S.No  |  DISTRICT  |  ZONE  |  INDUSTRIAL PARK  |  PLOT NO  |  ALLOTMENT NUMBER  |  NAME OF THE INDUSTRY  |  ALLOTMENT DATE  |  PROVISIONAL ALLOTMENT DATE  |  FINAL ALLOTMENT DATE  |  DATE OF PHYSICAL POSSESSION  |  ALLOTMENT VALUE  |  REBATE AMOUNT  |  NET ALLOTMENT VALUE  |  ADVANCE TO BE PAID  |  AMOUNT RECEIVED  |  LAST PAID DATE  |  BALANCE ADVANCE AMOUNT  |  STATUS OF ALLOTMENT  |  CANCELLATION  |  CATEGORY OF ALLOTMENT  |  EXTENT IN SQM  |  IMPLEMENTATION STATUS CODE NEW  |  IMPLEMENTATION DUE DATE  |  DCP DATE  |  EOT PERIOD  |  NOTICE ISSUED DATE  |  IMPL ZM REMARKS  |  ALLOTMENT AGE IN DAYS  |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_423,AN_424 |
65460 |
M/s MADHU AUTOZONE |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
387,600.00
|
0.00 |
387,600.00 |
387,600.00 |
194,260.00 |
06-APR-2024 |
193,340.00 |
Provisional Allotment |
- |
NA |
200 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
63 |
2 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_49 |
65462 |
MOHAMMED AUTO MOBILES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
NA |
300 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment order issued |
63 |
3 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_131,AN_132,AN_133 |
65461 |
NAVEENA AGENCIES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
2,246,142.00
|
0.00 |
2,246,142.00 |
2,246,142.00 |
1,443,373.00 |
25-APR-2024 |
802,769.00 |
Provisional Allotment |
- |
NA |
1159 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
63 |
4 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_224 |
65466 |
ZUBAIR CAR WATER SERVICE |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
1,124,040.00
|
0.00 |
1,124,040.00 |
1,124,040.00 |
112,404.00 |
29-FEB-2024 |
1,011,636.00 |
Provisional Allotment |
- |
NA |
580 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment order issued |
63 |
5 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_139 |
65467 |
M/s YADAV AUTOMOBILES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
NA |
300 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
63 |
6 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_69 |
65469 |
SANA TINKERING WORK SHOP |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
NA |
300 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment order issued |
63 |
7 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_98,AN_99 |
65472 |
ANU MOTORS REPAIRINGS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
145,350.00 |
02-APR-2024 |
1,017,450.00 |
Provisional Allotment |
- |
NA |
600 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
63 |
8 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_57 |
65488 |
GOUSE CAR MECHANIC |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
NA |
300 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotmen orders issued |
63 |
9 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_141 |
65490 |
SRI VENKATESWARA RE-BORE WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
NA |
300 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment order issued |
63 |
10 |
KADAPA |
Annamayya |
MSME, PILER |
38,39 |
65491 |
M/s SLV TAILORING AND READYMADE GARMENTS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
501,779.00
|
0.00 |
501,779.00 |
501,779.00 |
41,786.00 |
15-APR-2024 |
459,993.00 |
Provisional Allotment |
- |
NA |
540 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment order issued |
63 |
11 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_434,AN_435,AN_470,AN_471 |
65495 |
SULTHAN AUTO GARAGE |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
790,704.00
|
0.00 |
790,704.00 |
790,704.00 |
77,520.00 |
29-FEB-2024 |
713,184.00 |
Provisional Allotment |
- |
NA |
400 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
63 |
12 |
KADAPA |
Annamayya |
MSME, PILER |
77 |
65496 |
NSD RAJU PAPER PLATES MANUFACTURING UNIT |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
557,532.00
|
0.00 |
557,532.00 |
557,532.00 |
0.00 |
- |
557,532.00 |
Provisional Allotment |
- |
NA |
300 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
63 |
13 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_100,AN_101 |
65515 |
M/s ARFA ENTERPRISES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
116,280.00 |
29-FEB-2024 |
1,046,520.00 |
Provisional Allotment |
- |
NA |
