S.No   DISTRICT   ZONE   INDUSTRIAL PARK   PLOT NO   ALLOTMENT NUMBER   NAME OF THE INDUSTRY   ALLOTMENT DATE   PROVISIONAL ALLOTMENT DATE   FINAL ALLOTMENT DATE   DATE OF PHYSICAL POSSESSION   ALLOTMENT VALUE   REBATE AMOUNT   NET ALLOTMENT VALUE   ADVANCE TO BE PAID   AMOUNT RECEIVED   LAST PAID DATE   BALANCE ADVANCE AMOUNT   STATUS OF ALLOTMENT   CANCELLATION   CATEGORY OF ALLOTMENT   EXTENT IN SQM   IMPLEMENTATION STATUS CODE NEW   IMPLEMENTATION DUE DATE   DCP DATE   EOT PERIOD   NOTICE ISSUED DATE   IMPL ZM REMARKS   ALLOTMENT AGE IN DAYS 
1
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/166
50379
RADHAMADHAV ENTERPRISES
17-JAN-2023
17-JAN-2023
-
-
1,657,408.00
-
-
1,657,408.00
0.00
-
1,657,408.00
Provisional Allotment
NA
SC_W
752
NA
31-MAR-2025
-
-
-
Reallotment under YSR JBVM.Land cost not paid
466
2
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._23/16
54838
M/S SNEHA INDUSTRIES
09-JUL-2022
09-JUL-2022
-
-
204,000.00
102,000.00
102,000.00
102,000.00
0.00
-
102,000.00
Provisional Allotment
NA
SC_W
500
NA
31-MAR-2025
-
-
-
REALLOTMENT UNDEYSR JVBM Land cost not paid
658
3
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/205
54796
M/s GOODWILL INDUSTRIES
09-JUL-2022
09-JUL-2022
-
-
204,816.00
102,408.00
102,408.00
102,408.00
0.00
-
102,408.00
Provisional Allotment
NA
SC
502
NA
31-MAR-2025
-
-
-
Reallotment under YSR JBVM.Land cost not paid
658
4
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._9/134
54787
KAIZEN MACHINE TOOLS
31-JUL-2022
31-JUL-2022
-
-
510,000.00
249,900.00
260,100.00
260,100.00
249,900.00
29-FEB-2024
10,200.00
Provisional Allotment
-
SC
1250
NA
31-MAR-2025
-
-
-
JVBM.Allottee paid the land cost. Plot covered in dispute area. Allotee requested for alternate plot in the same estate. Hence, recommended for allotment of alternate Plot No.9/134 measuring 1250.00 Sq.Mtrs duly collecting the present land cost for the excess area. Provisional allotment,Court Case
636
5
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
Plot No_20/23,Plot No_20/24,Plot No_20/25,Plot No_20/26,Plot No_20/27,Plot No_20/28,Plot No_20/29
54708
M/s MET WEIGH INDIA
16-SEP-2022
16-SEP-2022
-
-
1,142,400.00
560,184.00
582,216.00
582,216.00
570,772.00
29-FEB-2024
11,444.00
Provisional Allotment
NA
SC
2800
NA
31-MAR-2025
-
-
-
Re-allotment orders issued under GO MS No 7
589
6
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/46,PLOT NO._18/47
54627
SUVASTHRA APPARELS
08-JUN-2023
08-JUN-2023
-
-
1,224,000.00
820,896.00
403,104.00
403,104.00
0.00
-
403,104.00
Provisional Allotment
NA
SC
3000
R2
31-MAR-2025
-
-
-
Reallotment Under YSR JBVM
324
7
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._17/54
57453
DKR ENGINEERING
02-MAR-2018
02-MAR-2018
-
-
204,000.00
0.00
204,000.00
204,000.00
20,400.00
29-FEB-2024
183,600.00
Provisional Allotment
Notice Issued
General
500
NA
02-MAR-2020
-
-
07-JUL-2022
Notice issued to pay the differential land cost, But not responde
2248
8
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._9/117
55851
Jhansi Enterprises
22-JUL-2022
22-JUL-2022
-
-
204,408.00
102,204.00
102,204.00
102,204.00
0.00
-
102,204.00
Provisional Allotment
NA
SC
501
NA
31-MAR-2025
-
-
-
Reallotted to YSR JBV on GO No 07
645
9
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/187
55260
S R INDUSTRIES
02-MAR-2018
02-MAR-2018
-
-
306,816.00
0.00
306,816.00
306,816.00
306,578.00
29-FEB-2024
238.00
Provisional Allotment
Notice Issued
Women-General
752
NA
08-MAR-2020
-
-
21-JUL-2022
Notice issued to pay the differential land cost, But not responded.
2248
10
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/100,PLOT NO._10/101,PLOT NO._10/102,PLOT NO._10/103
55903
KOMARAGIRI BHASKARA RAO
31-JUL-2022
31-JUL-2022
-
-
820,896.00
408,000.00
412,896.00
412,896.00
408,000.00
29-FEB-2024
4,896.00
Provisional Allotment
-
ST
2012
NA
31-MAR-2025
-
-
-
JVBM.recommended to reallot allotment of alternate Plot Nos. .10/100, 10/101, 10/102 & 10/103, 2012.00 Sq.Mtrs duly collecting the present land cost for the excess area. provisional allotment
636
11
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/18
55300
M/s. HSC CONSTRUCTIONS
28-DEC-2022
28-DEC-2022
-
-
836,400.00
408,816.00
427,584.00
427,584.00
0.00
-
427,584.00
Provisional Allotment
NA
SC
2050
NA
31-MAR-2025
-
-
-
Reallotment under YSR JBVM.Land cost not paid
486
12
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._9/73
56581
HI TECH EQUIPMENTS AND FABRICATION
02-MAR-2018
02-MAR-2018
-
-
874,344.00
437,172.00
437,172.00
437,172.00
204,408.00
29-FEB-2024
232,764.00
Provisional Allotment
Notice Issued
BC
501
NA
30-AUG-2020
-
-
08-JUL-2022
Differential land cost paid. Sale aggrement yet to be executed.
2248
13
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
Plot No._28
55630
Navayuva Prefab Pvt. Ltd.
02-MAR-2018
02-MAR-2018
-
-
966,968.00
0.00
966,968.00
966,968.00
946,968.00
29-FEB-2024
20,000.00
Provisional Allotment
Notice Issued
General
2321
NA
30-AUG-2020
-
-
10-AUG-2022
Notice issued to pay the differential land cost, But not responded.
