the present status of the unit |
1227 |
5 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
Plot-71,Plot-72 |
62673 |
BHARGAVI GLOBAL PROJECTS |
31-MAR-2021 |
31-MAR-2021 |
22-NOV-2021 |
10-JAN-2022 |
35,645,976.00
|
0.00 |
35,645,976.00 |
17,822,988.00 |
3,564,598.00 |
29-FEB-2024 |
14,258,390.00 |
Lease Deed(AR 2020) |
Notice Issued |
General |
24282 |
R2 |
09-JAN-2025 |
- |
- |
10-APR-2023 |
Notice Issued on 10-apr-2023. |
1122 |
6 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
Plot-75 |
62680 |
3STAR SWITCHGEARS |
31-MAR-2021 |
31-MAR-2021 |
30-JUL-2021 |
27-SEP-2021 |
8,912,228.00
|
0.00 |
8,912,228.00 |
8,912,228.00 |
891,223.00 |
29-FEB-2024 |
8,021,005.00 |
Lease Deed(AR 2020) |
Notice Issued |
General |
6071 |
G3 |
26-SEP-2024 |
- |
- |
10-MAY-2022 |
Civil works completed and machinery yet to be erected. |
1122 |
7 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
28,29 |
62679 |
M/s. Dixon Technologies India Limited |
31-MAR-2021 |
31-MAR-2021 |
28-JUN-2021 |
17-FEB-2022 |
51,547,352.00
|
0.00 |
51,547,352.00 |
51,547,352.00 |
5,154,735.00 |
29-FEB-2024 |
46,392,616.00 |
Lease Deed(AR 2020) |
Notice Issued |
General |
35114 |
R2 |
16-FEB-2025 |
- |
- |
01-AUG-2023 |
Vide lr.dt.03.08.2022 & 01.08.2023, the allotte has been requested to submit the pre-establishment clearence obtained if any and implement the unit within the stipulated time. |
1122 |
8 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
Plot-64,Plot-65,Plot-66 |
62698 |
LIKHITHA INDUSTRIES LLP |
31-MAR-2021 |
31-MAR-2021 |
16-FEB-2022 |
13-JUN-2022 |
45,508,000.00
|
0.00 |
45,508,000.00 |
45,508,000.00 |
4,550,800.00 |
29-FEB-2024 |
40,957,200.00 |
Lease Deed(AR 2020) |
Notice Issued |
General |
31000 |
R2 |
12-JUN-2025 |
- |
- |
28-MAR-2023 |
Notice issued on 28.03.2023. |
1122 |
9 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
CFC 4B/4 |
63086 |
HOTEL TRUE JOY |
13-DEC-2021 |
14-DEC-2021 |
26-FEB-2022 |
14-MAR-2022 |
1,997,030.00
|
0.00 |
1,997,030.00 |
499,258.00 |
150,000.00 |
29-FEB-2024 |
349,258.00 |
Lease Deed(AR 2020) |
Notice Issued |
SC |
1214 |
R2 |
13-MAR-2025 |
- |
- |
03-AUG-2022 |
Possession of Land handed over to the allottee on 14-03-2022 |
864 |
10 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
CFC 4B/1 |
63116 |
EMC SHOPPING COMPLEX AND CANTEEN |
13-DEC-2021 |
14-DEC-2021 |
30-APR-2022 |
02-SEP-2022 |
4,195,500.00
|
0.00 |
4,195,500.00 |
4,195,500.00 |
446,750.00 |
29-FEB-2024 |
3,748,750.00 |
Lease Deed(AR 2020) |
Notice Issued |
Women,General |
1500 |
G4 |
01-SEP-2024 |
- |
- |
15-JUL-2022 |
Civil Works Commenced |
864 |
11 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
Plot No.94 B |
63651 |
SURYA GLASS |
31-MAR-2022 |
31-MAR-2022 |
24-JUN-2022 |
16-JUL-2022 |
1,664,740.00
|
0.00 |
1,664,740.00 |
1,664,740.00 |
166,474.00 |
29-FEB-2024 |
1,498,266.00 |
Lease Deed(AR 2020) |
- |
General |
1012 |
G4 |
15-JUL-2024 |
- |
- |
- |
Civil works commenced. |
757 |
12 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
