S.No   DISTRICT   ZONE   INDUSTRIAL PARK   PLOT NO   ALLOTMENT NUMBER   NAME OF THE INDUSTRY   ALLOTMENT DATE   PROVISIONAL ALLOTMENT DATE   FINAL ALLOTMENT DATE   DATE OF PHYSICAL POSSESSION   ALLOTMENT VALUE   REBATE AMOUNT   NET ALLOTMENT VALUE   ADVANCE TO BE PAID   AMOUNT RECEIVED   LAST PAID DATE   BALANCE ADVANCE AMOUNT   STATUS OF ALLOTMENT   CANCELLATION   CATEGORY OF ALLOTMENT   EXTENT IN SQM   IMPLEMENTATION STATUS CODE NEW   IMPLEMENTATION DUE DATE   DCP DATE   EOT PERIOD   NOTICE ISSUED DATE   IMPL ZM REMARKS   ALLOTMENT AGE IN DAYS 
1
ANAKAPALLI
Anakapalli
IP_PARAWADA_PH_III
13G1
65325
MARTISHA INDUSTRIES
22-DEC-2023
26-DEC-2023
-
-
5,570,496.00
0.00
5,570,496.00
1,392,624.00
891,817.00
29-FEB-2024
500,807.00
Provisional Allotment
-
SC,Women
1018
NA
26-DEC-2025
-
-
-
PAO issued
123
2
CHITTOOR
Chittoor
IP GD NELLORE
Plot No.29
65314
M/S. ECONECTAR BIO PRODUCTS
22-DEC-2023
26-DEC-2023
-
-
1,565,374.00
0.00
1,565,374.00
391,344.00
0.00
-
391,344.00
Provisional Allotment
NA
SC
1260
R3
26-DEC-2025
-
-
01-MAR-2024
Provisional allotment orders issued on 26.12.2023.Requested for Extension of time for payment of land cost-lntimation dt 01.03.2024.
123
3
GUNTUR
Bapatla
AN CHIRALA
10,11
65045
M/s. Vinod Enterprises
20-NOV-2023
21-NOV-2023
-
-
872,820.00
0.00
872,820.00
218,205.00
0.00
-
218,205.00
Provisional Allotment
-
SC
390
R3
19-NOV-2025
-
-
-
-
158
4
GUNTUR
Bapatla
AN CHIRALA
41
65183
Nemalikanti Mariya Babu
20-NOV-2023
21-NOV-2023
-
-
402,840.00
0.00
402,840.00
100,710.00
0.00
-
100,710.00
Provisional Allotment
-
SC
180
R3
19-NOV-2025
-
-
30-DEC-2023
Provisional Allotment orders issued. Notice has issued to pay the Land cost.
158
5
GUNTUR
Bapatla
AN CHIRALA
65,66
65184
M/s. Anil mechanical works
20-NOV-2023
21-NOV-2023
-
-
879,534.00
0.00
879,534.00
219,884.00
0.00
-
219,884.00
Provisional Allotment
-
SC
393
R3
19-NOV-2025
-
-
30-DEC-2023
Provisional Allotment orders issued. Notice issued for payment of the Land cost.
158
6
GUNTUR
Bapatla
AN CHIRALA
163,174
65185
M/s UMA MAHESWARI WELDING WORKS
20-NOV-2023
21-NOV-2023
-
-
949,360.00
0.00
949,360.00
237,340.00
0.00
-
237,340.00
Provisional Allotment
-
SC
404
R3
19-NOV-2025
-
-
30-DEC-2023
Provisional Allotment orders issued. Notice has issued to pay the Land cost.
158
7
GUNTUR
Bapatla
AN CHIRALA
61
65303
M/s. RATNA KAMALA AUTOMOBILES
22-DEC-2023
23-DEC-2023
-
-
452,076.00
0.00
452,076.00
113,019.00
0.00
-
113,019.00
Provisional Allotment
-
SC
202
R3
26-DEC-2025
-
-
22-JAN-2024
Provisional allotment orders has been released.