2248
14
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/83,PLOT NO._10/84,PLOT NO._10/85
55858
M/s. HSC TRADING COMPANY
28-DEC-2022
28-DEC-2022
-
-
1,233,792.00
613,224.00
620,568.00
620,568.00
0.00
-
620,568.00
Provisional Allotment
NA
SC
3024
NA
31-MAR-2025
-
-
-
Reallotment under YSR JBVM.Land cost not paid
486
15
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/86/B
56687
RAVI ENGINEERING & PRE-FABRICATION
09-JUL-2022
09-JUL-2022
-
-
510,000.00
255,000.00
255,000.00
255,000.00
0.00
-
255,000.00
Provisional Allotment
NA
ST
1250
NA
31-MAR-2025
-
-
-
Reallotment under YSR JBVM.Land cost not paid
658
16
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._23/38
60937
M/s Anitha Industries
28-DEC-2022
28-DEC-2022
-
-
1,967,000.00
985,467.00
981,533.00
981,533.00
0.00
-
981,533.00
Provisional Allotment
NA
SC
1000
NA
31-MAR-2025
-
-
-
Reallotment under YSR JBVM.Land cost not paid
486
17
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._17/82
60996
M/s SRI VARDHAN SAI INDUSTRIES
09-JUL-2022
09-JUL-2022
-
-
983,500.00
491,750.00
491,750.00
491,750.00
0.00
-
491,750.00
Provisional Allotment
Cancelled
ST
500
NA
31-MAR-2025
-
-
-
Reallotment under YSR JBVM.Land cost not paid
658
18
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._9/65
61141
M/s. BHAGYAREKHA ENTERPRISES
09-JUL-2022
09-JUL-2022
-
-
985,467.00
492,734.00
492,733.00
492,733.00
0.00
-
492,733.00
Provisional Allotment
Cancelled
SC
501
NA
31-MAR-2025
-
-
-
Reallotment under YSR JBVM.Land cost not paid
658
19
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._10/35
61147
AVINASH ENTERPRISES
09-JUL-2022
09-JUL-2022
-
-
3,442,250.00
0.00
3,442,250.00
3,442,250.00
0.00
-
3,442,250.00
Provisional Allotment
Cancelled
SC,Technocrat
1750
NA
31-MAR-2025
-
-
-
YSR JBVM. Land cost not paid
658
20
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._9/127,PLOT NO._9/128,PLOT NO._9/129
61161
SAINATH PLASTIC INDUSTRIES
22-JUL-2022
22-JUL-2022
-
-
2,956,401.00
1,478,201.00
1,478,200.00
1,478,200.00
0.00
-
1,478,200.00
Provisional Allotment
Cancelled
SC
1503
NA
31-MAR-2025
-
-
-
REALLOTMENT UNDER YSR JVBM. Land cost not paid
645
21
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._23/56,PLOT NO._23/57,PLOT NO._23/60,PLOT NO._23/61
63943
M/s. INTEGRATED ENGINEERING WORKS
08-JUL-2022
16-AUG-2022
-
-
4,646,914.00
2,000,000.00
2,646,914.00
2,646,914.00
442,564.00
29-FEB-2024
2,204,350.00
Provisional Allotment
-
BC
2008
NA
07-JUL-2024
-
-
-
Provisional Allotment
620
22
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/155,PLOT NO._18/156
64232
M/s SRI NANDINI INDUSTRIES
27-DEC-2022
04-JAN-2023
-
-
2,212,816.00
0.00
2,212,816.00
2,212,816.00
0.00
-
2,212,816.00
Provisional Allotment
-
SC
1004
NA
26-DEC-2024
-
-
-
Prvisional Allotment
479
23
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._23/8
64355
M/s. Abdullah Industries
01-MAR-2023
02-MAR-2023
-
-
1,102,000.00
0.00
1,102,000.00
1,102,000.00
110,200.00
29-FEB-2024
991,800.00
Provisional Allotment
-
BC
500
NA
02-MAR-2025
-
-
-
Provisional Allotment
422
24
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._9/65
64350
M/s. Swarupa Industries
01-MAR-2023
02-MAR-2023
-
-
1,104,204.00
552,102.00
552,102.00
552,102.00
0.00
-
552,102.00
Provisional Allotment
-
SC
501
NA
02-MAR-2025
-
-
-
Lancd cost not paid proposals will be submitted for cancellation.
422
25
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._9/74
64356
M/s. HIDAYATULLA INDUSTRIES
01-MAR-2023
02-MAR-2023
-
-
1,104,204.00
0.00
1,104,204.00
1,104,204.00
110,420.00
29-FEB-2024
993,784.00
Provisional Allotment
-
BC
501
NA
02-MAR-2025
-
-
-
Provisional Allotment
422
26
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/197
64368
M/s. Shanawaz Industries
01-MAR-2023
02-MAR-2023
-
-
1,106,408.00
0.00
1,106,408.00
1,106,408.00
116,641.00
29-FEB-2024
989,767.00
Provisional Allotment
-
BC
502
NA
02-MAR-2025
-
-
-
Provisional Allotment
422
27
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/270
64362
M/s. Parveen Paper Products
01-MAR-2023
02-MAR-2023
-
-
1,110,816.00
555,408.00
555,408.00
555,408.00
117,082.00
29-FEB-2024
438,326.00
Provisional Allotment
-
BC
504
NA
02-MAR-2025
-
-
-
Provisional Allotment
422
28
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
PLOT NO._18/195,PLOT NO._18/196
64415
M/s. Lakshmi Industries
01-MAR-2023
02-MAR-2023
-
-
2,212,816.00
1,106,408.00
1,106,408.00
1,106,408.00
0.00
-
1,106,408.00
Provisional Allotment
-
ST
1004
NA
02-MAR-2025
-
-
-
With in time
422
29
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
Plot No-31/117
64684
M/s. Maanvik Plastic Solutions
23-JUN-2023
26-JUN-2023
-
-
3,863,612.00
0.00
3,863,612.00
3,863,612.00
0.00
-
3,863,612.00
Provisional Allotment
-
SC
1753
NA
22-JUN-2025
-
-
-
With in time
306
30
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
Plot No-31/85,Plot No-31/86,Plot No-31/87
64726
M/s. Shruthikesh Industries Private Limited
23-JUN-2023
27-JUN-2023
-
-
7,353,470.00
0.00
7,353,470.00
7,353,470.00
720,929.00
29-FEB-2024
6,632,541.00
Provisional Allotment
-
General
3271
NA
22-JUN-2025
-
-
-
Provisional Allotment
305
31
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
Plot No-31/15,Plot No-31/16
64734
M/s. Saagi Enterprises
23-JUN-2023
27-JUN-2023
-
-
7,472,618.00
0.00
7,472,618.00
7,472,618.00
0.00
-
7,472,618.00
Provisional Allotment
-
SC
3324
NA
22-JUN-2025
-
-
-
with in time
305
32
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
CFC-1,CFC2,PLOT NO._21/2/B,PLOT NO._21/2/C,PLOT NO_1C,PLOT NO_1C/1,PLOT NO_1C/2,PLOT NO_1C/3,PLOT NO_1C/4,PLOT NO_1C/5,Plot No-5/8,Plot No_06,Plot No_31/1,Plot No_31/2,Plot No_31/3,Plot No_31/4,Plot No_5/3,Plot No_5/4,Plot No_5/6,Plot No_5/7
64827
Avisa Foods and Fuels Pvt Ltd
08-AUG-2023
09-AUG-2023
-
-
207,695,488.00
0.00
207,695,488.00
207,695,488.00
0.00
-
207,695,488.00
Provisional Allotment
-
General
412025.55
NA
07-AUG-2025
-
-
-
Provisional Allotment
262
33
VIJAYAWADA
Krishna
AN CHALLAPALLI
MSME-1
61502
TEJA FABRICATIONS
22-JUL-2022
22-JUL-2022
-
-
1,008,000.00
504,000.00
504,000.00
504,000.00
0.00
-
504,000.00
Provisional Allotment
Cancelled
SC
300
NA
31-MAR-2025
-
-
-
Reallotment on Go No 7 JBVM
645
34
VIJAYAWADA
Krishna
AN CHALLAPALLI
72
63242
SRI LAKSHMI AUTOMOBILES
19-JAN-2022
31-JAN-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
18-JAN-2026
-
-
-
Land cost paid.
817
35
VIJAYAWADA
Krishna
AN CHALLAPALLI
36
63244
NAVODAYA TRACTOR SPARES
19-JAN-2022
02-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid.
815
36
VIJAYAWADA
Krishna
AN CHALLAPALLI
37
63246
VIJAYA DURGA AUTOMOBILES
19-JAN-2022
31-JAN-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
18-JAN-2026
-
-
-
Land cost paid.
817
37
VIJAYAWADA
Krishna
AN CHALLAPALLI
217
63247
BAJI TRACTOR AND LORRY MECHANICAL WORKS
19-JAN-2022
07-FEB-2022
-
-
243,870.00
121,935.00
121,935.00
121,935.00
24,387.00
29-FEB-2024
97,548.00
Land Cost Paid
-
BC
66
NA
18-JAN-2026
-
-
-
Land cost paid with late payment
810
38
VIJAYAWADA
Krishna
AN CHALLAPALLI
34
63248
SREE NIRMALA AUTOMOTIVES
19-JAN-2022
02-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid.
