S.No  |  DISTRICT  |  ZONE  |  INDUSTRIAL PARK  |  PLOT NO  |  ALLOTMENT NUMBER  |  NAME OF THE INDUSTRY  |  ALLOTMENT DATE  |  PROVISIONAL ALLOTMENT DATE  |  FINAL ALLOTMENT DATE  |  DATE OF PHYSICAL POSSESSION  |  ALLOTMENT VALUE  |  REBATE AMOUNT  |  NET ALLOTMENT VALUE  |  ADVANCE TO BE PAID  |  AMOUNT RECEIVED  |  LAST PAID DATE  |  BALANCE ADVANCE AMOUNT  |  STATUS OF ALLOTMENT  |  CANCELLATION  |  CATEGORY OF ALLOTMENT  |  EXTENT IN SQM  |  IMPLEMENTATION STATUS CODE NEW  |  IMPLEMENTATION DUE DATE  |  DCP DATE  |  EOT PERIOD  |  NOTICE ISSUED DATE  |  IMPL ZM REMARKS  |  ALLOTMENT AGE IN DAYS  |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
KURNOOL |
Kurnool |
APIE_ADONI |
Pl:C1,Pl:C2 |
8183 |
RAYALASEEMA TISSUES LTD |
05-AUG-1985 |
05-AUG-1985 |
03-NOV-1985 |
03-NOV-1985 |
15,215.00
|
- |
- |
15,215.00 |
0.00 |
- |
15,215.00 |
Sale Agreement(Lease Deed) |
- |
Others |
2536 |
G4 |
02-NOV-1987 |
- |
- |
- |
Referred to HO for transfer of allotment as the plots are purchased in auction by APSFC and registered sale deed in favour of vidyavathi. Orders awaited from HO. |
14138 |
2 |
KURNOOL |
Kurnool |
APIE_ADONI |
Pl:3 |
8097 |
PRATAP ENGINEERING WORKS |
16-MAR-2001 |
16-MAR-2001 |
30-MAY-2001 |
09-NOV-2001 |
9,811.00
|
- |
- |
9,811.00 |
0.00 |
- |
9,811.00 |
Sale Deed |
Notice Issued |
Others |
298 |
R2 |
08-NOV-2003 |
- |
- |
11-DEC-2012 |
Sale Agreement and Sale Deed registered on the same day as per the then regulations without implementation of the Project. From there onwards no implementation. Without intimation to APIIC 3rd party transactions also done. |
8436 |
3 |
KURNOOL |
Kurnool |
APIE_ADONI |
Pl:5 |
8106 |
SAVITHRI ENGINEERING WORKS |
31-MAR-2001 |
31-MAR-2001 |
07-MAR-2002 |
26-MAR-2002 |
9,811.00
|
- |
- |
9,811.00 |
0.00 |
- |
9,811.00 |
Sale Deed |
Notice Issued |
Others |
298 |
R2 |
25-MAR-2004 |
- |
- |
11-DEC-2012 |
Sale Agreement and Sale Deed registered on the same day as per the then regulations without implementation of the Project. From there onwards no implementation. Without intimation to APIIC 3rd party transactions also done. |
8421 |
4 |
KURNOOL |
Kurnool |
APIE_ADONI |
Pl:4 |
8107 |
PRATAP ENGINEERING WORKS |
31-MAR-2001 |
31-MAR-2001 |
22-OCT-2001 |
09-NOV-2001 |
9,811.00
|
- |
- |
9,811.00 |
0.00 |
- |
9,811.00 |
Sale Deed |
Notice Issued |
Others |
268 |
R2 |
08-NOV-2003 |
- |
- |
11-DEC-2012 |
Sale Agreement and Sale Deed registered on the same day as per the then regulations without implementation of the Project. From there onwards no implementation. Without intimation to APIIC 3rd party transactions also done. |
8421 |
5 |
KURNOOL |
Kurnool |
APIE_ADONI |
Pl:10,Pl:9 |
8104 |
GIRIJA HALLOW CEMENT BRICKS |
26-MAY-2001 |
26-MAY-2001 |
30-DEC-2002 |
31-JAN-2003 |
19,635.00
|
- |
- |
19,635.00 |
0.00 |
- |
19,635.00 |
Sale Deed |
Notice Issued |
Others |
596 |
R2 |
30-JAN-2005 |
- |
- |
11-DEC-2012 |