600 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment order issued |
63 |
14 |
KADAPA |
Annamayya |
MSME, PILER |
36,37 |
65520 |
M/s PREMCHAND GROUNDNUT OIL INDUSTRY |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
557,532.00
|
278,766.00 |
278,766.00 |
278,766.00 |
0.00 |
- |
278,766.00 |
Provisional Allotment |
- |
NA |
600 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
63 |
15 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_24 |
65525 |
UNIVERSAL DIESEL WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
565,353.00
|
0.00 |
565,353.00 |
565,353.00 |
55,427.00 |
29-FEB-2024 |
509,926.00 |
Provisional Allotment |
- |
NA |
287 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment order issued |
63 |
16 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_381 |
65529 |
M/s SHAHEENA AUTO ZONE |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
19,380.00 |
29-FEB-2024 |
174,420.00 |
Provisional Allotment |
- |
NA |
100 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
63 |
17 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_54 |
65528 |
SAI DURGA ENGINEERING WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
NA |
300 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
63 |
18 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_298,AN_299 |
65534 |
M/s SRI VENKATESWARA AUTO DIESEL WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
316,280.00 |
25-APR-2024 |
846,520.00 |
Provisional Allotment |
- |
- |
600 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
63 |
19 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_195 |
65536 |
SRI LAKSHMI VENKATESWARA AUTO DENTING WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
0.00 |
- |
581,400.00 |
Provisional Allotment |
- |
- |
300 |
NA |
21-FEB-2026 |
- |
- |
- |
Privisional Allotment orders issued |
63 |
20 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_309 |
65539 |
M/s MOKHITHA AUTO SERVICE MOTORS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
- |
300 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
63 |
21 |
KADAPA |
Annamayya |
MSME, PILER |
66 |
65543 |
M/s. Gouse Water Servicesing Centre |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
278,766.00
|
0.00 |
278,766.00 |
278,766.00 |
27,330.00 |
29-FEB-2024 |
251,436.00 |
Provisional Allotment |
- |
- |
300 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
63 |
22 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_492,AN_517 |
65566 |
M/s SONU AUTO GARRIAGE |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
366,282.00
|
0.00 |
366,282.00 |
366,282.00 |
79,884.00 |
29-MAR-2024 |
286,398.00 |
Provisional Allotment |
- |
NA |
180 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
63 |
23 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_431 |
65572 |
M/s A K ENTERPRISES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
19,380.00 |
29-FEB-2024 |
174,420.00 |
Provisional Allotment |
- |
- |
100 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
63 |
24 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_72 |
65579 |
C M CAR MECHANIC |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
General |
300 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
63 |
25 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_74 |
65581 |
VGR AUTO MOBILE SERVICES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
BC |
300 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
63 |
26 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_145 |
65584 |
SIVA SHANKAR ENTERPRISES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
290,700.00 |
290,700.00 |
290,700.00 |
0.00 |
- |
290,700.00 |
Provisional Allotment |
- |
SC |
300 |
NA |
21-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
63 |
27 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_438,AN_467 |
66007 |
KIRAN AUTO ZONE |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
387,600.00
|
0.00 |
387,600.00 |
387,600.00 |
0.00 |
- |
387,600.00 |
Provisional Allotment |
- |
BC,Others |
200 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
41 |
28 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_438,AN_439,AN_466,AN_467 |
65856 |
S K V ARC WELDING SHOP |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
773,262.00
|
0.00 |
773,262.00 |
773,262.00 |
73,644.00 |
29-FEB-2024 |
699,618.00 |
