S.No  |  DISTRICT  |  ZONE  |  INDUSTRIAL PARK  |  PLOT NO  |  ALLOTMENT NUMBER  |  NAME OF THE INDUSTRY  |  ALLOTMENT DATE  |  PROVISIONAL ALLOTMENT DATE  |  FINAL ALLOTMENT DATE  |  DATE OF PHYSICAL POSSESSION  |  ALLOTMENT VALUE  |  REBATE AMOUNT  |  NET ALLOTMENT VALUE  |  ADVANCE TO BE PAID  |  AMOUNT RECEIVED  |  LAST PAID DATE  |  BALANCE ADVANCE AMOUNT  |  STATUS OF ALLOTMENT  |  CANCELLATION  |  CATEGORY OF ALLOTMENT  |  EXTENT IN SQM  |  IMPLEMENTATION STATUS CODE NEW  |  IMPLEMENTATION DUE DATE  |  DCP DATE  |  EOT PERIOD  |  NOTICE ISSUED DATE  |  IMPL ZM REMARKS  |  ALLOTMENT AGE IN DAYS  |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
PUTTAPARTHY |
Anantapur |
IP_GOOTY |
126,127 |
24851 |
APCPDCL |
27-JAN-2010 |
27-JAN-2010 |
- |
- |
1,000.00
|
- |
- |
1,000.00 |
0.00 |
- |
1,000.00 |
Provisional Allotment |
Notice Issued |
Others |
2425 |
G1 |
- |
29-OCT-2010 |
- |
08-AUG-2022 |
Sub Station Implemented and Working on Lease Basis.Notice issued for execution of Lease Deed. |
5175 |
2 |
PUTTAPARTHY |
Anantapur |
IP-RAPTHADU |
PLOT-3 |
65267 |
ANANTHA BIOTECHNOLOGIES & ALLIED INDUSTRIES PRIVATE LIMITED |
22-DEC-2023 |
23-DEC-2023 |
- |
- |
25,462,680.00
|
0.00 |
25,462,680.00 |
25,462,680.00 |
12,616,247.00 |
22-MAR-2024 |
12,846,433.00 |
Provisional Allotment |
- |
General |
12668 |
NA |
- |
- |
- |
- |
Provisional Allotment orders issued on 23.12.2023 |
97 |
3 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
174,175 |
51501 |
M/S JAHNAVI RUBBER INDUSTRY |
03-APR-2023 |
03-APR-2023 |
- |
- |
607,657.00
|
303,828.00 |
303,829.00 |
303,829.00 |
0.00 |
- |
303,829.00 |
Provisional Allotment |
Notice Issued |
ST |
829 |
NA |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment orders issued as per Go Ms No 7 on 03.04.2023.Notice issued for payment of balance land cost. |
361 |
4 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
130,131 |
57488 |
MALLIKARJUNA GRANITE TILES |
13-APR-2023 |
13-APR-2023 |
- |
- |
439,800.00
|
219,900.00 |
219,900.00 |
219,900.00 |
0.00 |
- |
219,900.00 |
Provisional Allotment |
Notice Issued |
ST |
600 |
NA |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment orders issued as per Go Ms No 7.Notice issued for payment of balance land cost. |
351 |
5 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
163,164 |
59075 |
MAHIMA PAPER PLATE INDUTRY |
13-APR-2023 |
13-APR-2023 |
- |
- |
505,770.00
|
252,885.00 |
252,885.00 |
252,885.00 |
0.00 |
- |
252,885.00 |
Provisional Allotment |
Notice Issued |
SC |
690 |
NA |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment orders issued as per Go Ms No 7 on 13.04.2023.Notice issued for payment of balance land cost |
351 |
6 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
231 |
59104 |
Mohan |
03-AUG-2022 |
03-AUG-2022 |
- |
- |
219,900.00
|
109,950.00 |
109,950.00 |
109,950.00 |
0.00 |
- |
109,950.00 |
Provisional Allotment |
Notice Issued |
SC |
300 |
NA |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment orders issued as per GO Ms No 7 |
604 |
7 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
237 |
59111 |
M/S SIMHA PLSTIC INDUSTRIES |
03-AUG-2022 |
03-AUG-2022 |
- |
- |
219,900.00
|
109,950.00 |
109,950.00 |
109,950.00 |
0.00 |
- |
109,950.00 |
Provisional Allotment |
Notice Issued |
SC |
300 |
NA |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment orders issued as per Go Ms No 7 on 03.08.2022.Notice issued for payment of balance land cost. |