Sale Agreement and Sale Deed registered on the same day as per the then regulations without implementation of the Project. From there onwards no implementation. Without intimation to APIIC 3rd party transactions also done. |
8365 |
6 |
KURNOOL |
Kurnool |
APIE_ADONI |
Pl:11,Pl:12 |
8108 |
BMD ISMAIL ENGINEERING WORKS |
04-OCT-2001 |
04-OCT-2001 |
29-MAY-2002 |
19-JUN-2002 |
15,939.00
|
- |
- |
15,939.00 |
0.00 |
- |
15,939.00 |
Sale Deed |
Notice Issued |
Others |
484 |
R2 |
19-JUN-2002 |
- |
- |
11-DEC-2012 |
Sale Agreement and Sale Deed registered on the same day as per the then regulations without implementation of the Project. From there onwards no implementation. Without intimation to APIIC 3rd party transactions also done. |
8234 |
7 |
KURNOOL |
Kurnool |
APIE_ADONI |
Pl:F4 |
8055 |
NAIDULORRYBODYBUILDS |
30-JAN-2002 |
30-JAN-2002 |
25-FEB-2002 |
17-MAY-2002 |
31,352.00
|
- |
- |
31,352.00 |
0.00 |
- |
31,352.00 |
Sale Deed |
Notice Issued |
Others |
1046 |
R2 |
16-MAY-2004 |
- |
- |
30-DEC-2011 |
Sale Agreement and Sale Deed registered on the same day as per the then regulations without implementation of the Project. From there onwards no implementation. Without intimation to APIIC 3rd party transactions also done. |
8116 |
8 |
KURNOOL |
Kurnool |
IP-Guttapadu-Orvakal Node |
A-11 |
62458 |
RPS INDUSTRIES PRIVATE LIMITED |
19-FEB-2021 |
24-MAR-2021 |
30-MAR-2022 |
04-APR-2022 |
27,999,108.00
|
0.00 |
27,999,108.00 |
27,999,108.00 |
743.00 |
29-FEB-2024 |
27,998,364.00 |
Lease Deed(AR 2020) |
- |
General |
45306 |
R2 |
03-APR-2025 |
- |
- |
- |
Land in Possession of Company |
1123 |
9 |
KURNOOL |
Kurnool |
IP-Guttapadu-Orvakal Node |
A-10 |
62457 |
SIGACHI INDUSTRIES LIMITED |
19-FEB-2021 |
24-MAR-2021 |
30-MAR-2022 |
04-APR-2022 |
62,752,956.00
|
0.00 |
62,752,956.00 |
62,752,956.00 |
763.00 |
29-FEB-2024 |
62,752,192.00 |
Lease Deed(AR 2020) |
- |
General |
101542 |
R2 |
03-APR-2025 |
- |
- |
- |
Land in Possession of Company |
1123 |
10 |
KURNOOL |
Kurnool |
IP-Guttapadu-Orvakal Node |
A-14 |
62482 |
PRIMO POLY PACK |
19-FEB-2021 |
18-MAR-2021 |
04-APR-2022 |
25-AUG-2022 |
12,953,898.00
|
2,000,000.00 |
10,953,898.00 |
10,953,898.00 |
0.00 |
- |
10,953,898.00 |
Lease Deed(AR 2020) |
- |
SC |
20961 |
R2 |
24-AUG-2025 |
- |
- |
- |
Land in Possession of Company |
1129 |
11 |
KURNOOL |
Kurnool |
IP-Guttapadu-Orvakal Node |
CU-07A |
63744 |
APTRANSCO |
16-APR-2022 |
01-APR-2022 |
04-JUL-2022 |
11-AUG-2022 |
13,755,753.00
|
0.00 |
13,755,753.00 |
13,755,753.00 |
0.00 |
- |
13,755,753.00 |
Final Allotment |
- |
General |
22259 |
G4 |
10-AUG-2025 |
- |
- |
- |
Under Construction |
750 |
12 |
KURNOOL |
Kurnool |
UDL-RACHUMARRI-I |
UDL |
64293 |
MARUTI ISPAT & ENERGY PVT LTD |
01-MAR-2023 |
02-MAR-2023 |
10-APR-2023 |
20-OCT-2023 |
7,489,260.00
|
0.00 |
7,489,260.00 |
7,489,260.00 |
748,926.00 |
29-FEB-2024 |
6,740,334.00 |
Lease Deed(AR 2020) |
- |
General |
55890 |
R2 |