CFC 4B/2 |
63930 |
PHR PG HOSTEL |
08-JUL-2022 |
09-JUL-2022 |
03-NOV-2022 |
04-APR-2023 |
4,649,839.00
|
0.00 |
4,649,839.00 |
4,649,839.00 |
2,177,600.00 |
29-FEB-2024 |
2,472,239.00 |
Lease Deed(AR 2020) |
- |
General |
1512 |
R2 |
03-APR-2025 |
- |
- |
- |
Lease Deed Executed on 29.03.2023 and possession handed over to the allottee on 04.04.2023. |
657 |
13 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
CFC 4B/3 |
63945 |
SARADA CRECHE CENTRE |
08-JUL-2022 |
09-JUL-2022 |
10-NOV-2022 |
20-FEB-2023 |
2,403,014.00
|
1,201,507.00 |
1,201,507.00 |
1,201,507.00 |
0.00 |
- |
1,201,507.00 |
Lease Deed(AR 2020) |
Notice Issued |
SC,Women |
781 |
R2 |
19-FEB-2026 |
- |
- |
14-AUG-2023 |
Lease Deed executed and registered on 20.2.23 and allottee optied for 25% option for payment of land cost. Vide lr. dt:14.8.23, the allottee has been req. to submit the present status of the unit. |
657 |
14 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
101 |
63957 |
BILDTIME.COM PRIVATE LIMITED |
08-JUL-2022 |
09-JUL-2022 |
10-AUG-2022 |
02-SEP-2022 |
8,058,120.00
|
0.00 |
8,058,120.00 |
4,029,060.00 |
4,052,623.00 |
29-FEB-2024 |
0.00 |
Lease Deed(AR 2020) |
Notice Issued |
General |
4452 |
R2 |
01-SEP-2025 |
- |
- |
28-MAR-2023 |
Notice issued on 28.03.2023. |
657 |
15 |
TIRUPATI |
Tirupati |
UDL ABUTTING EMC 1 |
LAND ABUTTING EMC 1 |
54520 |
Maveric Systems Limited |
10-JAN-2018 |
10-JAN-2018 |
16-APR-2018 |
22-MAY-2018 |
7,943,511.00
|
0.00 |
7,943,511.00 |
7,943,511.00 |
795,607.00 |
29-FEB-2024 |
7,147,904.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
10749 |
R2 |
30-JUN-2026 |
- |
30-JUN-2026 |
19-MAR-2022 |
EOT orders considered upto 30.06.2026. |
2298 |
16 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
Plot-73 |
64145 |
DHS NELL INDIA PRIVATE LIMITED |
27-DEC-2022 |
28-DEC-2022 |
11-MAY-2023 |
01-JUL-2023 |
8,716,960.00
|
0.00 |
8,716,960.00 |
8,716,960.00 |
871,696.00 |
29-FEB-2024 |
7,845,264.00 |
Lease Deed(AR 2020) |
- |
General |
4816 |
R2 |
30-JUN-2026 |
- |
- |
- |
Allottee opted the 50 % option and paid the 50%. Lease Deed Executed on 23.06.2023. |
485 |
17 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
Plot-70 |
64649 |
LS3 WAREHOUSES |
23-JUN-2023 |
24-JUN-2023 |
11-SEP-2023 |
26-OCT-2023 |
58,287,612.00
|
0.00 |
58,287,612.00 |
58,287,612.00 |
3,428,140.00 |
29-FEB-2024 |
54,859,472.00 |
Lease Deed(AR 2020) |
- |
Women,General |
18943 |
R2 |
25-OCT-2026 |
- |
- |
- |
Lease Deed Registered on 26.10.2023. Possession of land handed over to the allottee on 26.10.2023 |
307 |
18 |
TIRUPATI |
Tirupati |
IP PAGALI UDL |
UDL-1,UDL-1A,UDL-1B |
63114 |
Dolly Industries |
13-DEC-2021 |
14-DEC-2021 |
07-JUN-2022 |
14-SEP-2022 |
1,740,000.00
|
0.00 |
1,740,000.00 |
435,000.00 |
0.00 |
- |
435,000.00 |
Lease Deed(AR 2020) |
Notice Issued |
SC,Women |
4000 |
R2 |
13-SEP-2025 |
- |
- |
15-JUL-2023 |
Lease Deed Executed on 06-Jul-2022.Notice issued on 07.12.2022 regarding the present status of the company.Reminder issued on 15.07.2023. |