815
39
VIJAYAWADA
Krishna
AN CHALLAPALLI
216
63250
RAJAN MECHANICAL WORKS
19-JAN-2022
02-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
0.00
-
94,222.00
Land Cost Paid
-
SC
51
NA
18-JAN-2026
-
-
-
Land cost paid with interest amount
815
40
VIJAYAWADA
Krishna
AN CHALLAPALLI
218
63249
PASHA AUTO SERVICES
19-JAN-2022
07-FEB-2022
-
-
243,870.00
121,935.00
121,935.00
121,935.00
24,387.00
29-FEB-2024
97,548.00
Land Cost Paid
-
BC
66
NA
18-JAN-2026
-
-
-
Land cost paid.
810
41
VIJAYAWADA
Krishna
AN CHALLAPALLI
144
63251
LAKSHMI WELDING WORKS
19-JAN-2022
02-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid.
815
42
VIJAYAWADA
Krishna
AN CHALLAPALLI
57
63252
BABU PAINTING WORKS
19-JAN-2022
02-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid with late payment
815
43
VIJAYAWADA
Krishna
AN CHALLAPALLI
17
63255
JAYA SAI PAINTS AND GENERAL STORES
19-JAN-2022
31-JAN-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
18-JAN-2026
-
-
-
Land cost paid with late payment
817
44
VIJAYAWADA
Krishna
AN CHALLAPALLI
236
63259
CHANDU MECHANICAL WORKS
19-JAN-2022
07-FEB-2022
-
-
243,870.00
121,935.00
121,935.00
121,935.00
0.00
-
121,935.00
Land Cost Paid
-
SC
66
NA
18-JAN-2026
-
-
-
Land cost paid with late payment
810
45
VIJAYAWADA
Krishna
AN CHALLAPALLI
24
63261
BHARAT AUTOMOBILES
19-JAN-2022
02-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid.
815
46
VIJAYAWADA
Krishna
AN CHALLAPALLI
128
63262
MOIEN MECHANICAL WORKS
19-JAN-2022
02-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid with late payment
815
47
VIJAYAWADA
Krishna
AN CHALLAPALLI
110
63265
BISMILLAH AUTO ELECTRICAL WORKS
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid with late payment
816
48
VIJAYAWADA
Krishna
AN CHALLAPALLI
143
63264
SHABBIR WELDING WORKS
19-JAN-2022
02-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid with late payment
815
49
VIJAYAWADA
Krishna
AN CHALLAPALLI
53
63267
ARUNA ENGINEERING COMPANY
19-JAN-2022
31-JAN-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
18-JAN-2026
-
-
-
To be cancelled due to nonpayment of land cost.
817
50
VIJAYAWADA
Krishna
AN CHALLAPALLI
54
63268
SPANDANA ENGINEERING COMPANY
19-JAN-2022
07-FEB-2022
-
-
214,310.00
0.00
214,310.00
214,310.00
21,431.00
29-FEB-2024
192,879.00
Land Cost Paid
-
General
58
NA
18-JAN-2026
-
-
-
Land cost paid.
810
51
VIJAYAWADA
Krishna
AN CHALLAPALLI
107
63269
DIVYA BATTERY WORKS
19-JAN-2022
29-JAN-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
18-JAN-2026
-
-
-
Land cost paid without interest amount
819
52
VIJAYAWADA
Krishna
AN CHALLAPALLI
125
63270
FAYAZ MECHANICAL WORKS
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid with late payment
816
53
VIJAYAWADA
Krishna
AN CHALLAPALLI
180
63273
KISAN ENGINEERING WORKS
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid with late payment
816
54
VIJAYAWADA
Krishna
AN CHALLAPALLI
247
63272
DURGA SYAM MECHANICAL WORKS
19-JAN-2022
29-JAN-2022
-
-
243,870.00
0.00
243,870.00
243,870.00
24,387.00
29-FEB-2024
219,483.00
Land Cost Paid
-
General
66
NA
18-JAN-2026
-
-
-
Land cost paid.
819
55
VIJAYAWADA
Krishna
AN CHALLAPALLI
135
63275
KALA WOOD TURNING CENTER
19-JAN-2022
31-JAN-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
18-JAN-2026
-
-
-
Land cost paid with time
817
56
VIJAYAWADA
Krishna
AN CHALLAPALLI
141
63274
BISHMILLAH WATER SERVICING
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid.
816
57
VIJAYAWADA
Krishna
AN CHALLAPALLI
177
63277
SRI LASKHMI GANAPATI BEARING WORKS
19-JAN-2022
31-JAN-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
18-JAN-2026
-
-
-
Land cost paid with in time
817
58
VIJAYAWADA
Krishna
AN CHALLAPALLI
215
63279
SIVAJI ENGINEERING WORKS
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
5,778.00
29-FEB-2024
88,444.00
Land Cost Paid
-
SC
51
NA
18-JAN-2026
-
-
-
25% paid with in time
816
59
VIJAYAWADA
Krishna
AN CHALLAPALLI
165
63280
SWAMY AYYAPPA WELDING WORKS
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
0.00
-
94,222.00
Land Cost Paid
-
SC
51
NA
18-JAN-2026
-
-
-
Land cost paid with interest amount
816
60
VIJAYAWADA
Krishna
AN CHALLAPALLI
74
63284
VENKATA RAMANA ELECTRICAL AC AND DC WORKS
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid.
816
61
VIJAYAWADA
Krishna
AN CHALLAPALLI
166
63288
MUKTHESWARA RAO WELDING WORKS
19-JAN-2022
31-JAN-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
5,900.00
29-FEB-2024
88,322.00
Land Cost Paid
-
SC
51
NA
18-JAN-2026
-
-
-
Land cost paid with in time
817
62
VIJAYAWADA
Krishna
AN CHALLAPALLI
70
63287
Bismillah Work Shop
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid.
816
63
VIJAYAWADA
Krishna
AN CHALLAPALLI
146
63291
SAYYAD ALI FOUNDARY WORKS
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid.
816
64
VIJAYAWADA
Krishna
AN CHALLAPALLI
52
63293
SEETHARAMAIAH ELECTRICAL WORKS
19-JAN-2022
31-JAN-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
Women,General
51
NA
18-JAN-2026
-
-
-
Land cost paid.
817
65
VIJAYAWADA
Krishna
AN CHALLAPALLI
160
63294
MD IQBAL SEAT WORKS
19-JAN-2022
02-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid.
815
66
VIJAYAWADA
Krishna
AN CHALLAPALLI
105
63295
VIJAYA DURGA ENGINEERING WORKS
19-JAN-2022
31-JAN-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
18-JAN-2026
-
-
-
Land cost paid without interest amount
817
67
VIJAYAWADA
Krishna
AN CHALLAPALLI
19
63296
SRI GOPI KRISHNA AUTO AGENCIES
19-JAN-2022
07-FEB-2022
-
-
206,920.00
0.00
206,920.00
206,920.00
20,692.00
29-FEB-2024
186,228.00
Land Cost Paid
-
General
56
NA
18-JAN-2026
-
-
-
Land cost paid.
810
68
VIJAYAWADA
Krishna
AN CHALLAPALLI
161
63297
JALA DURGA DC ELECTRICAL WORKS
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid with late payment
816
69
VIJAYAWADA
Krishna
AN CHALLAPALLI
71
63299
K V K RAO ELECTRICAL WORKS
19-JAN-2022
31-JAN-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
18-JAN-2026
-
-
-
Land cost paid.