604 |
8 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
Plot-50 |
59115 |
M/S HEMANTH GARMENTS |
03-AUG-2022 |
03-AUG-2022 |
- |
- |
219,900.00
|
109,950.00 |
109,950.00 |
109,950.00 |
0.00 |
- |
109,950.00 |
Provisional Allotment |
Notice Issued |
SC |
300 |
NA |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment orders issued as per GO Ms No 7 on Dt:03.08.2022 |
604 |
9 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
121 |
59166 |
blvs traders |
03-AUG-2022 |
03-AUG-2022 |
- |
- |
219,900.00
|
109,950.00 |
109,950.00 |
109,950.00 |
0.00 |
- |
109,950.00 |
Provisional Allotment |
Notice Issued |
SC |
300 |
NA |
31-MAR-2025 |
- |
- |
26-NOV-2022 |
Re Allotment Orders issued as per GO Ms.No 7 |
604 |
10 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
238 |
59168 |
sai venkata sai enterprises |
03-AUG-2022 |
03-AUG-2022 |
- |
- |
219,900.00
|
109,950.00 |
109,950.00 |
109,950.00 |
0.00 |
- |
109,950.00 |
Provisional Allotment |
Notice Issued |
SC |
300 |
NA |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment orders issued as per GO Ms No 7 on 03.08.2022.Notice issued for payment of balance land cost |
604 |
11 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
82 |
59256 |
M/s UMA DEVI INDUSTRIES |
03-AUG-2022 |
03-AUG-2022 |
- |
- |
219,900.00
|
109,950.00 |
109,950.00 |
109,950.00 |
0.00 |
- |
109,950.00 |
Provisional Allotment |
Notice Issued |
SC |
300 |
NA |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment orders issued as per GO Ms No 7.Notice issued for payment of balance land cost. |
604 |
12 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
99 |
59854 |
sri lakshmi balaji projects |
03-AUG-2022 |
03-AUG-2022 |
- |
- |
219,900.00
|
109,950.00 |
109,950.00 |
109,950.00 |
0.00 |
- |
109,950.00 |
Provisional Allotment |
Notice Issued |
ST |
300 |
NA |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment Orders issued as per GO Ms.No 7 on 03.08.2022.Notice issued for payment of land cost. |
604 |
13 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
75 |
59855 |
vedha paper products |
03-AUG-2022 |
03-AUG-2022 |
- |
- |
219,900.00
|
109,950.00 |
109,950.00 |
109,950.00 |
1,180.00 |
29-FEB-2024 |
108,770.00 |
Provisional Allotment |
Notice Issued |
ST |
300 |
NA |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment orders issued as per Go Ms No 7 on 03.08.2022.Notice issued for payment of balance land cost. |
604 |
14 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
221 |
59857 |
ramavath industries |
03-AUG-2022 |
03-AUG-2022 |
- |
- |
280,739.00
|
140,370.00 |
140,369.00 |
140,369.00 |
0.00 |
- |
140,369.00 |
Provisional Allotment |
Notice Issued |
ST |
383 |
NA |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment orders issued as per GO Ms No 7 Dt:03.08.2022 |
604 |
15 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
206 |
60064 |
RAJU INDUSTRIES |
03-AUG-2022 |
03-AUG-2022 |
- |
- |
274,875.00
|
137,438.00 |
137,437.00 |
137,437.00 |
0.00 |
- |
137,437.00 |
Provisional Allotment |
Notice Issued |
SC |
375 |
NA |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment orders issued as per GO Ms No 7 |
604 |
16 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
104 |
60159 |
UMESH INDUSTRIES |
23-NOV-2022 |
23-NOV-2022 |
- |
- |
246,300.00
|
123,150.00 |
123,150.00 |
123,150.00 |
55,000.00 |
29-FEB-2024 |