864 |
19 |
TIRUPATI |
Tirupati |
IP,Thatiparthy (UDL) |
UDL -6 |
64412 |
Punia Metox Private Limited |
01-MAR-2023 |
02-MAR-2023 |
20-JUN-2023 |
01-SEP-2023 |
8,806,789.00
|
0.00 |
8,806,789.00 |
8,806,789.00 |
1,681,667.00 |
29-FEB-2024 |
7,125,122.00 |
Lease Deed(AR 2020) |
- |
General |
16189 |
R2 |
30-AUG-2026 |
- |
- |
- |
Lease Deed Registered on 01-sep-2023. |
421 |
20 |
TIRUPATI |
Tirupati |
IP,Thatiparthy (UDL) |
UDL -8 |
64305 |
VFORM TECHNOPACK PRIVATE LIMITED |
01-MAR-2023 |
02-MAR-2023 |
13-JUN-2023 |
30-OCT-2023 |
16,072,230.00
|
0.00 |
16,072,230.00 |
8,036,115.00 |
1,761,200.00 |
29-FEB-2024 |
6,274,915.00 |
Lease Deed(AR 2020) |
- |
General |
29545 |
R2 |
29-OCT-2026 |
- |
- |
- |
Lease Deed Registered on 30.10.2023 and possession handed over to the company on 30.10.2023. |
421 |
21 |
TIRUPATI |
Tirupati |
IP,Thatiparthy (UDL) |
UDL -18 |
64727 |
Manchukonda Prakasham Industries India Private Limited |
23-JUN-2023 |
18-AUG-2023 |
20-SEP-2023 |
06-OCT-2023 |
16,947,776.00
|
0.00 |
16,947,776.00 |
16,947,776.00 |
1,795,690.00 |
29-FEB-2024 |
15,152,086.00 |
Lease Deed(AR 2020) |
- |
General |
31154 |
R2 |
05-OCT-2026 |
- |
- |
- |
Lease Deed Registered on 06.10.2023. Possession of land handed over to the allottee on 06.10.2023 |
252 |
22 |
TIRUPATI |
Tirupati |
IP,Thatiparthy (UDL) |
UDL -13 |
64794 |
HINDALCO INDUSTRIES LIMITED |
21-JUL-2023 |
11-SEP-2023 |
04-DEC-2023 |
30-JAN-2024 |
137,408,416.00
|
0.00 |
137,408,416.00 |
137,408,416.00 |
41,325,476.00 |
29-FEB-2024 |
96,082,944.00 |
Sale Agreement(Lease Deed) |
- |
General |
252589 |
R2 |
29-JAN-2027 |
- |
- |
- |
SA Executed and Registered on 30.01.2024 |
228 |
23 |
TIRUPATI |
Tirupati |
IP, VELAMPEDU |
UDL 2A |
62598 |
SUPER FLOORINGS PVT LTD |
05-MAR-2021 |
05-MAR-2021 |
06-JUL-2021 |
20-JUL-2021 |
3,127,400.00
|
0.00 |
3,127,400.00 |
3,127,400.00 |
312,740.00 |
29-FEB-2024 |
2,814,660.00 |
Lease Deed(AR 2020) |
Notice Issued |
General |
8230 |
R2 |
19-JUL-2024 |
- |
- |
04-MAY-2023 |
Lease Deed Executed on 06-jul-2021.Reminder notice issued on 04.05.2023 |
1148 |
24 |
TIRUPATI |
Tirupati |
IP, VELAMPEDU |
CFC ENCROACHMENT,UDL 2 |
63330 |
SIRAVIT CERAMICS PRIVATE LINITED |
19-JAN-2022 |
25-JAN-2022 |
13-MAY-2022 |
15-JUN-2022 |
44,690,440.00
|
0.00 |
44,690,440.00 |
44,690,440.00 |
9,343,797.00 |
29-FEB-2024 |
35,346,644.00 |
Lease Deed(AR 2020) |
- |
General |
89560 |
G4 |
14-JUN-2025 |
- |
- |
- |
Civil Works Commenced. |
822 |
25 |
TIRUPATI |
Tirupati |
IP, VELAMPEDU |
UDL 2B |
63516 |
PHARMACOP INDIA PRIVATE LIMITED |
15-MAR-2022 |
21-MAR-2022 |
22-OCT-2022 |
01-DEC-2022 |
5,730,552.00
|
0.00 |
5,730,552.00 |
1,432,638.00 |
0.00 |
- |
1,432,638.00 |
Lease Deed(AR 2020) |
Notice Issued |
SC,Women |
12141 |
R2 |
30-NOV-2025 |
- |
- |
22-JUL-2022 |
25% Land cost paid. Lease deed executed on 21.11.2022. |
767 |
26 |
TIRUPATI |
Tirupati |
IP, VELAMPEDU |
UDL 2C |
64070 |
METALLION ALLOYS PRIVATE LIMITED |
26-DEC-2022 |
28-DEC-2022 |
23-JAN-2023 |
25-JAN-2023 |
8,773,344.00
|