817
70
VIJAYAWADA
Krishna
AN CHALLAPALLI
185
63298
ANJI TRACTOR MECHANICAL WORKS
19-JAN-2022
02-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid with late payment
815
71
VIJAYAWADA
Krishna
AN CHALLAPALLI
181
63302
NATIONAL ENGINEERING WORKS
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
0.00
-
94,222.00
Provisional Allotment
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid with late payment
816
72
VIJAYAWADA
Krishna
AN CHALLAPALLI
214
63304
VENKATESWARA MECHANICAL WORKS
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
5,900.00
29-FEB-2024
88,322.00
Land Cost Paid
-
SC
51
NA
18-JAN-2026
-
-
-
25 % amount pid with in time
816
73
VIJAYAWADA
Krishna
AN CHALLAPALLI
167
63308
IRMIYA FOUNDARY WORKS
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
0.00
-
94,222.00
Land Cost Paid
-
SC
51
NA
18-JAN-2026
-
-
-
50% Land Cost Paid with late belongs to BC-W category. To be conformed on eligibility of rebate DIO GM DIC
816
74
VIJAYAWADA
Krishna
AN CHALLAPALLI
175
63312
KOTESWARARAO KOLIMI WORKS
19-JAN-2022
31-JAN-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
5,900.00
29-FEB-2024
88,322.00
Land Cost Paid
-
SC
51
NA
18-JAN-2026
-
-
-
Land cost paid with in time
817
75
VIJAYAWADA
Krishna
AN CHALLAPALLI
129
63311
JYOTHI ELECTRICAL WORKS
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
0.00
-
94,222.00
Land Cost Paid
-
SC
51
NA
18-JAN-2026
-
-
-
Land cost paid with late payment
816
76
VIJAYAWADA
Krishna
AN CHALLAPALLI
134
63313
RAHEEM ENGINEERING WORKS
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land Cost Paid
816
77
VIJAYAWADA
Krishna
AN CHALLAPALLI
69
63314
VARA LAKSHMI MOTORS
19-JAN-2022
31-JAN-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
18-JAN-2026
-
-
-
Land Cost Paid
817
78
VIJAYAWADA
Krishna
AN CHALLAPALLI
68
63317
CHANDRA AUTOMOBILES
19-JAN-2022
31-JAN-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
18-JAN-2026
-
-
-
Land cost paid with late payment
817
79
VIJAYAWADA
Krishna
AN CHALLAPALLI
88
63323
SATYAM AUTOMOBILES
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid without interest amount
816
80
VIJAYAWADA
Krishna
AN CHALLAPALLI
133
63327
SRI MANIKANTA ELECTRICAL WORKS
19-JAN-2022
01-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
18-JAN-2026
-
-
-
Land cost paid with late payment
816
81
VIJAYAWADA
Krishna
AN CHALLAPALLI
169
63382
SURESH BODY BUILDING WORKS
07-FEB-2022
14-FEB-2022
-
-
188,445.00
94,223.00
94,222.00
94,222.00
18,845.00
29-FEB-2024
75,377.00
Land Cost Paid
-
BC
51
NA
06-FEB-2026
-
-
-
Land Cost Paid
803
82
VIJAYAWADA
Krishna
AN CHALLAPALLI
67
63384
NAGESWARA MECHANICAL WORKS
07-FEB-2022
14-FEB-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
20,294.00
29-FEB-2024
168,151.00
Land Cost Paid
-
BC
51
NA
06-FEB-2026
-
-
-
Land Cost Paid
803
83
VIJAYAWADA
Krishna
AN CHALLAPALLI
136
63388
VIJAYA DURGA ELECTRICAL WORKS
07-FEB-2022
14-FEB-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
06-FEB-2026
-
-
-
Land Cost Paid
803
84
VIJAYAWADA
Krishna
AN CHALLAPALLI
114
63393
SRINIVASA AUTOMOBILES AND ELECTRICALS
07-FEB-2022
14-FEB-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
06-FEB-2026
-
-
-
Land cost paid without interest amount
803
85
VIJAYAWADA
Krishna
AN CHALLAPALLI
231
63395
BHAGYALAKSHMI TRACTOR MECHANICAL WORKS
07-FEB-2022
14-FEB-2022
-
-
243,870.00
121,935.00
121,935.00
121,935.00
74,387.00
29-FEB-2024
47,548.00
Land Cost Paid
-
BC
66
NA
06-FEB-2026
-
-
-
Land cost paid with late payment
803
86
VIJAYAWADA
Krishna
AN CHALLAPALLI
182
63492
VENKATAREDDY ENGINEERING WORKS
15-MAR-2022
29-MAR-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
14-MAR-2026
-
-
-
Land cost paid with interest amount
760
87
VIJAYAWADA
Krishna
AN CHALLAPALLI
123
63493
SAI DURGA MECHANICAL WORKS
15-MAR-2022
30-MAR-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
144,354.00
29-FEB-2024
44,091.00
Land Cost Paid
-
BC
51
NA
14-MAR-2026
-
-
-
Land Cost Paid
759
88
VIJAYAWADA
Krishna
AN CHALLAPALLI
76
63498
VIGNESWARA VULCANIZATION WORKS
15-MAR-2022
29-MAR-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
14-MAR-2026
-
-
-
Land Cost Paid
760
89
VIJAYAWADA
Krishna
AN CHALLAPALLI
158
63585
RAHAMANIA RADIATOR WORKS
29-MAR-2022
30-MAR-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
BC
51
NA
28-MAR-2026
-
-
-
Land cost paid with in time
759
90
VIJAYAWADA
Krishna
AN CHALLAPALLI
148
63586
REHAMAN AUTO ELECTRICAL WORKS
29-MAR-2022
30-MAR-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
BC
51
NA
28-MAR-2026
-
-
-
Land cost paid with late payment
759
91
VIJAYAWADA
Krishna
AN CHALLAPALLI
210
63589
SAI RAM LORRY KAMAN KATTALU WORKS
29-MAR-2022
16-AUG-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Provisional Allotment
-
BC
51
NA
28-MAR-2026
-
-
-
To be cancelled due to nonpayment of land cost.
620
92
VIJAYAWADA
Krishna
AN CHALLAPALLI
115
63591
DASU MECHANICAL WORKS
29-MAR-2022
30-MAR-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
BC
51
NA
28-MAR-2026
-
-
-
Land cost paid with out interest amount
759
93
VIJAYAWADA
Krishna
AN CHALLAPALLI
39
63593
RADHAKRISHNA BATTERY WORKS
29-MAR-2022
30-MAR-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
28-MAR-2026
-
-
-
Land Cost Paid
759
94
VIJAYAWADA
Krishna
AN CHALLAPALLI
87
63596
KAZA BATTERY AND ELECTRICAL WORKS
29-MAR-2022
30-MAR-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
BC
51
NA
28-MAR-2026
-
-
-
Land Cost Paid
759
95
VIJAYAWADA
Krishna
AN CHALLAPALLI
16
63597
INDIAN AUTOMOBILES
29-MAR-2022
30-MAR-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
BC
51
NA
28-MAR-2026
-
-
-
Land Cost Paid
759
96
VIJAYAWADA
Krishna
AN CHALLAPALLI
86
63598
KAZA AUTO ELECTRICAL WORKS
29-MAR-2022
30-MAR-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
BC
51
NA
28-MAR-2026
-
-
-
Land cost paid
759
97
VIJAYAWADA
Krishna
AN CHALLAPALLI
149
63684
BISMILLAH OLD TYRE WORKS
31-MAR-2022
01-APR-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
BC
51
NA
30-MAR-2026
-
-
-
Land cost paid with late payment
757
98
VIJAYAWADA
Krishna
AN CHALLAPALLI
78
63698
GUTHIKONDA SUBRAHMANYAM
31-MAR-2022
01-APR-2022
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
30-MAR-2026
-
-
-
Land cost paid
757
99
VIJAYAWADA
Krishna
AN CHALLAPALLI
29
64119
SURESH MECHANICAL WORKS
27-DEC-2022
04-JAN-2023
-
-
188,445.00
94,223.00
94,222.00
94,222.00
0.00
-
94,222.00
Land Cost Paid
-
SC
51
NA
26-DEC-2024
-
-
-
Land cost paid
479
100
VIJAYAWADA
Krishna
AN CHALLAPALLI
85
64120
BISMILLAH WELDING WORKS
27-DEC-2022
04-JAN-2023
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
BC
51
NA
26-DEC-2024
-
-
-
Land cost paid
479
101
VIJAYAWADA
Krishna
AN CHALLAPALLI
106
64121
TULASI BATTERY WORKS
27-DEC-2022
09-FEB-2023
-
-
188,445.00
0.00
188,445.00
188,445.00
24,223.00
29-FEB-2024
164,222.00
Provisional Allotment
-
General
51
NA
26-DEC-2024
-
-
-
land cost not paid
443
102
VIJAYAWADA
Krishna
AN CHALLAPALLI
120
64122
SRI DURGA ELECTRICAL WORKS
27-DEC-2022
04-JAN-2023
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Provisional Allotment
-
General
51
NA
26-DEC-2024
-
-
-
Provisional Allotment
479
103
VIJAYAWADA
Krishna
AN CHALLAPALLI
195
64123
SAMBASIVA OLD SCRAP SHOP
27-DEC-2022
04-JAN-2023
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Provisional Allotment
-
General
51
NA
26-DEC-2024
-
-
-
To be cancelled due to nonpayment of land cost.