68,150.00 |
Provisional Allotment |
Notice Issued |
SC |
300 |
NA |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment orders issued as per GO Ms No 7.Notice issued for payment of balance land cost. |
492 |
17 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
28A,28B,77A,77B |
60768 |
M/s GANESH GRANITES |
03-AUG-2022 |
03-AUG-2022 |
- |
- |
492,600.00
|
246,300.00 |
246,300.00 |
246,300.00 |
130,000.00 |
29-FEB-2024 |
116,300.00 |
Provisional Allotment |
Notice Issued |
SC |
600 |
NA |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment Orders issued as per GO Ms.No 7 |
604 |
18 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
142,143 |
60774 |
KK DESIGN TILES |
03-APR-2023 |
03-APR-2023 |
- |
- |
439,800.00
|
219,900.00 |
219,900.00 |
219,900.00 |
0.00 |
- |
219,900.00 |
Provisional Allotment |
Notice Issued |
SC |
600 |
NA |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment orders issued as per Go Ms No 7 on 03.04.2023.Notice issued for payment of balance land cost. |
361 |
19 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
150,151 |
61666 |
M/s PHOENIX MANUFACTURES |
03-AUG-2022 |
03-AUG-2022 |
- |
- |
492,600.00
|
246,300.00 |
246,300.00 |
246,300.00 |
0.00 |
- |
246,300.00 |
Provisional Allotment |
Notice Issued |
SC |
600 |
NA |
31-MAR-2025 |
- |
- |
30-AUG-2023 |
Re Allotment orders issued as per GO Ms No 7 |
604 |
20 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
Plot-52 |
64619 |
GiriPriya Industries |
23-JUN-2023 |
27-JUN-2023 |
- |
- |
999,868.00
|
0.00 |
999,868.00 |
999,868.00 |
0.00 |
- |
999,868.00 |
Provisional Allotment |
Notice Issued |
BC |
661 |
NA |
- |
- |
- |
01-SEP-2023 |
Notice issued for payment of balance land cost with intrest. |
276 |
21 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
25 |
64988 |
JOYA AGARBATTI INSENCE STICKS |
20-NOV-2023 |
22-NOV-2023 |
- |
- |
444,900.00
|
0.00 |
444,900.00 |
222,450.00 |
44,490.00 |
29-FEB-2024 |
177,960.00 |
Provisional Allotment |
- |
BC,Women |
300 |
NA |
- |
- |
- |
- |
Provisional Allotment orders issued on 22.11.2023 |
128 |
22 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
286,293,294 |
65007 |
M/s.Naganandeswara Swamy Manufacturing |
20-NOV-2023 |
22-NOV-2023 |
- |
- |
1,361,394.00
|
680,697.00 |
680,697.00 |
170,174.00 |
0.00 |
- |
170,174.00 |
Land Cost Paid |
- |
SC |
900 |
NA |
- |
- |
- |
- |
Provisional Allotment orders issued on 22.11.2023 |
128 |
23 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
246,247,248 |
65116 |
RAJESWARI INDUSTRIES |
20-NOV-2023 |
22-NOV-2023 |
- |
- |
1,334,700.00
|
0.00 |
1,334,700.00 |
667,350.00 |
177,960.00 |
29-FEB-2024 |
489,390.00 |
Provisional Allotment |
Notice Issued |
BC |
900 |
NA |
- |
- |
- |
14-FEB-2024 |
Provisional Allotment orders issued on 22.11.2023 |
128 |
24 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
Plot-48,Plot-49 |
65117 |
ATTAR INDUSTRIES |
20-NOV-2023 |
22-NOV-2023 |
- |
- |
907,596.00
|
0.00 |
907,596.00 |
453,798.00 |
0.00 |
- |
453,798.00 |
Land Cost Paid |
- |
BC |
600 |
NA |
- |
- |
- |
- |
Provisional Allotment orders issued on 22.11.2023 |
128 |
25 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
29 |
65290 |
Pavani Garments Making |
22-DEC-2023 |
23-DEC-2023 |
- |
- |
444,900.00
|
222,450.00 |
222,450.00 |
55,613.00 |
0.00 |
- |
55,613.00 |
Provisional Allotment |
- |
SC |
300 |
NA |
- |
- |
- |
- |