Provisional Allotment |
- |
BC,Others |
380 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
29 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_440,AN_441,AN_464,AN_465 |
65857 |
SHAIK HASAN BASHA ENGINEERING WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
773,262.00
|
0.00 |
773,262.00 |
773,262.00 |
73,644.00 |
29-FEB-2024 |
699,618.00 |
Provisional Allotment |
- |
Minority,Others |
380 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment orders issued |
41 |
30 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_122,AN_123 |
65858 |
VENKATESH AUTO MOBILES SERVICE |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
116,280.00 |
29-FEB-2024 |
1,046,520.00 |
Provisional Allotment |
- |
General,Others |
600 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment orders issued |
41 |
31 |
KADAPA |
Annamayya |
MSME, PILER |
160,161,162,163 |
65861 |
SRI LAKSHMI WOODEN INDUSTRY |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,093,200.00
|
- |
- |
1,093,200.00 |
546,600.00 |
22-MAR-2024 |
546,600.00 |
Provisional Allotment |
- |
BC,Others |
1200 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment orders issued |
41 |
32 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_186,AN_187 |
65864 |
N V R ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,374,042.00
|
687,021.00 |
687,021.00 |
687,021.00 |
0.00 |
- |
687,021.00 |
Provisional Allotment |
- |
SC,Others |
709 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment orders issued |
41 |
33 |
KADAPA |
Annamayya |
IP AND AN_PILER |
41,42 |
65865 |
SRI CHOWDESHWARI TEXTILES AND READYMADES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
4,601,897.00
|
0.00 |
4,601,897.00 |
4,601,897.00 |
451,166.00 |
29-FEB-2024 |
4,150,731.00 |
Provisional Allotment |
- |
General,Others |
1550 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment orders issued |
41 |
34 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_145 |
65868 |
M D AUTO GARAGE |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
581,400.00
|
- |
- |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
Minority,Others |
300 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
35 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_93 |
65869 |
J B WATER WASH |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
0.00 |
- |
581,400.00 |
Provisional Allotment |
- |
SC,Others |
300 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
36 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_79 |
65872 |
RAMESH ELECTRICAL WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
BC,Others |
300 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
37 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_127,AN_128 |
65874 |
M N R AUTO MOBILE SERVICES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
116,280.00 |
29-FEB-2024 |
1,046,520.00 |
Provisional Allotment |
- |
General,Others |
600 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
38 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_193 |
65885 |
DSNR CAR WASH AND DECORS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
90,700.00 |
30-MAR-2024 |
490,700.00 |
Provisional Allotment |
- |
ST,Others |
300 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
39 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_257 |
65886 |
SREE VENKATESWARA TWO WHEELER AND FOUR WHEELER SER |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
843,030.00
|
0.00 |
843,030.00 |
843,030.00 |
421,515.00 |
24-APR-2024 |
421,515.00 |
Provisional Allotment |
- |
SC,Others |
435 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
40 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_260 |
65888 |
RAMANA AUTO DIESEL WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
843,030.00
|
0.00 |
843,030.00 |
843,030.00 |
0.00 |
- |
843,030.00 |
Provisional Allotment |
- |
SC,Others |
435 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional allotment order issued |
41 |
41 |
KADAPA |
Annamayya |
MSME, PILER |
160,161 |
65890 |
SRI VENKATESHWARA ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
557,532.00
|
278,766.00 |
278,766.00 |
278,766.00 |
54,660.00 |
29-FEB-2024 |
224,106.00 |
Provisional Allotment |
- |
General,Others |
600 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
42 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_369,AN_370 |