479
104
VIJAYAWADA
Krishna
AN CHALLAPALLI
204
64202
SUDHEER WELDING WORKS
27-DEC-2022
04-JAN-2023
-
-
188,445.00
94,223.00
94,222.00
94,222.00
0.00
-
94,222.00
Provisional Allotment
-
SC
51
NA
26-DEC-2024
-
-
-
Provisional Allotment
479
105
VIJAYAWADA
Krishna
AN CHALLAPALLI
239
64204
SAMBASIVARAO MECHANICAL WORKS
27-DEC-2022
04-JAN-2023
-
-
243,870.00
0.00
243,870.00
243,870.00
24,387.00
29-FEB-2024
219,483.00
Land Cost Paid
-
General
66
NA
26-DEC-2024
-
-
-
Land cost paid
479
106
VIJAYAWADA
Krishna
AN CHALLAPALLI
170
64207
TAHA MADINA MECHANICAL WORKS
27-DEC-2022
04-JAN-2023
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Provisional Allotment
-
BC
51
NA
26-DEC-2024
-
-
-
To be cancelled due to nonpayment of land cost.
479
107
VIJAYAWADA
Krishna
AN CHALLAPALLI
50
64210
SRI HANUMA TYRE VULCANIZATION WORKS
27-DEC-2022
04-JAN-2023
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Provisional Allotment
-
General
51
NA
26-DEC-2024
-
-
-
To be cancelled due to nonpayment of land cost.
479
108
VIJAYAWADA
Krishna
AN CHALLAPALLI
138
64314
SANKARARAO KOLLIMI WORKS
01-MAR-2023
02-MAR-2023
-
-
188,445.00
94,223.00
94,222.00
94,222.00
0.00
-
94,222.00
Provisional Allotment
-
SC
51
NA
02-MAR-2025
-
-
-
Provisional Allotment
422
109
VIJAYAWADA
Krishna
AN CHALLAPALLI
80
64316
YASIN OLD SCRAP MERCHANTS
01-MAR-2023
02-MAR-2023
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Provisional Allotment
-
BC
51
NA
02-MAR-2025
-
-
-
Provisional Allotment
422
110
VIJAYAWADA
Krishna
AN CHALLAPALLI
187
64321
RISHITHA WELDING WORKS
01-MAR-2023
02-MAR-2023
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
BC
51
NA
02-MAR-2025
-
-
-
Land cost paid
422
111
VIJAYAWADA
Krishna
AN CHALLAPALLI
102
64325
GIRI ARC WELDING WORKS
01-MAR-2023
02-MAR-2023
-
-
188,445.00
94,223.00
94,222.00
94,222.00
0.00
-
94,222.00
Land Cost Paid
-
SC
51
NA
02-MAR-2025
-
-
-
Land cost Paid
422
112
VIJAYAWADA
Krishna
AN CHALLAPALLI
117
64333
SVS SPRAY PAINTING WORKS
01-MAR-2023
02-MAR-2023
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Provisional Allotment
-
BC
51
NA
02-MAR-2025
-
-
-
To be cancelled due to nonpayment of land cost.
422
113
VIJAYAWADA
Krishna
AN CHALLAPALLI
121
64334
BASHA MECHANICAL WORKS
01-MAR-2023
02-MAR-2023
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Provisional Allotment
-
BC
51
NA
02-MAR-2025
-
-
-
Provisonal Allotment
422
114
VIJAYAWADA
Krishna
AN CHALLAPALLI
122
64335
KGN BODY BUILDERS
01-MAR-2023
02-MAR-2023
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Provisional Allotment
-
BC
51
NA
02-MAR-2025
-
-
-
To be cancelled due to non payment of land cost.
422
115
VIJAYAWADA
Krishna
AN CHALLAPALLI
150
64341
MANIKANTA PAINTING WORKS
01-MAR-2023
02-MAR-2023
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Provisional Allotment
-
General
51
NA
02-MAR-2025
-
-
-
land cost not paid with in time
422
116
VIJAYAWADA
Krishna
AN CHALLAPALLI
193
64357
SEETAMAHALAKSHMI ELECTRICAL WORKS
01-MAR-2023
02-MAR-2023
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Land Cost Paid
-
General
51
NA
02-MAR-2025
-
-
-
Land cost Paid
422
117
VIJAYAWADA
Krishna
AN CHALLAPALLI
83
64390
VASU ELECTRICAL WORKS
01-MAR-2023
02-MAR-2023
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Provisional Allotment
-
General
51
NA
02-MAR-2025
-
-
-
Provisional Allotment
422
118
VIJAYAWADA
Krishna
AN CHALLAPALLI
22
64397
TANVIVARMA CARPENTER WORKS
01-MAR-2023
02-MAR-2023
-
-
188,445.00
0.00
188,445.00
188,445.00
18,845.00
29-FEB-2024
169,600.00
Provisional Allotment
-
BC
51
NA
02-MAR-2025
-
-
-
To be cancelled due to nonpayment of land cost.