Provisional Allotment orders issued on 23.12.2023 |
97 |
26 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
160,plot-159 |
65297 |
M/s.Anu Packs |
22-DEC-2023 |
23-DEC-2023 |
- |
- |
1,023,270.00
|
0.00 |
1,023,270.00 |
511,635.00 |
0.00 |
- |
511,635.00 |
Land Cost Paid |
- |
Women,General |
690 |
NA |
- |
- |
- |
- |
Provisional Allotment orders issued on 23.12.2023 |
97 |
27 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
Plot-262,Plot-273 |
65454 |
M/S. GEETANJALI INDUSTRIES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
1,370,292.00
|
0.00 |
1,370,292.00 |
342,573.00 |
0.00 |
- |
342,573.00 |
Provisional Allotment |
- |
NA |
880 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
28 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
18A,19 |
65521 |
KSB Group |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
907,596.00
|
0.00 |
907,596.00 |
453,798.00 |
88,980.00 |
29-FEB-2024 |
364,818.00 |
Provisional Allotment |
- |
NA |
450 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
29 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
Plot-97A,Plot-97B,Plot-97B |
65549 |
J.N.ECO PRODUCTS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
453,798.00
|
0.00 |
453,798.00 |
226,899.00 |
44,490.00 |
29-FEB-2024 |
182,409.00 |
Provisional Allotment |
- |
NA |
450 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
30 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
103 |
65551 |
AKSHAYA SWARNA CATTLE FEED |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
444,900.00
|
0.00 |
444,900.00 |
444,900.00 |
44,490.00 |
29-FEB-2024 |
400,410.00 |
Provisional Allotment |
- |
NA |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
31 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
88B,89 |
65552 |
M/S SAHITHI ENTERPRISES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
907,596.00
|
453,798.00 |
453,798.00 |
113,450.00 |
0.00 |
- |
113,450.00 |
Provisional Allotment |
- |
NA |
450 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
32 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
146,147,148,149 |
65561 |
M/s.Aerobit Industries |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
1,779,600.00
|
0.00 |
1,779,600.00 |
889,800.00 |
0.00 |
- |
889,800.00 |
Provisional Allotment |
- |
NA |
1200 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
33 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
263 |
65578 |
S N INDUSTRIES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
544,557.62
|
272,279.00 |
272,278.59 |
68,070.00 |
0.00 |
- |
68,070.00 |
Provisional Allotment |
- |
ST |
360 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
34 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
196,197,198,199 |
65852 |
SHREEKANTH TEXTILES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
2,780,625.00
|
0.00 |
2,780,625.00 |
695,156.00 |
0.00 |
- |
695,156.00 |
Provisional Allotment |
- |
SC,Others |
1500 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
35 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
15,16,17 |
65879 |
SISIRA ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,361,394.00
|
680,697.00 |
680,697.00 |
170,174.00 |
0.00 |
- |
170,174.00 |
Provisional Allotment |
- |
ST,Technocrat |
900 |
NA |
- |
- |
- |
- |
Provisional Allotmet orders issued on 16.03.2024 |
14 |
36 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
2,3 |
65887 |