19-OCT-2026 |
- |
- |
- |
Land Allotted to Company |
415 |
13 |
KURNOOL |
Kurnool |
IP-Kurnool Mega Industrial Hub |
GUTTAPADU |
52321 |
M/s. Jai Raj Ispat Limited |
31-OCT-2016 |
31-OCT-2016 |
21-DEC-2018 |
07-JAN-2019 |
129,636,496.00
|
0.00 |
129,636,496.00 |
129,636,496.00 |
13,289,035.00 |
28-FEB-2024 |
116,347,464.00 |
Sale Agreement(Lease Deed) |
- |
General |
1498969 |
G4 |
06-JAN-2022 |
- |
06-JAN-2025 |
- |
Under Construction |
2728 |
14 |
KURNOOL |
Kurnool |
KMIH-GUTTAPADU-JRIL COMPACT |
Guttapadu_JRIL_Compt |
53860 |
M/s. Jai Raj Ispat Limited |
02-NOV-2017 |
02-NOV-2017 |
21-DEC-2018 |
07-JAN-2019 |
46,512,332.00
|
0.00 |
46,512,332.00 |
46,512,332.00 |
0.00 |
- |
46,512,332.00 |
Sale Agreement(Lease Deed) |
- |
General |
180982 |
G4 |
06-JAN-2022 |
- |
06-JAN-2025 |
- |
Under Construction |
2361 |
15 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 6,PLOT NO-7 |
58089 |
M/s CHARAN TECHNOLOGIES |
08-JAN-2019 |
08-JAN-2019 |
07-MAY-2019 |
26-AUG-2019 |
362,400.00
|
181,200.00 |
181,200.00 |
181,200.00 |
0.00 |
- |
181,200.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
ST |
600 |
R2 |
25-AUG-2022 |
- |
05-OCT-2024 |
14-OCT-2022 |
Land in possession of company |
1929 |
16 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 10,PLOT NO- 11 |
58092 |
M/s Suresh Industries |
08-JAN-2019 |
08-JAN-2019 |
07-MAY-2019 |
26-AUG-2019 |
362,400.00
|
181,200.00 |
181,200.00 |
181,200.00 |
0.00 |
- |
181,200.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
600 |
R2 |
25-AUG-2022 |
- |
05-OCT-2024 |
14-OCT-2022 |
Land in possession of company |
1929 |
17 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 65,PLOT NO- 66 |
58096 |
M/s SGLJ Industries |
08-JAN-2019 |
08-JAN-2019 |
07-MAY-2019 |
26-AUG-2019 |
362,400.00
|
181,200.00 |
181,200.00 |
181,200.00 |
0.00 |
- |
181,200.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC |
600 |
R2 |
25-AUG-2022 |
- |
05-OCT-2024 |
14-OCT-2022 |
Land in possession of company |
1929 |
18 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 68,PLOT NO- 69,PLOT NO- 70 |
58090 |
MS LAKSHMI MEGHANA ENTERPRISES |
06-JUL-2022 |
06-JUL-2022 |
25-OCT-2022 |
11-MAY-2023 |
938,700.00
|
469,350.00 |
469,350.00 |
469,350.00 |
0.00 |
- |
469,350.00 |
Sale Agreement(Lease Deed) |
NA |
SC |
900 |
R2 |
31-MAR-2025 |
- |
- |
- |
Land in Possession of Company |
654 |
19 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 82 |
58055 |
MS HEMLI INDUSTRIES |
23-JAN-2019 |
23-JAN-2019 |
07-MAY-2019 |
02-AUG-2019 |
181,200.00
|
90,600.00 |
90,600.00 |
90,600.00 |
0.00 |
- |
90,600.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
ST |
300 |
R2 |
01-AUG-2022 |
- |
05-OCT-2024 |
04-AUG-2022 |
Land in possession of company |
1914 |
20 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO -1 |
58060 |
P SREEPATHI REDDY |
23-JAN-2019 |
23-JAN-2019 |
19-SEP-2019 |
23-NOV-2019 |
181,200.00
|
0.00 |
181,200.00 |
181,200.00 |
0.00 |