422
119
VIJAYAWADA
Krishna
AN CHALLAPALLI
241
64399
SRI JALADESWARA TRACTOR MECHANICAL WORKS
01-MAR-2023
02-MAR-2023
-
-
243,870.00
0.00
243,870.00
243,870.00
24,387.00
29-FEB-2024
219,483.00
Provisional Allotment
-
BC
66
NA
02-MAR-2025
-
-
-
Provisional Allotment
422
120
VIJAYAWADA
Krishna
AN CHALLAPALLI
248
64404
SRINU TRACTOR MECHANICAL WORKS
01-MAR-2023
02-MAR-2023
-
-
243,870.00
121,935.00
121,935.00
121,935.00
0.00
-
121,935.00
Provisional Allotment
-
SC
66
NA
02-MAR-2025
-
-
-
Land cost not paid
422
121
VIJAYAWADA
Krishna
AN CHALLAPALLI
235
64393
RAJYALAKSHMI TRACTOR MECHANICAL WORKS
01-MAR-2023
02-MAR-2023
-
-
339,940.00
169,970.00
169,970.00
169,970.00
0.00
-
169,970.00
Provisional Allotment
-
SC
92
NA
02-MAR-2025
-
-
-
Land cost paid with in time
422
122
VIJAYAWADA
Krishna
AN CHALLAPALLI
MSME-12
64313
SRI SAI NADHA WELDING WORKS
01-MAR-2023
02-MAR-2023
-
-
1,108,500.00
554,250.00
554,250.00
554,250.00
0.00
-
554,250.00
Provisional Allotment
-
SC
300
NA
02-MAR-2025
-
-
-
50% LC Paid under BC-W category.To be conformed eligibility of rebit from DIO,DIC
422
123
VIJAYAWADA
Krishna
AN CHALLAPALLI
MSME-13
64317
TULASI RADHA TRADERS
01-MAR-2023
02-MAR-2023
-
-
1,995,300.00
0.00
1,995,300.00
1,995,300.00
199,530.00
29-FEB-2024
1,795,770.00
Provisional Allotment
-
BC
540
NA
02-MAR-2025
-
-
-
Provisional Allotment
422
124
VIJAYAWADA
Krishna
AN CHALLAPALLI
244
64627
SRI RAJYA LAKSHMI TRACTOR MECHANICAL WORKS
23-JUN-2023
27-JUN-2023
-
-
243,870.00
0.00
243,870.00
243,870.00
24,387.00
29-FEB-2024
219,483.00
Land Cost Paid
-
General
66
NA
22-JUN-2025
-
-
-
Land cost paid with in time
305
125
VIJAYAWADA
Krishna
AN CHALLAPALLI
63
64704
SRIKRISHNA ELECTRICAL WORKS
23-JUN-2023
27-JUN-2023
-
-
188,445.00
94,223.00
94,222.00
94,222.00
0.00
-
94,222.00
Provisional Allotment
-
ST
51
NA
22-JUN-2025
-
-
-
With in time
305
126
VIJAYAWADA
Krishna
AN CHALLAPALLI
249
64714
MESSAIAH TRACTOR MECHANICAL WORKS
23-JUN-2023
27-JUN-2023
-
-
243,870.00
121,935.00
121,935.00
121,935.00
0.00
-
121,935.00
Provisional Allotment
-
SC
66
NA
22-JUN-2025
-
-
-
Land cost paid with in time
305
127
VIJAYAWADA
Krishna
Mega Food Park-Mallavalli
Plot No 01,Plot No 02,Plot No 03,Plot No 04,Plot No 05,Plot No 06,Plot No 07,Plot No 08,Plot No 09,Plot No 12,Plot No 12-A,Plot No 13,Plot No 14,Plot No 18,Plot No 20,Plot No 21,Plot No 22,Plot No 23,Plot No 24,Plot No 25
63400
M/s Avisa Foods Private Limited
07-FEB-2022
14-FEB-2022
-
-
57,548,972.00
0.00
57,548,972.00
57,548,972.00
4,837,890.00
29-FEB-2024
52,711,080.00
Provisional Allotment
-
General
56036
NA
06-FEB-2026
-
-
07-JUL-2022
Land cost not paid
803
128
VIJAYAWADA
Krishna
Mega Food Park-Mallavalli
Plot No 32,Plot No 33
63727
MEGHA FRUIT PROCESSING PRIVATE LIMITED
31-MAR-2022
17-JUN-2022
-
-
36,678,280.00
0.00
36,678,280.00
36,678,280.00
3,408,202.00
29-FEB-2024
33,270,076.00
Provisional Allotment
-
General
35714
NA
30-MAR-2026
-
-
-
50% Land cost to be paid
680
129
VIJAYAWADA
NTR
IP-Peddavaram
295,296
58407
M/s.Jaswitha Industries
08-FEB-2019
08-FEB-2019
-
-
491,400.00
245,700.00
245,700.00
245,700.00
0.00
-
245,700.00
Provisional Allotment
Notice Issued
SC
600
NA
08-FEB-2020
-
-
20-JUN-2022
22A Final allotment orders yet to be issued
1905
130
VIJAYAWADA
NTR
IP-Peddavaram
151,152
58451
SQUAREMAG SYSTEMS
08-FEB-2019
08-FEB-2019
-
-
491,400.00
0.00
491,400.00
491,400.00
98,280.00
29-FEB-2024
393,120.00
Provisional Allotment
Notice Issued
Women-General
600
NA
08-FEB-2020
-
-
20-JUL-2022
22A Final allotment orders yet to be issued
1905
131
VIJAYAWADA
NTR
IP-Peddavaram
15,16,17
58449
Sri Gayathri Engineers
08-FEB-2019
08-FEB-2019
-
-
924,651.00
462,326.00
462,325.00
462,325.00
461,814.00
29-FEB-2024
511.00
Provisional Allotment
Notice Issued
SC
1129
NA
08-FEB-2020
-
-
20-JUN-2022
22A Final allotment orders yet to be issued
1905
132
VIJAYAWADA
NTR
IP-Peddavaram
249
59708
RAJARAM INDUSTRIES
09-JUL-2022
09-JUL-2022
-
-
245,700.00
122,850.00
122,850.00
122,850.00
0.00
-
122,850.00
Provisional Allotment
NA
SC
300
NA
31-MAR-2025
-
-
-
22A Reallotment of G.O Ms No.7 in JBV
658
133
VIJAYAWADA
NTR
IP-Peddavaram
281,282
59712
M/S city dhobis
09-JUL-2022
09-JUL-2022
-
-
491,400.00
245,700.00
245,700.00
245,700.00
0.00
-
245,700.00
Provisional Allotment
Cancelled
SC
600
NA
31-MAR-2025
-
-
-
22A REALLOTMENT UNDEYSR JVBM Land cost not paid
658
134
VIJAYAWADA
NTR
IP-Peddavaram
37
59720
Poorvi Note Books
09-AUG-2019
09-AUG-2019
-
-
245,700.00
122,850.00
122,850.00
122,850.00
24,570.00
29-FEB-2024
98,280.00
Provisional Allotment
Notice Issued
BC
300
NA
08-AUG-2020
-
-
20-JUN-2022
22 A Provisional Allotment
1723
135
VIJAYAWADA
NTR
IP-Peddavaram
20,21
59733
SKYSEA e MACHINES
09-JUL-2022
09-JUL-2022
-
-
491,400.00
245,700.00
245,700.00
245,700.00
0.00
-
245,700.00
Provisional Allotment
Cancelled
SC
600
NA
31-MAR-2025
-
-
-
22A REALLOTMENT UNDE NO GO NO 7
658
136
VIJAYAWADA
NTR
IP-Peddavaram
48,49,50
59732
V V M AGRO INDUSTRIES
09-AUG-2019
09-AUG-2019
-
-
737,100.00
368,550.00
368,550.00
368,550.00
73,710.00
29-FEB-2024
294,840.00
Provisional Allotment
Notice Issued
BC
900
NA
08-AUG-2020
-
-
20-JUN-2022
22 A Provisional Allotment
1723
137
VIJAYAWADA
NTR
IP-Peddavaram
107
59745
Bhavana Polymers
09-AUG-2019
09-AUG-2019
-
-
245,700.00
122,850.00
122,850.00
122,850.00
24,570.00
29-FEB-2024
98,280.00
Provisional Allotment
Notice Issued
BC,Women
300
NA
08-AUG-2020
-
-
20-JUN-2022
22A Provisional Allotment
1723
138
VIJAYAWADA
NTR
IP-Peddavaram
85
59750
KIRAN MECHANICAL INDUSTRIES
09-AUG-2019
09-AUG-2019
-
-
491,400.00
0.00
491,400.00
491,400.00
49,140.00
29-FEB-2024
442,260.00
Provisional Allotment
Notice Issued
General
600
NA
08-AUG-2020
-
-
20-JUN-2022
22A Provisional Allotment
1723
139
VIJAYAWADA
NTR
IP-Peddavaram
142
59758
DAMARLA LAVANYA
09-AUG-2019
09-AUG-2019
-
-
609,336.00
304,668.00
304,668.00
304,668.00
60,934.00
29-FEB-2024
243,734.00
Provisional Allotment
-
BC
707
NA
08-AUG-2020
-
-
-
22A Provisional Allotment
1723
140
VIJAYAWADA
NTR
IP-Peddavaram
232
59763
bargava shanmukhnadh industries
09-AUG-2019
09-AUG-2019
-
-
245,700.00
0.00
245,700.00
245,700.00
24,570.00
29-FEB-2024
221,130.00
Provisional Allotment
Notice Issued
BC,Women
300
NA
08-AUG-2020
-
-
20-JUN-2022
22A Provisional Allotment
1723
141
VIJAYAWADA
NTR
IP-Peddavaram
237
59764
JP FABRICATION & ENGINEERING WORKS
09-JUL-2022
09-JUL-2022
-
-
245,700.00
122,850.00
122,850.00
122,850.00
0.00
-
122,850.00
Provisional Allotment
Cancelled
SC
300
NA
31-MAR-2025
-
-
-
22 A Re-allotment under YSR JBV
658
142
VIJAYAWADA
NTR
IP-Peddavaram
72,73,74
59761
MALLIKARJUNA BYSANI
09-AUG-2019
09-AUG-2019
-
-
1,105,650.00
0.00
1,105,650.00
1,105,650.00
110,565.00
29-FEB-2024
995,085.00
Provisional Allotment
Notice Issued
General
1350
NA
08-AUG-2020
-
-
20-JUN-2022
22A Provisional Allotment
1723
143
VIJAYAWADA
NTR
IP-Peddavaram
247,248
59767
North East Systems Limited
09-AUG-2019
09-AUG-2019
-
-
491,400.00
245,700.00
245,700.00
245,700.00
0.00
-
245,700.00
Provisional Allotment
Notice Issued
SC
600
NA
08-AUG-2020
-
-
20-JUN-2022
22A Provisional Allotment
1723
144
VIJAYAWADA
NTR
IP-Peddavaram
209,210,211,212
59765
MANI POWER DISTRIBUTION SYSTEMS Pvt. Ltd.