126
8
GUNTUR
Bapatla
AN CHIRALA
98
65310
M/s. Lakshmi Industries
22-DEC-2023
23-DEC-2023
-
-
568,452.00
0.00
568,452.00
142,113.00
142,002.00
22-MAR-2024
111.00
Provisional Allotment
-
SC
254
R3
26-DEC-2025
-
-
22-JAN-2024
Provisonal Allotment oders has been issued. Issued and notice for payment of Land cost.
126
9
GUNTUR
Bapatla
AN CHIRALA
68,69
65332
M/s. Kiran Fabricators
22-DEC-2023
23-DEC-2023
-
-
868,344.00
0.00
868,344.00
217,086.00
0.00
-
217,086.00
Provisional Allotment
-
SC
388
R3
26-DEC-2025
-
-
22-JAN-2024
Provisonal Allotment oders has been issued. Issued and notice for payment of Land cost.
126
10
GUNTUR
Palnadu
MSME-PIDUGURALLA
25
65311
MAMATHA JASHUVA FOUNDARIES WORKS
22-DEC-2023
23-DEC-2023
-
-
245,511.00
122,756.00
122,755.00
30,689.00
0.00
-
30,689.00
Provisional Allotment
-
SC,Women
81
R3
26-DEC-2025
-
-
22-JAN-2024
Provisonal Allotment oders has been issued. Issued and notice for payment of Land cost.
126
11
GUNTUR
Palnadu
MSME-RAYAVARAM
110,111,122,123
65052
M/s. KK Industries
20-NOV-2023
21-NOV-2023
-
-
466,800.00
-
-
116,700.00
0.00
-
116,700.00
Provisional Allotment
-
SC
1200
R3
19-NOV-2025
-
-
-
-
158
12
GUNTUR
Palnadu
MSME-RAYAVARAM
84,85,86,93,94,95
65174
M/s. B M L Industries
20-NOV-2023
21-NOV-2023
-
-
700,200.00
0.00
700,200.00
175,050.00
0.00
-
175,050.00
Provisional Allotment
-
SC
1800
R3
19-NOV-2025
-
-
-
-
158
13
KADAPA
Annamayya
IP AND AN_PILER
77
65081
BHAGYALAKSHMI READY MADE GARMENTS MANUFACTURING UNIT
20-NOV-2023
21-NOV-2023
-
-
5,079,614.00
2,000,000.00
3,079,614.00
769,904.00
251,100.00
29-FEB-2024
518,804.00
Provisional Allotment
-
ST
2627
NA
19-NOV-2025
-
-
-
Provisional allotment order issued
158
14
KADAPA
Annamayya
IP AND AN_PILER
AN_226,AN_227
65129
DHARSHA INDUSTRIES
20-NOV-2023
21-NOV-2023
-
-
2,248,080.00
0.00
2,248,080.00
562,020.00
300,000.00
29-FEB-2024
262,020.00
Provisional Allotment
-
SC,Women
1160
NA
19-NOV-2025
-
-
-
Provisional allotment order issued
158
15
KADAPA
Annamayya
MSME, PILER
224,225
65294
Hima's Dairy Products
22-DEC-2023
23-DEC-2023
-
-
714,570.00
379,396.00
335,174.00
83,794.00
0.00
-
83,794.00
Provisional Allotment
-
SC,Women
769
NA
26-DEC-2025
-
-
-
Provisional allotment letter issued
126
16
KADAPA
YSR
IDP_PULIVENDULA
UDL - 11
65101
MAHATHI ENGINEERING WORKS
20-NOV-2023
21-NOV-2023
-
-
6,320,629.00
2,000,000.00
4,320,629.00
1,080,157.00
0.00
-
1,080,157.00
Land Cost Paid
-
SC
13593
NA
19-NOV-2025
-
-
-
Provisional Allotment Letter issued
158
17
KADAPA
YSR