- |
181,200.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
300 |
R2 |
22-NOV-2020 |
- |
05-OCT-2024 |
29-NOV-2022 |
Land in possession of company |
1914 |
21 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO-8 |
58062 |
M/S VANI INDUSTRIES |
23-JAN-2019 |
23-JAN-2019 |
07-MAY-2019 |
02-AUG-2019 |
181,200.00
|
90,600.00 |
90,600.00 |
90,600.00 |
0.00 |
- |
90,600.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
ST |
300 |
R2 |
01-AUG-2022 |
- |
05-OCT-2024 |
04-AUG-2022 |
Land in possession of company |
1914 |
22 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 23 |
58054 |
M/S KONOJI INDUSTRIES, |
23-JAN-2019 |
23-JAN-2019 |
07-MAY-2019 |
02-AUG-2019 |
262,136.00
|
131,068.00 |
131,068.00 |
131,068.00 |
0.00 |
- |
131,068.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
ST |
434 |
R2 |
01-AUG-2022 |
- |
05-OCT-2024 |
04-AUG-2022 |
Land in possession of company |
1914 |
23 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 23/A |
58132 |
M/S K.V.R CEMENT BRICKS INDUSTRIES |
22-FEB-2019 |
22-FEB-2019 |
01-JUL-2019 |
02-AUG-2019 |
241,600.00
|
120,800.00 |
120,800.00 |
120,800.00 |
0.00 |
- |
120,800.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
ST |
400 |
R2 |
01-AUG-2022 |
- |
05-OCT-2024 |
04-AUG-2022 |
Land in possession of company |
1884 |
24 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 2 |
59997 |
P SREEPATHI REDDY |
19-AUG-2019 |
19-AUG-2019 |
19-SEP-2019 |
23-NOV-2019 |
181,200.00
|
0.00 |
181,200.00 |
181,200.00 |
0.00 |
- |
181,200.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
300 |
R2 |
22-NOV-2020 |
- |
05-OCT-2024 |
29-NOV-2022 |
Land in possession of company |
1706 |
25 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 105 |
60058 |
D ARUNA KUMARI |
19-AUG-2019 |
19-AUG-2019 |
25-NOV-2019 |
22-JAN-2020 |
285,692.00
|
0.00 |
285,692.00 |
285,692.00 |
0.00 |
- |
285,692.00 |
Sale Agreement(Lease Deed) |
- |
Women |
473 |
R2 |
21-JUL-2021 |
- |
05-OCT-2024 |
- |
Land in possession of company |
1706 |
26 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 13 |
60745 |
M/s.SNS SUDHEER INDUSTRIES |
15-NOV-2019 |
15-NOV-2019 |
30-APR-2020 |
08-JAN-2021 |
1,334,840.00
|
0.00 |
1,334,840.00 |
1,334,840.00 |
0.00 |
- |
1,334,840.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
2210 |
R2 |
07-JAN-2023 |
- |
05-OCT-2024 |
17-DEC-2022 |
Land in Possession of the Company |
1618 |
27 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 156 |
60786 |
M/S SAI SRINIVAS INDUSTRIES |
25-NOV-2019 |
25-NOV-2019 |
07-MAR-2020 |
29-DEC-2020 |
401,056.00
|
200,528.00 |
200,528.00 |
200,528.00 |
0.00 |
- |
200,528.00 |
Sale Agreement(Lease Deed) |
- |
ST |
664 |
R2 |
28-DEC-2023 |
- |
05-OCT-2024 |
- |
Land in possession of Company |
1608 |
28 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 9 |
61124 |
Bodhi Enterprises |
20-JAN-2020 |
20-JAN-2020 |
13-JUL-2020 |
29-DEC-2020 |
181,200.00
|
90,600.00 |