SAANVI ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
889,800.00
|
0.00 |
889,800.00 |
889,800.00 |
88,980.00 |
29-FEB-2024 |
800,820.00 |
Provisional Allotment |
- |
General,Technocrat |
600 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
37 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
4 |
65889 |
FORTUNE ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
444,900.00
|
0.00 |
444,900.00 |
222,450.00 |
44,490.00 |
29-FEB-2024 |
177,960.00 |
Provisional Allotment |
- |
General,Technocrat |
300 |
NA |
- |
- |
- |
- |
Provisional Allotment orders issued on 16.03.2024 |
14 |
38 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
Plot-26,Plot-27B,Plot-27B |
65898 |
SRI RAMA DHUTHA INDUSTRIES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
667,350.00
|
0.00 |
667,350.00 |
166,838.00 |
0.00 |
- |
166,838.00 |
Provisional Allotment |
- |
SC,Technocrat |
600 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
39 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
Plot-8 |
65913 |
SRH INDUSTRIES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
453,798.00
|
0.00 |
453,798.00 |
453,798.00 |
44,490.00 |
29-FEB-2024 |
409,308.00 |
Provisional Allotment |
- |
General,Others |
300 |
NA |
- |
- |
- |
- |
Provisional Allotment orders issued on 16.03.2024 |
14 |
40 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
234 |
65912 |
AVS MODULAR INTERIORS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
665,570.38
|
0.00 |
665,570.38 |
332,785.00 |
65,252.00 |
29-FEB-2024 |
267,533.00 |
Provisional Allotment |
- |
General,Technocrat |
440 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
41 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
219,220 |
65940 |
kamal Industries |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,192,332.00
|
596,166.00 |
596,166.00 |
149,042.00 |
0.00 |
- |
149,042.00 |
Provisional Allotment |
- |
SC |
804 |
NA |
- |
- |
- |
- |
Provisional Allotment orders issued on 16.03.2024 |
14 |
42 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-313 |
58845 |
M/s. Nagaraju Automobiles |
03-FEB-2014 |
03-FEB-2014 |
- |
- |
3,690.00
|
0.00 |
3,690.00 |
3,690.00 |
0.00 |
- |
3,690.00 |
Sale Agreement(Lease Deed) |
- |
General |
123 |
G1 |
08-JUN-2017 |
- |
- |
- |
Company has gone in to the production |
3707 |
43 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-314 |
58887 |
M/s. Imthiyaz Tinkering Works |
03-FEB-2014 |
03-FEB-2014 |
- |
- |
3,690.00
|
0.00 |
3,690.00 |
3,690.00 |
0.00 |
- |
3,690.00 |
Sale Agreement(Lease Deed) |
- |
General |
123 |
G1 |
05-JUN-2017 |
- |
- |
- |
Working |
3707 |
44 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-263 |
59024 |
RA Abdul Sattar |
01-MAR-2017 |
01-MAR-2017 |
- |
- |
4,830.00
|
0.00 |
4,830.00 |
4,830.00 |
0.00 |
- |
4,830.00 |
Provisional Allotment |
- |
General |
161 |
G1 |
26-MAR-2020 |
- |
- |
- |
Working |
2585 |
45 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-190 |
59022 |
THALHA |
01-MAR-2017 |
01-MAR-2017 |
- |
- |
7,230.00
|
0.00 |
7,230.00 |
7,230.00 |
0.00 |
- |
7,230.00 |
Sale Agreement(Lease Deed) |
- |
General |
241 |
G1 |
26-MAR-2020 |
- |
- |
- |
Working |
2585 |
46 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-136A |
59021 |
M/S MALIKA AUTO GARAGE |
01-MAR-2017 |
01-MAR-2017 |
- |
- |
7,860.00
|
0.00 |
7,860.00 |
7,860.00 |
0.00 |
- |
7,860.00 |
Provisional Allotment |
- |
General |
262 |
G1 |
26-MAR-2020 |