0.00 |
8,773,344.00 |
8,773,344.00 |
877,187.00 |
29-FEB-2024 |
7,896,157.00 |
Lease Deed(AR 2020) |
- |
General |
17832 |
G3 |
24-JAN-2026 |
- |
- |
- |
Lease Deed executed on 24.01.2023. Civil works completed and machinery yet to be erected. |
485 |
27 |
TIRUPATI |
Tirupati |
IP, VELAMPEDU |
UDL 3A |
64169 |
SVP LIFE SCIENCE |
27-DEC-2022 |
28-DEC-2022 |
13-JUL-2023 |
24-AUG-2023 |
3,981,564.00
|
1,990,782.00 |
1,990,782.00 |
1,990,782.00 |
398,323.00 |
29-FEB-2024 |
1,592,459.00 |
Lease Deed(AR 2020) |
- |
BC,Women |
8093 |
R2 |
23-AUG-2026 |
- |
- |
- |
Lease Deed Registered on 24.08.2023 and possession of land handed over to the company. |
485 |
28 |
TIRUPATI |
Tirupati |
IP, VELAMPEDU |
UDL 3 |
64409 |
Southern Ecologics and Services |
01-MAR-2023 |
02-MAR-2023 |
22-MAY-2023 |
05-JUN-2023 |
3,981,756.00
|
0.00 |
3,981,756.00 |
3,981,756.00 |
398,176.00 |
29-FEB-2024 |
3,583,580.00 |
Lease Deed(AR 2020) |
- |
Technocrat,General |
8093 |
R2 |
04-JUN-2026 |
- |
- |
- |
LD executed on 26.05.2023. Possession of land handed over to the company on 05.06.2023 |
421 |
29 |
TIRUPATI |
Tirupati |
IP, VELAMPEDU |
UDL 5 |
64657 |
G SRAVANI |
23-JUN-2023 |
24-JUN-2023 |
04-AUG-2023 |
06-OCT-2023 |
1,525,200.00
|
0.00 |
1,525,200.00 |
762,600.00 |
152,520.00 |
29-FEB-2024 |
610,080.00 |
Lease Deed(AR 2020) |
- |
BC,Women |
3100 |
R2 |
05-OCT-2025 |
- |
- |
- |
Lease Deed Registered on 06.10.2023. Possession of land handed over to the allottee on 06.10.2023 |
307 |
30 |
TIRUPATI |
Tirupati |
IP, Chinnapanduru -1 |
UDL-2 |
59064 |
HI-TECH PIPES LIMITED |
04-JUN-2018 |
04-JUN-2018 |
28-NOV-2018 |
01-JUN-2020 |
44,233,712.00
|
0.00 |
44,233,712.00 |
44,233,712.00 |
4,040,000.00 |
29-FEB-2024 |
40,193,712.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
40470 |
R2 |
31-MAY-2022 |
- |
30-NOV-2024 |
01-NOV-2022 |
EOT orders considered upto 30.11.2024 |
2153 |
31 |
TIRUPATI |
Tirupati |
IP, Chinnapanduru -1 |
UDL-2-A/2 |
63504 |
Hamilton Housewares Private Limited |
15-MAR-2022 |
16-MAR-2022 |
21-APR-2022 |
07-MAY-2022 |
17,804,148.00
|
0.00 |
17,804,148.00 |
17,804,148.00 |
1,780,415.00 |
29-FEB-2024 |
16,023,733.00 |
Lease Deed(AR 2020) |
Notice Issued |
General |
7082 |
G3 |
06-MAY-2025 |
- |
- |
22-NOV-2022 |
Lease deed executed on 28.4.22 & possesion of land handed over to company on 07.5.22.Civil Works Commenced. Vide letter dt:22.11.22, the allottee has been req., to submit the present status of unit. Civil works completed and machinery yet to be erected. |
772 |
32 |
TIRUPATI |
Tirupati |
IP, Chinnapanduru -1 |
UDL-2-A |
63505 |
Transafe Services Limited |
15-MAR-2022 |
19-MAR-2022 |
12-MAY-2022 |
05-JUL-2022 |
17,512,524.00
|
0.00 |
17,512,524.00 |
17,512,524.00 |
1,751,252.00 |
29-FEB-2024 |
15,761,272.00 |
Lease Deed(AR 2020) |
Notice Issued |
General |
6966 |
R2 |
04-JUL-2025 |
- |
- |
08-JUN-2023 |
Letter issued on 08.06.2023 request to submit the present status of the company. |
769 |
33 |
TIRUPATI |
Tirupati |
IP, Chinnapanduru -1 |
UDL-2-A/1 |