90,600.00 |
90,600.00 |
0.00 |
- |
90,600.00 |
Sale Agreement(Lease Deed) |
- |
SC |
300 |
R2 |
28-DEC-2023 |
- |
05-OCT-2024 |
- |
Land in Possession of Company |
1552 |
29 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 107 |
61059 |
SVASTANA TECHNOLOGIES MANUFACTURING PRIVATE LIMITED |
20-JAN-2020 |
20-JAN-2020 |
13-JUL-2020 |
27-NOV-2020 |
567,156.00
|
283,578.00 |
283,578.00 |
283,578.00 |
0.00 |
- |
283,578.00 |
Sale Agreement(Lease Deed) |
- |
SC |
939 |
R2 |
26-NOV-2023 |
- |
05-OCT-2024 |
- |
Land in Possession of Company |
1552 |
30 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 87 |
61540 |
M/s Shaik Haneefa Flour Mill |
24-FEB-2020 |
24-FEB-2020 |
16-NOV-2021 |
22-DEC-2021 |
684,208.00
|
0.00 |
684,208.00 |
684,208.00 |
103.00 |
29-FEB-2024 |
684,105.00 |
Sale Agreement(Lease Deed) |
- |
BC,Women |
656 |
R2 |
21-DEC-2023 |
- |
05-OCT-2024 |
- |
Land in possession of company |
1517 |
31 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 14,PLOT NO- 15,PLOT NO- 16 |
61604 |
M/s. SNS SUDHEER INDUSTRIES |
24-FEB-2020 |
24-FEB-2020 |
30-APR-2020 |
08-JAN-2021 |
652,924.00
|
0.00 |
652,924.00 |
652,924.00 |
0.00 |
- |
652,924.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
Women,General |
1081 |
R2 |
07-JAN-2023 |
- |
05-OCT-2024 |
17-DEC-2022 |
Land in Possession of Company |
1517 |
32 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 109 |
61729 |
M/s NAVAJYOTHI FLY ASH BRICKS |
29-APR-2020 |
29-APR-2020 |
29-APR-2023 |
06-MAY-2023 |
1,313,137.00
|
656,568.00 |
656,569.00 |
656,569.00 |
0.00 |
- |
656,569.00 |
Sale Agreement(Lease Deed) |
- |
SC |
1259 |
R2 |
05-MAY-2026 |
- |
- |
- |
Sale Agreement Registered |
1452 |
33 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 67 |
61798 |
Nishanth Industries |
29-APR-2020 |
29-APR-2020 |
18-AUG-2020 |
29-DEC-2020 |
181,200.00
|
90,600.00 |
90,600.00 |
90,600.00 |
0.00 |
- |
90,600.00 |
Sale Agreement(Lease Deed) |
- |
SC |
300 |
R2 |
28-DEC-2023 |
- |
05-OCT-2024 |
- |
Land in possession of company |
1452 |
34 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 88 |
61809 |
VICTORIA PAPER PRODUCT INDUSTRIES |
29-APR-2020 |
29-APR-2020 |
03-AUG-2020 |
08-JAN-2021 |
181,200.00
|
0.00 |
181,200.00 |
181,200.00 |
0.00 |
- |
181,200.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
BC |
300 |
R2 |
07-JAN-2023 |
- |
05-OCT-2024 |
17-DEC-2022 |
Land in Possession of Company |
1452 |
35 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 59 |
62306 |
M/s T.T. INDUSTRIES (TWINKLE TWINKLE INDUSTRIES) |
19-FEB-2021 |
23-MAR-2021 |
28-JUN-2021 |
28-OCT-2021 |
312,900.00
|
156,450.00 |
156,450.00 |
156,450.00 |
0.00 |
- |
156,450.00 |
Lease Deed(AR 2020) |
- |
SC |
300 |
R2 |
27-OCT-2024 |
- |
- |
- |
Land in Possession of Company |
1124 |
36 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 72 |
62305 |
M/s GURU INDUSTRIES |
19-FEB-2021 |
24-MAR-2021 |
07-OCT-2021 |
22-MAR-2022 |