09-AUG-2019
09-AUG-2019
-
-
982,800.00
0.00
982,800.00
982,800.00
98,280.00
29-FEB-2024
884,520.00
Provisional Allotment
Notice Issued
General
1200
NA
08-AUG-2020
-
-
20-JUN-2022
22A Provisional Allotment
1723
145
VIJAYAWADA
NTR
IP-Peddavaram
297
59774
REVANTH INDUSTRIES
09-AUG-2019
09-AUG-2019
-
-
245,700.00
122,850.00
122,850.00
122,850.00
32,100.00
29-FEB-2024
90,750.00
Provisional Allotment
Notice Issued
SC
300
NA
08-AUG-2020
-
-
20-JUN-2022
22A Provisional Allotment
1723
146
VIJAYAWADA
NTR
IP-Peddavaram
150
59786
lokesh machine tools
09-JUL-2022
09-JUL-2022
-
-
245,700.00
122,850.00
122,850.00
122,850.00
0.00
-
122,850.00
Provisional Allotment
Cancelled
SC
300
NA
31-MAR-2025
-
-
-
22A REALLOTMENT UNDE NO GO NO 7.Land cost not paid
658
147
VIJAYAWADA
NTR
IP-Peddavaram
143
59793
AL Tech Engineering Works
09-AUG-2019
09-AUG-2019
-
-
245,700.00
122,850.00
122,850.00
122,850.00
24,570.00
29-FEB-2024
98,280.00
Provisional Allotment
Notice Issued
BC
300
NA
08-AUG-2020
-
-
20-JUN-2022
22A Provisional Allotment
1723
148
VIJAYAWADA
NTR
IP-Peddavaram
262,263
59794
Tejaswi Automation
09-AUG-2019
09-AUG-2019
-
-
873,873.00
0.00
873,873.00
873,873.00
87,388.00
29-FEB-2024
786,485.00
Provisional Allotment
Notice Issued
Women,General
1067
NA
08-AUG-2020
-
-
20-JUN-2022
22A Provisional Allotment
1723
149
VIJAYAWADA
NTR
IP-Peddavaram
115
59795
Sri Maithri Engineers
09-AUG-2019
09-AUG-2019
-
-
245,700.00
0.00
245,700.00
245,700.00
24,570.00
29-FEB-2024
221,130.00
Provisional Allotment
Notice Issued
General
300
NA
08-AUG-2020
-
-
20-JUL-2022
22A Provisional Allotment
1723
150
VIJAYAWADA
NTR
IP-Peddavaram
174
59796
Sri Trupura Industries.
09-AUG-2019
09-AUG-2019
-
-
245,700.00
122,850.00
122,850.00
122,850.00
24,570.00
29-FEB-2024
98,280.00
Provisional Allotment
Notice Issued
BC,Women
300
NA
08-AUG-2020
-
-
20-JUN-2022
22A Provisional Allotment
1723
151
VIJAYAWADA
NTR
IP-Peddavaram
264
59804
Srinivasa Engineering works
09-AUG-2019
09-AUG-2019
-
-
457,821.00
0.00
457,821.00
457,821.00
49,140.00
29-FEB-2024
408,681.00
Provisional Allotment
Notice Issued
Women,General
559
NA
08-AUG-2020
-
-
20-JUN-2022
22A Provisional Allotment
1723
152
VIJAYAWADA
NTR
IP-Peddavaram
100,101,112,113,114,99
59806
M/s THREE STARS ENGINEERING WORKS
09-AUG-2019
09-AUG-2019
-
-
1,474,200.00
737,100.00
737,100.00
737,100.00
196,560.00
29-FEB-2024
540,540.00
Provisional Allotment
Notice Issued
BC
1800
NA
08-AUG-2020
-
-
20-JUN-2022
22A Sale agreement to be executed
1723
153
VIJAYAWADA
NTR
IP-Peddavaram
220
59811
SN ENGINEERING WORKS
09-AUG-2019
09-AUG-2019
-
-
245,700.00
0.00
245,700.00
245,700.00
24,570.00
29-FEB-2024
221,130.00
Provisional Allotment
Notice Issued
General
300
NA
08-AUG-2020
-
-
20-JUN-2022
22A Provisional Allotment
1723
154
VIJAYAWADA
NTR
IP-Peddavaram
102,103
59807
AMARAVATHI ASSOCIATES
09-AUG-2019
09-AUG-2019
-
-
491,400.00
245,700.00
245,700.00
245,700.00
221,130.00
29-FEB-2024
24,570.00
Provisional Allotment
Notice Issued
BC
600
NA
08-AUG-2020
-
-
20-JUN-2022
22A Provisional Allotment
1723
155
VIJAYAWADA
NTR
IP-Peddavaram
230
59814
SHIVA TOOLS
09-AUG-2019
09-AUG-2019
-
-
245,700.00
122,850.00
122,850.00
122,850.00
24,570.00
29-FEB-2024
98,280.00
Provisional Allotment
Notice Issued
BC
300
NA
08-AUG-2020
-
-
20-JUN-2022
22A Provisional Allotment
1723
156
VIJAYAWADA
NTR
IP-Peddavaram
187,188
59819
SREE MOHANAS ENGG WORKS
09-AUG-2019
09-AUG-2019
-
-
491,400.00
0.00
491,400.00
491,400.00
49,140.00
29-FEB-2024
442,260.00
Provisional Allotment
Notice Issued
Women,General
600
NA
08-AUG-2020
-
-
20-JUN-2022
22A Provisional Allotment
1723
157
VIJAYAWADA
NTR
IP-Peddavaram
19
59824
KSK BIOTECH
09-AUG-2019
09-AUG-2019
-
-
245,700.00
122,850.00
122,850.00
122,850.00
0.00
-
122,850.00
Provisional Allotment
Notice Issued
SC
300
NA
08-AUG-2020
-
-
20-JUN-2022
22A Provisional Allotment
1723
158
VIJAYAWADA
NTR
IP-Peddavaram
9
60706
JPN FABRICATORS
15-NOV-2019
15-NOV-2019
-
-
245,700.00
122,850.00
122,850.00
122,850.00
0.00
-
122,850.00
Provisional Allotment
Notice Issued
SC
300
NA
14-NOV-2020
-
-
20-JUN-2022
22A Provisional Allotment
1625
159
VIJAYAWADA
NTR
IP-Peddavaram
164,165,168,169
60723
SR CONTROL AUTOMATION
15-NOV-2019
15-NOV-2019
-
-
982,800.00
0.00
982,800.00
982,800.00
114,252.00
29-FEB-2024
868,548.00
Provisional Allotment
-
General
1200
NA
14-NOV-2020
-
-
-
22A Provisional Allotment
1625
160
VIJAYAWADA
NTR
IP-Peddavaram
159,160
60729
SR ELECTRICAL AUTOMATION
15-NOV-2019
15-NOV-2019
-
-
491,400.00
309,900.00
181,500.00
181,500.00
0.00
-
181,500.00
Provisional Allotment
Notice Issued
General
600
NA
14-NOV-2020
-
-
20-JUN-2022
22A Provisional Allotment
1625
161
VIJAYAWADA
NTR
IP-Peddavaram
213,214
60772
M.S.ENGINEERING
15-NOV-2019
15-NOV-2019
-
-
491,400.00
0.00
491,400.00
491,400.00
49,140.00
29-FEB-2024
442,260.00