63935 |
M/s. SHREE SHYAM ROAD CARRIER |
08-JUL-2022 |
09-JUL-2022 |
10-OCT-2022 |
07-FEB-2023 |
26,409,046.00
|
0.00 |
26,409,046.00 |
26,409,046.00 |
10,646,350.00 |
29-FEB-2024 |
15,762,696.00 |
Lease Deed(AR 2020) |
- |
General |
6179 |
R2 |
06-FEB-2026 |
- |
- |
- |
Lease Deed Executed. |
657 |
34 |
TIRUPATI |
Tirupati |
IP, Chinnapanduru -1 |
UDL-3A2 |
64067 |
APG AUTO RUBBER INDUSTRIES |
26-DEC-2022 |
28-DEC-2022 |
17-APR-2023 |
23-MAY-2023 |
5,970,750.00
|
0.00 |
5,970,750.00 |
5,970,750.00 |
597,075.00 |
29-FEB-2024 |
5,373,675.00 |
Lease Deed(AR 2020) |
- |
General |
2375 |
R2 |
22-MAY-2025 |
- |
- |
- |
Lease Deed Executed on 17.05.2023 and registered on 23.05.2023. |
485 |
35 |
TIRUPATI |
Tirupati |
IP, Chinnapanduru -1 |
UDL-7A |
64069 |
REDDY PAI METALS |
26-DEC-2022 |
28-DEC-2022 |
18-MAY-2023 |
24-AUG-2023 |
30,522,474.00
|
0.00 |
30,522,474.00 |
30,522,474.00 |
3,052,247.00 |
29-FEB-2024 |
27,470,228.00 |
Lease Deed(AR 2020) |
- |
General |
12141 |
R2 |
23-AUG-2026 |
- |
- |
- |
Lease Deed Registered on 24.08.2023 and possession of land handed over to the company. |
485 |
36 |
TIRUPATI |
Tirupati |
IP, Chinnapanduru -1 |
UDL-7 |
64133 |
KOOLKING UDHYOG PRIVATE LIMITED |
27-DEC-2022 |
28-DEC-2022 |
01-MAR-2023 |
28-MAR-2023 |
30,522,474.00
|
0.00 |
30,522,474.00 |
30,522,474.00 |
3,052,247.00 |
29-FEB-2024 |
27,470,228.00 |
Lease Deed(AR 2020) |
- |
General |
12141 |
G4 |
27-MAR-2026 |
- |
- |
- |
Lease Deed Executed on 16.03.2023 and possession of land handed over to the allottee on 28.03.2023 Civil works commenced. |
485 |
37 |
TIRUPATI |
Tirupati |
IP,GAJULAMANDYAM |
Plot No.37-E |
44874 |
MRL INDUSTRIES |
20-JUL-2022 |
20-JUL-2022 |
28-AUG-2014 |
26-DEC-2014 |
7,240,092.00
|
- |
- |
7,240,092.00 |
0.00 |
- |
7,240,092.00 |
Provisional Allotment |
Notice Issued |
SC |
11493 |
NA |
31-MAR-2025 |
- |
- |
02-DEC-2022 |
Cancellation-cum-Resumption order issued on 25.06.2019. Allottee filed WP.No.24183/2018. Allottee withdrawn. Re allotment orders issued as per GO MS No.7 on 20.07.2022. Vide letter dt:02.12.2022, the allottee has been requested to pay the land cost. |
646 |
38 |
TIRUPATI |
Tirupati |
IP,GAJULAMANDYAM |
LAND 3 |
62758 |
SRI SRINIVASAYA PULVERISING INDUSTRIES |
20-MAY-2021 |
20-MAY-2021 |
26-APR-2022 |
11-MAY-2022 |
1,472,940.00
|
0.00 |
1,472,940.00 |
1,472,940.00 |
0.00 |
- |
1,472,940.00 |
Lease Deed(AR 2020) |
Notice Issued |
SC,Women |
835 |
R2 |
10-MAY-2025 |
- |
- |
17-MAR-2023 |
Lease deed executed and registered. Vide letter dt:17.03.2023, the allottee has been requested to furnish the present status of the unit. |
1072 |
39 |
TIRUPATI |
Tirupati |
IP,GAJULAMANDYAM |
LAND 5 |
62765 |
SRI BRAMARAMBHIKA SIDHA LINGESWARA DISPOSABLE PRODUCTS |
20-MAY-2021 |
20-MAY-2021 |
15-NOV-2021 |
28-OCT-2022 |
488,628.00
|
0.00 |
488,628.00 |
488,628.00 |
48,863.00 |
29-FEB-2024 |
439,765.00 |
Lease Deed(AR 2020) |
- |
BC |
277 |
R2 |
27-OCT-2024 |
- |
- |
- |
Restored on 14.10.2022. Lease deed executed on 25.10.2022. |
1072 |
40 |