312,900.00
|
156,450.00 |
156,450.00 |
39,113.00 |
0.00 |
- |
39,113.00 |
Lease Deed(AR 2020) |
- |
SC,Women |
300 |
R2 |
21-MAR-2024 |
- |
05-OCT-2024 |
- |
Land in Possession of Company |
1123 |
37 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 58 |
62309 |
CORUS INDUSTRIES |
19-FEB-2021 |
24-MAR-2021 |
06-SEP-2021 |
22-DEC-2021 |
312,900.00
|
156,450.00 |
156,450.00 |
156,450.00 |
57.00 |
29-FEB-2024 |
156,393.00 |
Lease Deed(AR 2020) |
- |
SC,Women |
300 |
R2 |
21-DEC-2024 |
- |
- |
- |
Land in Possession of Company |
1123 |
38 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 92 |
62319 |
CHANDANA INDUSTRIES |
19-FEB-2021 |
23-MAR-2021 |
07-OCT-2021 |
22-MAR-2022 |
312,900.00
|
0.00 |
312,900.00 |
156,450.00 |
0.00 |
- |
156,450.00 |
Lease Deed(AR 2020) |
- |
BC,Women |
300 |
R2 |
21-MAR-2024 |
- |
05-OCT-2024 |
- |
Land in Possession of Company |
1124 |
39 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 95 |
62333 |
JYOTHI POLYMERS |
19-FEB-2021 |
23-MAR-2021 |
07-OCT-2021 |
22-MAR-2022 |
312,900.00
|
0.00 |
312,900.00 |
156,450.00 |
0.00 |
- |
156,450.00 |
Lease Deed(AR 2020) |
- |
BC,Women |
300 |
R2 |
21-MAR-2024 |
- |
05-OCT-2024 |
- |
Land in Possession of Company |
1124 |
40 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 56 |
62335 |
RATHNA INDUSTRIES |
19-FEB-2021 |
23-MAR-2021 |
30-JUN-2021 |
28-OCT-2021 |
312,900.00
|
156,450.00 |
156,450.00 |
156,450.00 |
0.00 |
- |
156,450.00 |
Lease Deed(AR 2020) |
- |
SC,Women |
300 |
R2 |
27-OCT-2024 |
- |
- |
- |
Land in Possession of Company |
1124 |
41 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 53 |
62341 |
S R POLYMERS |
19-FEB-2021 |
23-MAR-2021 |
07-OCT-2021 |
22-MAR-2022 |
312,900.00
|
156,450.00 |
156,450.00 |
39,113.00 |
0.00 |
- |
39,113.00 |
Lease Deed(AR 2020) |
- |
SC |
300 |
R2 |
21-MAR-2025 |
- |
- |
- |
Land in Possession of Company |
1124 |
42 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 49 |
62344 |
RS MOULDS & TECHNOLOGY |
19-FEB-2021 |
23-MAR-2021 |
28-JUN-2021 |
28-DEC-2021 |
312,900.00
|
156,450.00 |
156,450.00 |
156,450.00 |
50.00 |
29-FEB-2024 |
156,400.00 |
Lease Deed(AR 2020) |
- |
SC |
300 |
R2 |
27-DEC-2024 |
- |
- |
- |
Land in Possession of Company |
1124 |
43 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 121 |
62360 |
JD MEN AND WOMEN GARMENTS |
19-FEB-2021 |
23-MAR-2021 |
28-JUN-2021 |
22-DEC-2021 |
484,995.00
|
0.00 |
484,995.00 |
484,995.00 |
28,086.00 |
29-FEB-2024 |
456,909.00 |
Lease Deed(AR 2020) |
- |
BC,Women |
465 |
R2 |
21-DEC-2023 |
- |
05-OCT-2024 |
- |
Land in Possession of Company |
1124 |
44 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 19 |
62359 |
SRI ANJANEYAM ENTERPRISES |
19-FEB-2021 |
23-MAR-2021 |
16-JUL-2021 |
28-OCT-2021 |
843,787.00
|
421,894.00 |
421,893.00 |
421,893.00 |
0.00 |
- |
421,893.00 |
Lease Deed(AR 2020) |
- |
ST |
809 |
R2 |
27-OCT-2024 |
- |
- |
- |
Land in Possession of Company |