- |
- |
- |
Working |
2585 |
47 |
PUTTAPARTHY |
Sri Sathya Sai |
IP_HDP_LAO_ANASSOCIATION |
PLOT-85B |
59015 |
TURN-O-WELD ENGINEERING WORKS |
01-MAR-2017 |
01-MAR-2017 |
- |
- |
8,160.00
|
0.00 |
8,160.00 |
8,160.00 |
0.00 |
- |
8,160.00 |
Provisional Allotment |
- |
General |
272 |
G1 |
26-MAR-2020 |
- |
- |
- |
Working |
2585 |
48 |
PUTTAPARTHY |
Sri Sathya Sai |
Gollapuram_UDL |
UDL S.No.232/4 |
65280 |
SRI ANJANADRI INDUSTRIES |
22-DEC-2023 |
23-DEC-2023 |
- |
- |
3,375,615.00
|
0.00 |
3,375,615.00 |
1,687,808.00 |
1,210,000.00 |
22-MAR-2024 |
477,808.00 |
Provisional Allotment |
- |
BC |
4857 |
NA |
26-DEC-2025 |
- |
- |
13-FEB-2024 |
Notice issued for payment of land cost on Dt:13.02.2024. |
97 |
49 |
PUTTAPARTHY |
Sri Sathya Sai |
Gudipalli-UDL |
UDL-6 |
65933 |
PIONEER POLYLEATHERS PRIVATE LIMITED |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
180,786,016.00
|
0.00 |
180,786,016.00 |
180,786,016.00 |
18,078,602.00 |
29-FEB-2024 |
162,707,424.00 |
Provisional Allotment |
- |
General,Technocrat |
200206 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
50 |
PUTTAPARTHY |
Sri Sathya Sai |
IP GUDIPALLI |
Plot-81 |
65322 |
TYCHE ALPHA AUTOMOTIVE PVT LTD |
22-DEC-2023 |
23-DEC-2023 |
- |
- |
25,029,000.00
|
0.00 |
25,029,000.00 |
12,514,500.00 |
0.00 |
- |
12,514,500.00 |
Provisional Allotment |
- |
General |
12150 |
NA |
26-DEC-2025 |
- |
- |
- |
Provisional Allotment Orders issued on Dt:23.12.2023 |
97 |
51 |
PUTTAPARTHY |
Sri Sathya Sai |
IP GUDIPALLI |
Plto-12(Commercial) |
65959 |
VK HVAC SYSTEMS SERVICES PRIVATE LIMITED |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
16,979,550.00
|
0.00 |
16,979,550.00 |
16,979,550.00 |
1,617,100.00 |
29-FEB-2024 |
15,362,450.00 |
Provisional Allotment |
- |
bcOther |
7851 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
52 |
PUTTAPARTHY |
Sri Sathya Sai |
IP GUDIPALLI |
Plot-13,Plot-18 |
65883 |
PUNGJINSOLUTIONINDIAPRIVATELIMITED |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
34,014,224.00
|
0.00 |
34,014,224.00 |
34,014,224.00 |
3,334,728.00 |
29-FEB-2024 |
30,679,498.00 |
Provisional Allotment |
- |
General,Others |
16188 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
53 |
PUTTAPARTHY |
Sri Sathya Sai |
IP GUDIPALLI |
Plot-38,Plot-39,Plot-40,Plot-41 |
65892 |
Jindal Pex Tubes Pvt Ltd |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
40,137,040.00
|
0.00 |
40,137,040.00 |
20,068,520.00 |
4,013,704.00 |
29-FEB-2024 |
16,054,816.00 |
Provisional Allotment |
- |
General,Others |
19484 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
54 |
PUTTAPARTHY |
Sri Sathya Sai |
IP-R.Anantapur |
Plot 10,Plot 11,Plot 7,Plot 8,Plot 9 |
65884 |
rRGEOCYCLE(iNDIA)PRIVATELIMITED |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
2,463,692.00
|
0.00 |
2,463,692.00 |
2,463,692.00 |
246,370.00 |
29-FEB-2024 |
2,217,322.00 |
Provisional Allotment |
- |
General,Others |
11788 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
55 |
PUTTAPARTHY |
Sri Sathya Sai |
Kappalabanda-MSME |
Plot-159 |
65452 |
KARTHIKEYA PET BOTTLES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
521,400.00
|
0.00 |
521,400.00 |
521,400.00 |
452,140.00 |
27-MAR-2024 |
69,260.00 |
Provisional Allotment |
- |
NA |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
56 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
18 |
59143 |
SSN KRISTAPPA |
02-AUG-2022 |
02-AUG-2022 |