TIRUPATI |
Tirupati |
IP,GAJULAMANDYAM |
LAND 2 |
62774 |
SIVA SHAKTHI WEIGHBRIDGE |
20-MAY-2021 |
20-MAY-2021 |
14-OCT-2021 |
11-MAY-2022 |
802,620.00
|
0.00 |
802,620.00 |
200,655.00 |
0.00 |
- |
200,655.00 |
Lease Deed(AR 2020) |
Notice Issued |
SC |
455 |
R2 |
10-MAY-2025 |
- |
- |
17-MAR-2023 |
Lease deed executed and registered. Vide letter dt:17.03.2023, the allottee has been requested to furnish the present status of the unit. |
1072 |
41 |
TIRUPATI |
Tirupati |
IP,GAJULAMANDYAM |
LAND 6 |
63089 |
RS TOOLS |
13-DEC-2021 |
14-DEC-2021 |
05-APR-2022 |
10-JUN-2022 |
991,368.00
|
0.00 |
991,368.00 |
495,684.00 |
555,037.00 |
29-FEB-2024 |
0.00 |
Lease Deed(AR 2020) |
Notice Issued |
General |
562 |
R2 |
09-JUN-2024 |
- |
- |
18-MAR-2023 |
Lease deed executed and registered. Vide letter dt:18.03.2023, the allottee has been requested to furnish the present status of the unit. |
864 |
42 |
TIRUPATI |
Tirupati |
IP,GAJULAMANDYAM |
LAND 1 |
63101 |
MANYAM SIMHAM PRINTING PRESS |
13-DEC-2021 |
14-DEC-2021 |
28-SEP-2022 |
21-OCT-2022 |
940,212.00
|
0.00 |
940,212.00 |
235,053.00 |
0.00 |
- |
235,053.00 |
Lease Deed(AR 2020) |
Notice Issued |
ST |
533 |
R2 |
20-OCT-2025 |
- |
- |
18-MAR-2023 |
Lease deed executed and registered. Vide letter dt:18.03.2023, the allottee has been requested to furnish the present status of the unit. |
864 |
43 |
TIRUPATI |
Tirupati |
IP_CHINTHALAPALEM |
UDL 2 |
63512 |
CMR ECO ALUMINIUM PRIVATE LIMITED |
15-MAR-2022 |
17-MAR-2022 |
04-APR-2022 |
25-APR-2022 |
139,998,288.00
|
0.00 |
139,998,288.00 |
139,998,288.00 |
13,999,829.00 |
29-FEB-2024 |
125,998,464.00 |
Lease Deed(AR 2020) |
- |
General |
156773 |
G3 |
24-APR-2025 |
- |
- |
- |
Lease Deed Executed on 07.04.2022. Civil works completed and machinery yet to be erected. |
771 |
44 |
TIRUPATI |
Tirupati |
IP_GUNTAKINDAPALLI_LAO_SUJAN |
PLOT NO - 7 |
56781 |
M/s. Lellapalli AAC Blocks |
20-JUL-2022 |
20-JUL-2022 |
30-OCT-2018 |
03-DEC-2018 |
4,249,560.00
|
2,000,000.00 |
2,249,560.00 |
2,249,560.00 |
0.00 |
- |
2,249,560.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
8496 |
G3 |
31-MAR-2025 |
- |
- |
02-DEC-2022 |
Re-allotment orders issued as per G.O.Ms.No.07 on 20.07.2022. Hence, implementation time will be upto 31.03.2025. Vide letter dt:02.12.2022, the allottee has been req., to pay the land cost. Civil works completed and machinery yet to be erected. |
646 |
45 |
TIRUPATI |
Tirupati |
IP_GUNTAKINDAPALLI_LAO_SUJAN |
5A |
64147 |
Swarnamukhi Kalamkari Artisan Associations |
27-DEC-2022 |
28-DEC-2022 |
26-SEP-2023 |
07-OCT-2023 |
2,013,746.00
|
0.00 |
2,013,746.00 |
2,013,746.00 |
201,375.00 |
29-FEB-2024 |
1,812,371.00 |
Lease Deed(AR 2020) |
Notice Issued |
Women,General |
3466 |
R2 |
06-OCT-2025 |
- |
- |
23-JUN-2023 |
Lease Deed Registered on 07.10.2023. Possession of land handed over to the allottee on 07.10.2023 |
485 |
46 |
TIRUPATI |
Tirupati |
IP, INAGALUR |
UDL |
63844 |
M/s. HILLTOP SEZ DEVELOPMENT (I) PVT LTD |
19-MAY-2022 |
20-MAY-2022 |
23-AUG-2022 |