1124 |
45 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 81 |
62361 |
M/S GOUTHAM FURNITURE INDUSTRY |
19-FEB-2021 |
24-MAR-2021 |
02-JUL-2021 |
28-OCT-2021 |
312,900.00
|
156,450.00 |
156,450.00 |
156,450.00 |
10.00 |
28-FEB-2024 |
156,440.00 |
Lease Deed(AR 2020) |
- |
ST,Women |
300 |
R2 |
27-OCT-2024 |
- |
- |
- |
Land in Possession of Company |
1123 |
46 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 80 |
62369 |
M/s Z/N LEATHER INDUSTRY |
19-FEB-2021 |
23-MAR-2021 |
28-JUN-2021 |
28-OCT-2021 |
312,900.00
|
156,450.00 |
156,450.00 |
156,450.00 |
0.00 |
- |
156,450.00 |
Lease Deed(AR 2020) |
- |
ST,Women |
300 |
R2 |
27-OCT-2024 |
- |
- |
- |
Land in Possession of Company |
1124 |
47 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 60,PLOT NO- 61 |
62436 |
M/S VISWAS AUTOMBILES |
19-FEB-2021 |
22-MAR-2021 |
03-MAY-2021 |
28-OCT-2021 |
625,800.00
|
312,900.00 |
312,900.00 |
312,900.00 |
0.00 |
- |
312,900.00 |
Lease Deed(AR 2020) |
- |
SC |
600 |
R2 |
27-OCT-2024 |
- |
- |
- |
Land in Possession of Company |
1125 |
48 |
KURNOOL |
Kurnool |
MSME-BRAHMANAPALLI |
PLOT NO- 96 |
62454 |
SRI VENKATESWARA INDUSTRIES |
19-FEB-2021 |
23-MAR-2021 |
30-JUN-2021 |
28-OCT-2021 |
312,900.00
|
0.00 |
312,900.00 |
312,900.00 |
0.00 |
- |
312,900.00 |
Lease Deed(AR 2020) |
- |
BC |
300 |
R2 |
27-OCT-2023 |
- |
05-OCT-2024 |
- |
Land in Possession of Company |
1124 |
49 |
KURNOOL |
Nandyal |
IE-NANDYAL |
PLOT B2/A |
9858 |
DURGA METAL WORKS |
28-MAR-1991 |
28-MAR-1991 |
30-MAR-1991 |
16-MAY-1974 |
34,096.00
|
- |
- |
34,096.00 |
0.00 |
- |
34,096.00 |
Sale Agreement(Lease Deed) |
- |
Others |
975 |
G4 |
28-MAR-1993 |
- |
- |
- |
Issue is pending due to court case between the partners and also in legal heirs. |
12077 |
50 |
KURNOOL |
Nandyal |
IP-Cherlopalli (UDL) |
UDL |
63385 |
THE RAMCO CEMENTS LIMITED |
07-FEB-2022 |
16-MAR-2022 |
30-MAR-2022 |
20-APR-2022 |
1,090,936.00
|
0.00 |
1,090,936.00 |
1,090,936.00 |
0.00 |
- |
1,090,936.00 |
Lease Deed(AR 2020) |
- |
General |
2024 |
G4 |
19-APR-2024 |
- |
- |
- |
Under Construction |
766 |
51 |
KURNOOL |
Nandyal |
IP-Racherla |
Sy. No- 1089,Sy. No- 116/1,Sy. No- 116/2,Sy. No- 253/2,Sy. No- 287,Sy. No- 33/7,Sy. No- 50/1,Sy. No- 50/2,Sy. No- 53/5,Sy. No- 53/6,Sy. No- 54/4 |
62747 |
Rain Cements Limited |
20-MAY-2021 |
20-MAY-2021 |
15-JUL-2021 |
09-AUG-2021 |
18,779,890.00
|
0.00 |
18,779,890.00 |
18,779,890.00 |
0.00 |
- |
18,779,890.00 |
Lease Deed(AR 2020) |
- |
General |
105505 |
G4 |
08-AUG-2024 |
- |
- |
- |
Under Construction |
1066 |
52 |
KURNOOL |
Nandyal |
IP-KurnoolUltraMegaFoodPark |
Thangadancha UDL-2 |
52340 |
M/s. Jain Irrigation Sysytems Limited |
30-MAY-2016 |
30-MAY-2016 |
28-APR-2017 |
03-JUN-2017 |
311,700,000.00
|
0.00 |
311,700,000.00 |
311,700,000.00 |
0.00 |
- |
311,700,000.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
General |
2522900 |
G4 |
02-JUN-2021 |
- |
- |
21-DEC-2021 |