MSE - CDP
Plot No 34
65015
SUDHAKAR HEALTH CARE
20-NOV-2023
21-NOV-2023
-
-
1,443,112.00
0.00
1,443,112.00
360,778.00
189,467.00
29-FEB-2024
171,311.00
Provisional Allotment
-
SC
2024
NA
19-NOV-2025
-
-
-
Provisional Allotment order issued
158
18
KADAPA
YSR
MSE - CDP
Plot No 70,Plot No 71
65288
M/s. SREE BHAAVO ENTERPRISES
22-DEC-2023
23-DEC-2023
-
-
4,703,918.00
0.00
4,703,918.00
1,175,980.00
430,000.00
22-MAR-2024
745,980.00
Provisional Allotment
-
SC
6468
NA
26-DEC-2025
-
-
-
Provisional allotment order issued
126
19
KADAPA
YSR
YSR JAGANANNA MEGA INDUST. HUB
Plot No.214
65106
ITLA GASES
20-NOV-2023
21-NOV-2023
-
-
5,440,904.00
2,000,000.00
3,440,904.00
860,226.00
0.00
-
860,226.00
Provisional Allotment
-
ST,Women
8776
NA
19-NOV-2025
-
-
-
Provisional Allotment Letter issued
158
20
KADAPA
YSR
YSR JAGANANNA MEGA INDUST. HUB
Plot No.169B-1
65277
PARVATHI PACKING
22-DEC-2023
23-DEC-2023
-
-
2,515,960.00
1,257,764.00
1,258,196.00
314,549.00
0.00
-
314,549.00
Provisional Allotment
-
SC,Women
4058
NA
26-DEC-2025
-
-
-
Provisional allotment order issued
126
21
KAKINADA
Kakinada
IP-KAKINADA EXPN.PHASE-II
PLOT104
65273
MS Industries
22-DEC-2023
30-DEC-2023
-
-
14,771,880.00
2,000,000.00
12,771,880.00
3,192,970.00
3,192,560.00
29-FEB-2024
410.00
Provisional Allotment
-
ST,Women
888
R3
26-DEC-2025
-
-
-
Provisional Allotmnet orders issued on 31.12.2023
119
22
TIRUPATI SPL PROJECTS
Sri Potti Sriramulu Nellore
MSME Park Kothapalli KoruGunta
10
65104
Tanush Lorry Body Building Works
20-NOV-2023
24-NOV-2023
-
-
1,598,625.00
799,313.00
799,312.00
199,828.00
0.00
-
199,828.00
Land Cost Paid
-
SC
875
NA
19-NOV-2025
-
-
-
Provisional allotment issued on 24.11.2023. 25% Land cost paid, final allot. is under process.
155
23
TIRUPATI SPL PROJECTS
Sri Potti Sriramulu Nellore
MSME Park Kothapalli KoruGunta
31-B
65108
Sri Lakshmi Venkateswara Mechanical & Hydraulic Works
20-NOV-2023
24-NOV-2023
-
-
274,050.00
137,025.00
137,025.00
34,256.00
0.00
-
34,256.00
Land Cost Paid
-
SC
150
NA
19-NOV-2025
-
-
-
Provisional allotment issued on 24.11.2023. 50% Land cost paid, final allot. is under process.
155
24
TIRUPATI SPL PROJECTS
Sri Potti Sriramulu Nellore
MSME Park Kothapalli KoruGunta
46
65109
Sri Bhagavan Venkaiah Swamy Mechanical Works
20-NOV-2023
24-NOV-2023
-
-
548,100.00
274,050.00
274,050.00
68,513.00
0.00
-
68,513.00
Land Cost Paid
NA
SC
300
NA
19-NOV-2025
-
-
-
Provisional allotment issued on 24.11.2023. 50% Land cost paid, final allot. is under process.