17-SEP-2022 |
188,544,560.00
|
0.00 |
188,544,560.00 |
188,544,560.00 |
19,369,904.00 |
29-FEB-2024 |
169,174,656.00 |
Lease Deed(AR 2020) |
- |
General |
1173914 |
R2 |
16-SEP-2026 |
- |
- |
- |
Lease Deed Executed on 16-Sep-2022 |
707 |
47 |
TIRUPATI |
Tirupati |
IP_TIRUPATI |
PLOT NO. 41-A |
42132 |
HARITHA INDUSTRIES |
10-MAR-2022 |
10-MAR-2022 |
03-DEC-2013 |
04-FEB-2014 |
220,416.00
|
- |
- |
220,416.00 |
0.00 |
- |
220,416.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
132 |
R2 |
31-MAR-2025 |
- |
- |
18-SEP-2022 |
Re allotment orders issued on 20.07.2022 as per GO MS No.7. Notice issued to the allottee regarding to submit the present status of the unit and bi-monthly progress report. |
778 |
48 |
TIRUPATI |
Tirupati |
MSME,Ramireddypalli |
49 |
62822 |
M/s. SRI VARI JJ INDUSTRY |
20-MAY-2021 |
20-MAY-2021 |
19-NOV-2021 |
11-JAN-2022 |
973,263.00
|
486,632.00 |
486,631.00 |
121,658.00 |
0.00 |
- |
121,658.00 |
Lease Deed(AR 2020) |
- |
ST |
439 |
G2 |
10-JAN-2025 |
- |
- |
- |
Machinery erected and trail production done. |
1072 |
49 |
TIRUPATI |
Tirupati |
MSME,Ramireddypalli |
23 |
63507 |
REDDAPPAAH AUTOMOBILE INDUSTRIES |
15-MAR-2022 |
21-MAR-2022 |
29-JUN-2022 |
28-JUL-2022 |
1,150,623.00
|
0.00 |
1,150,623.00 |
1,150,623.00 |
132,577.00 |
29-FEB-2024 |
1,018,046.00 |
Lease Deed(AR 2020) |
Notice Issued |
BC,Women |
519 |
G3 |
27-JUL-2024 |
- |
- |
13-JUL-2023 |
Lease deed executed on 19.7.22 and registered. Possession handed over on 28.7.22. Civil works completed and machinery yet to be ereceted. |
767 |
50 |
TIRUPATI |
Tirupati |
MSME,Ramireddypalli |
61 |
63508 |
GANAPATHI ENTERPRISES |
15-MAR-2022 |
19-MAR-2022 |
03-AUG-2022 |
24-SEP-2022 |
831,375.00
|
0.00 |
831,375.00 |
415,688.00 |
83,138.00 |
29-FEB-2024 |
332,550.00 |
Lease Deed(AR 2020) |
Notice Issued |
BC |
375 |
R2 |
23-SEP-2024 |
- |
- |
14-AUG-2023 |
Lease deed executed on 2.9.22 and possession handed over on 24.09.22. Vide lr dt:20.3.23 & 14.8.23, the allottee has been requested to commence the construction of the unit within the stipulated time. |
769 |
51 |
TIRUPATI |
Tirupati |
MSME,Ramireddypalli |
66,67 |
63509 |
SRI DHANALAKSHMI AGARABATHI WORKS |
15-MAR-2022 |
21-MAR-2022 |
10-AUG-2022 |
16-SEP-2022 |
1,601,561.00
|
800,780.00 |
800,781.00 |
200,195.00 |
0.00 |
- |
200,195.00 |
Lease Deed(AR 2020) |
Notice Issued |
ST,Women |
724 |
R2 |
15-SEP-2025 |
- |
- |
17-MAR-2023 |
Lease Deed Executed 07.09.2022. Vide letter dt:17.03.2023, the allottee has been requested to commence the construction of the unit within the stipulated time. |
767 |
52 |
TIRUPATI |
Tirupati |
MSME,Ramireddypalli |
55 |
63526 |
NAGARJUNA DOORS AND WINDOWS |
15-MAR-2022 |
21-MAR-2022 |
30-JUL-2022 |
14-SEP-2022 |
948,876.00
|
0.00 |
948,876.00 |
237,219.00 |
0.00 |
- |
237,219.00 |
Lease Deed(AR 2020) |
Notice Issued |
SC |
428 |
R2 |
13-SEP-2025 |
- |
- |
27-JUL-2023 |
Lease Deed Executed on 27-Aug-2022. Vide letter dt:18.03.2023 & 27.07.2023, the allottee has been requested to commence the construction of the unit within the stipulated time. |