Referred to HO for examination as implementation period is completed and allotted through GO. HO orders awaited. |
2882 |
53 |
KURNOOL |
Nandyal |
UDL-THANGADANCHA |
UDL-5 |
64297 |
IDHYAH AGRI CROP SCIENCES PRIVATE LIMITED |
01-MAR-2023 |
02-MAR-2023 |
11-MAY-2023 |
02-JUN-2023 |
10,906,665.00
|
0.00 |
10,906,665.00 |
10,906,665.00 |
0.00 |
- |
10,906,665.00 |
Lease Deed(AR 2020) |
- |
General |
28329 |
R2 |
01-JUN-2026 |
- |
- |
- |
Land in Possession of Company |
415 |
54 |
KURNOOL |
Nandyal |
MSME_ITIKYALA |
PLOT NO -5,PLOT NO -6 |
60094 |
M/S UTTAM PAINTS INDUSTRY |
19-AUG-2019 |
19-AUG-2019 |
25-NOV-2019 |
30-DEC-2019 |
1,713,360.00
|
0.00 |
1,713,360.00 |
1,713,360.00 |
0.00 |
- |
1,713,360.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
SC,Women |
2640 |
R1 |
29-DEC-2022 |
- |
- |
20-DEC-2022 |
Land in possession of company |
1706 |
55 |
KURNOOL |
Nandyal |
MSME_ITIKYALA |
PLOT NO -55,PLOT NO -56 |
60703 |
M/S AADHYA INDUSTRY |
25-NOV-2019 |
25-NOV-2019 |
07-FEB-2020 |
23-JUN-2020 |
389,400.00
|
194,700.00 |
194,700.00 |
194,700.00 |
0.00 |
- |
194,700.00 |
Sale Agreement(Lease Deed) |
- |
SC |
600 |
R2 |
22-JUN-2023 |
- |
- |
- |
Land in Possession of Company |
1608 |
56 |
KURNOOL |
Nandyal |
MSME_ITIKYALA |
PLOT NO -11 |
61707 |
M/S ARUNA AGRO INDUSTRIES |
29-APR-2020 |
29-APR-2020 |
03-AUG-2020 |
30-SEP-2020 |
856,680.00
|
0.00 |
856,680.00 |
856,680.00 |
0.00 |
- |
856,680.00 |
Sale Agreement(Lease Deed) |
Notice Issued |
BC,Women |
1320 |
R2 |
29-SEP-2022 |
- |
- |
14-OCT-2022 |
Implementation period is completed. Requested to apply for EoT vide Letter Dt: 14-10-2022 |
1452 |
57 |
KURNOOL |
Nandyal |
UDL-GIDDALURU |
UDL-1 |
63390 |
THE RAMCO CEMENTS LIMITED |
07-FEB-2022 |
14-AUG-2023 |
13-SEP-2023 |
28-APR-2022 |
8,840,170.00
|
0.00 |
8,840,170.00 |
8,840,170.00 |
0.00 |
- |
8,840,170.00 |
Final Allotment |
- |
General |
59330 |
G4 |
27-APR-2025 |
- |
- |
- |
Civil works commenced |
250 |
58 |
KURNOOL |
Nandyal |
UDL-KANALA |
UDL-1 |
63389 |
THE RAMCO CEMENTS LIMITED |
07-FEB-2022 |
14-AUG-2023 |
13-SEP-2023 |
28-APR-2022 |
31,320,576.00
|
0.00 |
31,320,576.00 |
31,320,576.00 |
0.00 |
- |
31,320,576.00 |
Final Allotment |
- |
General |
139824 |
G4 |
27-APR-2025 |
- |
- |
- |
Civil works commenced |
250 |
59 |
KURNOOL |
Nandyal |
UDL-MANGAPALLE |
UDL-1 |
63392 |
THE RAMCO CEMENTS LIMITED |
07-FEB-2022 |
14-AUG-2023 |
13-SEP-2023 |
28-APR-2022 |
7,554,096.00
|
0.00 |
7,554,096.00 |
7,554,096.00 |
0.00 |
- |
7,554,096.00 |
Final Allotment |
- |
General |
49698 |
G4 |
27-APR-2025 |
- |
- |
- |
Civil works commenced |
250 |
60 |
KURNOOL |
Nandyal |
UDL-SANJAMALA |
UDL-1 |
63391 |
THE RAMCO CEMENTS LIMITED |
07-FEB-2022 |
14-AUG-2023 |
13-SEP-2023 |
28-APR-2022 |
24,148,576.00
|
0.00 |
24,148,576.00 |
24,148,576.00 |
0.00 |
- |
24,148,576.00 |
Final Allotment |
- |
General |
107327 |
G4 |
27-APR-2025 |
- |
- |
- |
Civil works commenced |
250 |