- |
- |
261,375.00
|
130,687.00 |
130,688.00 |
130,688.00 |
0.00 |
- |
130,688.00 |
Provisional Allotment |
NA |
SC |
375 |
NA |
31-MAR-2025 |
- |
- |
16-FEB-2024 |
Re -Allotment orders issued as per Go.Ms.No.7 on Dt:02.08.2022 & Reminder Notice Issued for Payment of Land cost Dt:16.02.2024. |
605 |
57 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
61,62 |
59241 |
Smt. V. Sudha |
02-AUG-2022 |
02-AUG-2022 |
- |
- |
418,200.00
|
209,100.00 |
209,100.00 |
209,100.00 |
0.00 |
- |
209,100.00 |
Provisional Allotment |
NA |
SC |
600 |
NA |
31-MAR-2025 |
- |
- |
- |
Reallotment Orders issued as per Go.Ms.No.7 Dt:02.08.2022 |
605 |
58 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
251,252 |
58445 |
PREM SAI CEMENT BRICKS |
02-AUG-2022 |
02-AUG-2022 |
- |
- |
418,200.00
|
209,100.00 |
209,100.00 |
209,100.00 |
0.00 |
- |
209,100.00 |
Provisional Allotment |
NA |
SC |
600 |
NA |
31-MAR-2025 |
- |
- |
19-FEB-2024 |
Re -Allotment orders issued as per Go.Ms.No.7 on Dt:02.08.2022 & Reminder Notice Issued for Payment of Land cost Dt:19.02.2024. |
605 |
59 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
254,255 |
58442 |
M/s. Sri Balaji Enterprises |
02-AUG-2022 |
02-AUG-2022 |
- |
- |
736,032.00
|
368,016.00 |
368,016.00 |
368,016.00 |
0.00 |
- |
368,016.00 |
Provisional Allotment |
NA |
SC |
1056 |
NA |
31-MAR-2025 |
- |
- |
- |
Re -Allotment orders issued as per Go.Ms.No.7 on Dt:02.08.2022 . |
605 |
60 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
149 |
59895 |
DHANVISREE ENTERPRISES |
02-AUG-2022 |
02-AUG-2022 |
- |
- |
209,100.00
|
104,550.00 |
104,550.00 |
104,550.00 |
0.00 |
- |
104,550.00 |
Provisional Allotment |
NA |
SC |
300 |
NA |
31-MAR-2025 |
- |
- |
19-FEB-2024 |
Re -Allotment orders issued as per Go.Ms.No.7 on Dt:02.08.2022 & Reminder Notice Issued for Payment of Land cost Dt:19.02.2024. |
605 |
61 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
72,73 |
60792 |
M/s. Shree Rajeswary Agro Extractions |
02-AUG-2022 |
02-AUG-2022 |
- |
- |
418,200.00
|
209,100.00 |
209,100.00 |
209,100.00 |
0.00 |
- |
209,100.00 |
Provisional Allotment |
NA |
SC |
600 |
NA |
31-MAR-2025 |
- |
- |
19-FEB-2024 |
Re -Allotment orders issued as per Go.Ms.No.7 on Dt:02.08.2022 & Reminder Notice Issued for Payment of Land cost Dt:19.02.2024. |
605 |
62 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
13 |
65918 |
mahanandiPolymers |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
628,609.69
|
0.00 |
628,609.69 |
628,610.00 |
61,628.00 |
29-FEB-2024 |
566,982.00 |
Provisional Allotment |
- |
General,Others |
477 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
63 |
PUTTAPARTHY |
Sri Sathya Sai |
UDL-ERRAMANCHI |
PLOT-1 |
64622 |
BOILLA INDUSTRIES |
23-JUN-2023 |
05-AUG-2023 |
- |
- |
12,615,168.00
|
0.00 |
12,615,168.00 |
6,307,584.00 |
0.00 |
- |
6,307,584.00 |
Provisional Allotment |
- |
General |
4128 |
NA |
22-JUN-2025 |
- |
- |
16-OCT-2023 |
EOT Orders issued for Payment of Land cost upto 31.01.2024 Dt:04.11.2023 |
237 |
64 |
PUTTAPARTHY |
Sri Sathya Sai |
UDL-ERRAMANCHI |
PLOT-2 |
64621 |
SRI BALAJI INDUSTRIES |
23-JUN-2023 |
05-AUG-2023 |
- |
- |
12,737,408.00
|
0.00 |
12,737,408.00 |
6,368,704.00 |
3,100.00 |
29-FEB-2024 |
6,365,604.00 |
Provisional Allotment |
- |
General |
4168 |
NA |
22-JUN-2025 |
- |
- |
16-OCT-2023 |
EOT Orders issued for Payment of Land cost upto 31.01.2024 Dt:04.11.2023 |
237 |