65896 |
N V R ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
0.00 |
- |
1,162,800.00 |
Provisional Allotment |
- |
SC,Others |
600 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
43 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_422 |
65900 |
MASHAALLAH CAR DIESEL MECHANIC |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
19,380.00 |
29-FEB-2024 |
174,420.00 |
Provisional Allotment |
- |
BC,Others |
100 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment orders issued |
41 |
44 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_421 |
65901 |
MD AUTO TINKERING |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
19,380.00 |
29-FEB-2024 |
174,420.00 |
Provisional Allotment |
- |
BC,Others |
100 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
45 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_154,AN_165 |
65903 |
SANDRA AUTO GARAGE |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
116,280.00 |
29-FEB-2024 |
1,046,520.00 |
Provisional Allotment |
- |
General,Others |
600 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
46 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_420 |
65906 |
BISMILLAH MOHAMMAD TRACTOR MECHANIC SERVICE |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
19,380.00 |
29-FEB-2024 |
174,420.00 |
Provisional Allotment |
- |
BC,Others |
100 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
47 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_68 |
65907 |
BISMILLAH IRON WORKS AND FRAMES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
Minority,Others |
300 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
48 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_163 |
65909 |
S S S AUTO MECHANIC |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
Minority,Others |
300 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
49 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_380 |
65910 |
ZAYAN AUTO EXTRA FITTING WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
143,800.00 |
10-APR-2024 |
50,000.00 |
Provisional Allotment |
- |
General,Others |
100 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
50 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_155,AN_156 |
65911 |
SHAIK MOHAMMED SAMAN ELECTRICAL WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
116,280.00 |
29-FEB-2024 |
1,046,520.00 |
Provisional Allotment |
- |
Minority,Others |
600 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
51 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_419 |
65915 |
MUBARAK AUTO ZONE |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
19,380.00 |
29-FEB-2024 |
174,420.00 |
Provisional Allotment |
- |
BC,Others |
100 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
52 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_383 |
65919 |
PUSHPA ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
19,380.00 |
29-FEB-2024 |
174,420.00 |
Provisional Allotment |
- |
General,Others |
100 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
53 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_440,AN_465 |
65926 |
SUBBU ARC WELDING GARAGE |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
348,840.00
|
0.00 |
348,840.00 |
348,840.00 |
34,884.00 |
29-FEB-2024 |
313,956.00 |
Provisional Allotment |
- |
BC,Others |
180 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
41 |
54 |
KADAPA |
Annamayya |
MSME, PILER |
200,206 |
65929 |
SRI VENKATESWARA SPICES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
546,600.00
|
0.00 |
546,600.00 |
546,600.00 |
54,660.00 |
29-FEB-2024 |
491,940.00 |
Provisional Allotment |
- |
General,Technocrat |
600 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
41 |
55 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_430 |
65935 |
MASHA ALLAH AUTO MOBILE WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
19,380.00 |
29-FEB-2024 |
174,420.00 |
Provisional Allotment |
- |
BC,Others |
100 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
41 |
56 |
KADAPA |
Annamayya |
MSME Park - Tallapaka |
Plot No.81,Plot No.82 |
65871 |
DEVALRAJU INDUSTRIES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
2,378,448.00
|
0.00 |
2,378,448.00 |
2,378,448.00 |
237,845.00 |
29-FEB-2024 |
2,140,603.00 |
Provisional Allotment |
- |
General,Others |
2988 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