Provisional Allotment
Notice Issued
General
600
NA
14-NOV-2020
-
-
20-JUN-2022
Provisional Allotment
1625
162
VIJAYAWADA
NTR
IP-Peddavaram
13
60904
Kesava Footware Industries
02-DEC-2019
02-DEC-2019
-
-
245,700.00
122,850.00
122,850.00
122,850.00
0.00
-
122,850.00
Provisional Allotment
Notice Issued
SC
300
NA
01-DEC-2020
-
-
20-JUN-2022
22A Provisional Allotment
1608
163
VIJAYAWADA
NTR
IP-Peddavaram
31,32
60990
RUPATHI INDUSTRIES
10-DEC-2019
10-DEC-2019
-
-
491,400.00
245,700.00
245,700.00
245,700.00
49,140.00
29-FEB-2024
196,560.00
Provisional Allotment
Notice Issued
BC
600
NA
09-DEC-2020
-
-
20-JUN-2022
22A Sale Agreement To be Executed
1600
164
VIJAYAWADA
NTR
IP-Peddavaram
153,154,155
61047
SRI KANAKADURGA INDUSTRIES
16-DEC-2019
16-DEC-2019
-
-
737,100.00
0.00
737,100.00
737,100.00
73,710.00
29-FEB-2024
663,390.00
Provisional Allotment
Notice Issued
General
900
NA
15-DEC-2020
-
-
20-JUN-2022
22A Sale agreement to be executed
1594
165
VIJAYAWADA
NTR
IP-Peddavaram
12
61575
SEALTECHENINEERS & FABRICATORS
09-JUL-2022
09-JUL-2022
-
-
245,700.00
122,850.00
122,850.00
122,850.00
0.00
-
122,850.00
Provisional Allotment
Cancelled
SC
300
NA
31-MAR-2025
-
-
-
22A REALLOTMENT UNDEYSR JVBM Land cost not paid
658
166
VIJAYAWADA
NTR
IP-Peddavaram
223,224,225,226
62144
SRI SATYA SAI ENGINEERING WORKS
16-DEC-2020
16-DEC-2020
-
-
982,800.00
491,400.00
491,400.00
491,400.00
129,880.00
29-FEB-2024
361,520.00
Provisional Allotment
Notice Issued
BC,Women
1200
NA
15-DEC-2024
-
-
20-JUN-2022
22A Provisional Allotment
1228
167
VIJAYAWADA
NTR
IP PEDDAVARAM PH-I
23,24,25
62441
SREE VISHNU ORGANIC SCIENCES PVT LTD
19-FEB-2021
19-FEB-2021
-
-
10,432,896.00
2,000,000.00
8,432,896.00
8,432,896.00
1,043,290.00
29-FEB-2024
7,389,606.00
Provisional Allotment
-
BC,Women
9696
NA
18-FEB-2025
-
-
-
22A Provisional Allotment
1163
168
VIJAYAWADA
NTR
IP_JAGGAIAHPET
PLOT NO_28
58683
M/s UNIVERSAL TRADERS
09-JUL-2022
09-JUL-2022
-
-
2,274,252.00
1,137,126.00
1,137,126.00
1,137,126.00
0.00
-
1,137,126.00
Provisional Allotment
NA
SC
1750
NA
31-MAR-2025
-
-
-
Provisional
658
169
VIJAYAWADA
NTR
IP_JAGGAIAHPET
PLOT NO_28
40278
UNIVERSAL TRADERS
09-JUL-2022
09-JUL-2022
-
-
2,100,000.00
-
-
2,100,000.00
0.00
-
2,100,000.00
Provisional Allotment
NA
SC
1750
NA
31-MAR-2025
-
-
-
Reallotment of G.O Ms No.7 in JBV
658
170
VIJAYAWADA
NTR
IP_JAGGAIAHPET
AB_3
58763
M/s. SSANA INDUSTRIES
22-NOV-2012
22-NOV-2012
-
-
1,144,800.00
0.00
1,144,800.00
1,144,800.00
0.00
-
1,144,800.00
Sale Deed
-
General
944
G1
26-MAR-2020
-
-
-
working
4174
171
VIJAYAWADA
NTR
IP_JAGGAIAHPET
PLOT NO_167,PLOT NO_167
53543
Rishi Engineering
09-JUL-2022
09-JUL-2022
-
-
6,657,000.00
1,664,250.00
4,992,750.00
4,992,750.00
0.00
-
4,992,750.00
Provisional Allotment
NA
SC
1902
NA
31-MAR-2025
-
-
-
Reallotment under Go No 7 JBV
658
172
VIJAYAWADA
NTR
IP_JAGGAIAHPET
PLOT NO_162
54885
REENA INDUSTRIES
03-SEP-2022
03-SEP-2022
-
-
3,930,500.00
1,965,250.00
1,965,250.00
1,965,250.00
491,200.00
29-FEB-2024
1,474,050.00
Provisional Allotment
-
SC
1123
NA
31-MAR-2025
-
-
-
REALLOTMENT UNDER YSR JVBM. Land cost to be paid
602
173
VIJAYAWADA
NTR
IP_JAGGAIAHPET
PLOT NO_145-2,PLOT NO_145-2
54880
NIBA SECURED OFFSET PRINT SOLUTIONS
17-JAN-2023
17-JAN-2023
-
-
6,748,000.00
1,596,000.00
5,152,000.00
5,152,000.00
0.00
-
5,152,000.00
Provisional Allotment
NA
SC
1928
NA
31-MAR-2025
-
-
-
Reallotment under YSR JBVM.Land cost not paid
466
174
VIJAYAWADA
NTR
IP_JAGGAIAHPET
PLOT NO_145-1,PLOT NO_145-1
54883
BLUE POLYMERS
17-JAN-2023
17-JAN-2023
-
-
6,825,000.00
1,604,750.00
5,220,250.00
5,220,250.00
0.00
-
5,220,250.00
Provisional Allotment
NA
SC
1950
NA
31-MAR-2025
-
-
-
REALLOTMENT UNDER YSR JVBM. Land cost to be paid
466
175
VIJAYAWADA
NTR
IP_JAGGAIAHPET
PLOT NO_163
54882
ROHITH CNC TECHNOLOGIES
03-SEP-2022
03-SEP-2022
-
-
3,808,000.00
1,904,000.00
1,904,000.00
1,904,000.00
480,400.00
29-FEB-2024
1,423,600.00
Provisional Allotment
-
SC
1088
NA
31-MAR-2025
-
-
-
JVBM.Allottee.Balance land cost to be paid
602
176
VIJAYAWADA
NTR
IP_JAGGAIAHPET
PLOT NO_152-2
56002
VISION TECHNOLOGIES
24-JAN-2023
24-JAN-2023
-
-
1,575,000.00
787,500.00
787,500.00
787,500.00
0.00
-
787,500.00
Provisional Allotment
NA
SC
450
NA
31-MAR-2025
-
-
-
REALLOTMENT UNDER YSR JVBM. Land cost to be paid
459
177
VIJAYAWADA
NTR
IP_JAGGAIAHPET
PLOT NO_152-1,PLOT NO_152-1
56001
Madugula Prameela
18-JAN-2023
18-JAN-2023
-
-
4,788,000.00
1,664,250.00
3,123,750.00
3,123,750.00
1,664,250.00
29-FEB-2024
1,459,500.00
Provisional Allotment
NA
SC_W
1368
NA
31-MAR-2025
-
-
-
Reallotment under YSR JBVM.Land cost not paid.
465
178
VIJAYAWADA
NTR
IP_VIJAYAWADA
APSPDCL
47379
APSPDCL
24-APR-2015
24-APR-2015
-
-
11,310.00
-
-
11,310.00
0.00
-
11,310.00
Provisional Allotment
Notice Issued
General
472
G1
24-APR-2017
-
-
18-JUN-2019
Working
3291