767 |
53 |
TIRUPATI |
Tirupati |
MSME,Ramireddypalli |
50 |
63708 |
LAKSHMI GARMENTS |
31-MAR-2022 |
31-MAR-2022 |
30-JUL-2022 |
19-OCT-2022 |
948,876.00
|
0.00 |
948,876.00 |
948,876.00 |
94,888.00 |
29-FEB-2024 |
853,988.00 |
Lease Deed(AR 2020) |
Notice Issued |
BC,Women |
428 |
R2 |
18-OCT-2024 |
- |
- |
20-MAR-2023 |
Lease Deed Executed on 29.08.2022. Vide letter dt:20.03.2023 & 26.07.2023, the allottee has been requested to commence the construction of the unit within the stipulated time. |
757 |
54 |
TIRUPATI |
Tirupati |
MSME,Ramireddypalli |
40 |
63716 |
DHARSHA INDUSTRIES |
31-MAR-2022 |
31-MAR-2022 |
20-AUG-2022 |
01-NOV-2022 |
665,100.00
|
332,550.00 |
332,550.00 |
83,138.00 |
0.00 |
- |
83,138.00 |
Lease Deed(AR 2020) |
Notice Issued |
SC,Women |
300 |
R2 |
31-OCT-2025 |
- |
- |
14-JUL-2023 |
Lease deed executed on 17.09.22 registered vide Doc.No.8211/22, dt:01.11.22. Vide letter dt:14.07.23, the allottee has been requested to commence the construction of the unit within the stipulated time |
757 |
55 |
TIRUPATI |
Tirupati |
MSME,Ramireddypalli |
51 |
64146 |
SREE GARMENTS |
27-DEC-2022 |
28-DEC-2022 |
24-APR-2023 |
06-JUN-2023 |
1,043,892.00
|
0.00 |
1,043,892.00 |
1,043,892.00 |
104,389.00 |
29-FEB-2024 |
939,503.00 |
Lease Deed(AR 2020) |
Notice Issued |
Women,General |
428 |
R2 |
05-JUN-2025 |
- |
- |
26-JUL-2023 |
Lease Deed Registered on 6.6.23 and possession of land handered over to the company on 6.6.23. Vide lr. dt:26.7.23, the allottee has been requested to commence the civil works within stipulated time. |
485 |
56 |
TIRUPATI |
Tirupati |
MSME,Ramireddypalli |
48 |
64213 |
ORANGE PAINTS/CHIGURUPATI GUNASEKHAR |
27-DEC-2022 |
28-DEC-2022 |
28-MAR-2023 |
12-APR-2023 |
731,700.00
|
0.00 |
731,700.00 |
731,700.00 |
73,170.00 |
29-FEB-2024 |
658,530.00 |
Lease Deed(AR 2020) |
- |
General |
300 |
R2 |
11-APR-2025 |
- |
- |
- |
Lease Deed Executed on 01.04.2023 and possession handed over to allottee on 12.04.2023 |
485 |
57 |
TIRUPATI |
Tirupati |
UDL GUNTAKINDAPALLI |
UDL |
62174 |
Vishnu Barium Private Limited |
16-DEC-2020 |
16-DEC-2020 |
29-JUL-2021 |
02-JUN-2022 |
38,977,632.00
|
0.00 |
38,977,632.00 |
38,977,632.00 |
3,897,763.00 |
29-FEB-2024 |
35,079,868.00 |
Lease Deed(AR 2020) |
Notice Issued |
Technocrat |
105061 |
R2 |
01-JUN-2025 |
- |
- |
17-NOV-2022 |
Lease deed Executed on 25-05-2022. Allottee requested for merger of both allotments. Report submitted to HO. Orders awaited. |
1227 |
58 |
TIRUPATI |
Tirupati |
UDL GUNTAKINDAPALLI 1.96 ACS |
UDL1 |
63712 |
Vishnu Barium Pvt Ltd |
31-MAR-2022 |
31-MAR-2022 |
05-MAY-2022 |
02-JUN-2022 |
5,029,522.00
|
0.00 |
5,029,522.00 |
5,029,522.00 |
502,952.00 |
29-FEB-2024 |
4,526,570.00 |
Lease Deed(AR 2020) |
Notice Issued |
Technocrat,General |
7933 |
R2 |
01-JUN-2025 |
- |
- |
23-NOV-2022 |
Lease deed Executed on 25-05-2022. Allottee requested for merger of both allotments. Report submitted to HO. Orders awaited. |
757 |