57 |
KADAPA |
Annamayya |
MSME Park - Tallapaka |
Plot No.10 |
65943 |
CSR Enterprises |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
845,352.00
|
0.00 |
845,352.00 |
845,352.00 |
84,535.00 |
05-MAR-2024 |
760,817.00 |
Provisional Allotment |
- |
General,Others |
1062 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
41 |
58 |
KADAPA |
YSR |
MSE - CDP |
Plot No 31 |
65878 |
RAMU INDUSTRY |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,443,112.00
|
0.00 |
1,443,112.00 |
1,443,112.00 |
144,311.00 |
29-FEB-2024 |
1,298,801.00 |
Provisional Allotment |
- |
General,Others |
1012 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment Letter issued |
41 |
59 |
KADAPA |
YSR |
MIP_KOPPARTHY- Ph-I |
Plot_160,Plot_161 |
65916 |
ASB ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
10,271,184.00
|
0.00 |
10,271,184.00 |
10,271,184.00 |
1,027,119.00 |
29-FEB-2024 |
9,244,065.00 |
Provisional Allotment |
- |
BC,Others |
16674 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
41 |
60 |
KADAPA |
YSR |
MIP_KOPPARTHY- Ph-I |
Plot_132B |
65920 |
TEJA GLASSTECH |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
2,293,984.00
|
0.00 |
2,293,984.00 |
2,293,984.00 |
229,398.00 |
29-FEB-2024 |
2,064,586.00 |
Provisional Allotment |
- |
General,Others |
3724 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment orders issued |
41 |
61 |
KADAPA |
YSR |
MIP_KOPPARTHY- Ph-I |
Plot_163 |
65921 |
TEJ PHARMA |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
4,985,904.00
|
0.00 |
4,985,904.00 |
4,985,904.00 |
498,590.00 |
29-FEB-2024 |
4,487,314.00 |
Provisional Allotment |
- |
General,Others |
8094 |
NA |
14-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
62 |
KADAPA |
YSR |
YSR EMC - KOPPARTHY |
Plot No.26,Plot No.27,Plot No.33,Plot No.34 |
65977 |
Channelplay Limited |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
12,128,886.00
|
0.00 |
12,128,886.00 |
12,128,886.00 |
1,212,888.00 |
29-FEB-2024 |
10,915,998.00 |
Provisional Allotment |
- |
general |
40842 |
NA |
15-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
63 |
KADAPA |
YSR |
YSR EMC - KOPPARTHY |
Plot No.10,Plot No.11,Plot No.12,Plot No.13,Plot No.14,Plot No.15 |
66090 |
Teknodome India Private Limited |
22-MAR-2024 |
22-MAR-2024 |
- |
- |
4,857,435.00
|
0.00 |
4,857,435.00 |
4,857,435.00 |
485,744.00 |
19-MAR-2024 |
4,371,691.00 |
Provisional Allotment |
- |
General |
16355 |
R3 |
21-MAR-2026 |
- |
- |
- |
- |
34 |
64 |
KADAPA |
YSR |
YSR JAGANANNA MEGA INDUST. HUB |
Plot No.223 |
65482 |
VENNELA INDUSTRIES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
5,859,000.00
|
0.00 |
5,859,000.00 |
5,859,000.00 |
0.00 |
- |
5,859,000.00 |
Provisional Allotment |
- |
NA |
9450 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
63 |
65 |
KADAPA |
YSR |
YSR JAGANANNA MEGA INDUST. HUB |
Plot No.27 |
65609 |
Adeep Life Sciences Private Limited |
23-FEB-2024 |
23-FEB-2024 |
- |
- |
64,028,640.00
|
0.00 |
64,028,640.00 |
64,028,640.00 |
31,688,084.00 |
04-APR-2024 |
32,340,556.00 |
Provisional Allotment |
- |
NA |
103272 |
NA |
22-FEB-2026 |
- |
- |
- |
Provisional Allotment orders issued |
62 |
66 |
KADAPA |
YSR |
YSR JAGANANNA MEGA INDUST. HUB |
Common Amentity -2B |
65957 |
SANCTUARY HOTEL AND RESORTS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
9,653,586.00
|
0.00 |
9,653,586.00 |
9,653,586.00 |
567,858.00 |
29-FEB-2024 |
9,085,728.00 |
Provisional Allotment |
- |
general |
9160 |
NA |
15-MAR-2026 |
- |
- |
- |
Provisional Allotment order issued |
41 |
67 |
KADAPA |
YSR |
YSR JAGANANNA MEGA INDUST. HUB |
Common Amentity - 2C |
65958 |
SANCTUARY HOTEL AND RESORTS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
20,935,602.00
|
0.00 |
20,935,602.00 |
20,935,602.00 |
1,231,506.00 |
29-FEB-2024 |
19,704,096.00 |
Provisional Allotment |
- |
general |
19864 |
NA |
15-MAR-2026 |
- |
- |
- |
Provisional Allotment Order issued |
41 |
68 |
KADAPA |
YSR |
YSR JAGANANNA MEGA INDUST. HUB |
Plot No.208,Plot No.209,Plot No.210,Plot No.217,Plot No.218,Plot No.219 |
65983 |
Varun Motors Pvt Ltd |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
24,862,000.00
|
0.00 |
24,862,000.00 |
24,862,000.00 |
2,486,200.00 |
29-FEB-2024 |
22,375,800.00 |
Provisional Allotment |
- |
General,Others |
40100 |
NA |
15-MAR-2026 |
- |
- |
- |
Provisional Allotment orders issued |
41 |