155
25
TIRUPATI SPL PROJECTS
Sri Potti Sriramulu Nellore
MSME Park Kothapalli KoruGunta
112
65110
Ramya Tinkering & Gas Welding Works
20-NOV-2023
23-NOV-2023
-
-
548,100.00
274,050.00
274,050.00
68,513.00
0.00
-
68,513.00
Land Cost Paid
-
SC
300
NA
19-NOV-2025
-
-
-
Provisional allotment issued on 24.11.2023. 50% Land cost paid, final allot. is under process.
156
26
TIRUPATI SPL PROJECTS
Sri Potti Sriramulu Nellore
MSME Park Kothapalli KoruGunta
44
65111
Chandra Auto Garrage
20-NOV-2023
24-NOV-2023
-
-
548,100.00
274,050.00
274,050.00
68,513.00
0.00
-
68,513.00
Land Cost Paid
-
SC
300
NA
19-NOV-2025
-
-
-
Provisional allotment issued on 24.11.2023. 50% Land cost paid, final allot. is under process.
155
27
TIRUPATI SPL PROJECTS
Sri Potti Sriramulu Nellore
MSME Park, Bodduvaripalem
203,204,205
65159
Kumar Electricals
20-NOV-2023
24-NOV-2023
-
-
1,365,792.00
682,896.00
682,896.00
170,724.00
0.00
-
170,724.00
Land Cost Paid
-
SC
1041
NA
19-NOV-2025
-
-
-
Provisional allotment issued on 24.11.2023. 25% land cost paid, final allotment is under process.
155
28
TIRUPATI SPL PROJECTS
Tirupati
AN West Gudur
128
65313
DEVA AUTO OLD SPARE PARTS
22-DEC-2023
04-JAN-2024
-
-
346,184.00
173,092.00
173,092.00
43,273.00
0.00
-
43,273.00
Provisional Allotment
-
SC
218
NA
26-DEC-2025
-
-
-
Provisional allotment issued on 04.01.2024
114
29
TIRUPATI SPL PROJECTS
Tirupati
AN West Gudur
147
65312
DEVISRI AUTO GARAGE
22-DEC-2023
04-JAN-2024
-
-
349,360.00
174,680.00
174,680.00
43,670.00
0.00
-
43,670.00
Provisional Allotment
-
SC
220
NA
26-DEC-2025
-
-
-
Provisional allotment issued on 04.01.2024
114
30
TIRUPATI SPL PROJECTS
Tirupati
AN West Gudur
140
65335
Sri Venkateswara Tyre Puncher Work & Painting Work
22-DEC-2023
04-JAN-2024
-
-
349,360.00
174,680.00
174,680.00
43,670.00
0.00
-
43,670.00
Provisional Allotment
-
SC
220
NA
26-DEC-2025
-
-
-
Provisional allotment issued on 04.01.2024
114
31
TIRUPATI SPL PROJECTS
Tirupati
AN West Gudur
78
65349
NARAYANA ENGINEERING WORKS
22-DEC-2023
04-JAN-2024
-
-
441,464.00
220,732.00
220,732.00
55,183.00
0.00
-
55,183.00
Provisional Allotment
-
SC
278
NA
26-DEC-2025
-
-
-
Provisional allotment issued on 04.01.2024
114
32
TIRUPATI SPL PROJECTS
Tirupati
AN West Gudur
65
65351
Nagendra Engineering Works
22-DEC-2023
04-JAN-2024
-
-
444,640.00
222,320.00
222,320.00
55,580.00
0.00
-
55,580.00
Provisional Allotment
-
SC
280
NA
26-DEC-2025
-
-
-
Provisional allotment issued on 04.01.2024
114
33
TIRUPATI SPL PROJECTS
Tirupati
AN West Gudur
182
65308
VIJAYA ARTS PAINTING WORKS
22-DEC-2023
19-JAN-2024
-
-
684,428.00
342,214.00
342,214.00
85,554.00
0.00
-
85,554.00
Provisional Allotment
-
SC
431
NA
26-DEC-2025
-
-
-
Provisional allotment issued on 04.01.2024
99
34
TIRUPATI SPL PROJECTS
Tirupati
AN West Gudur
107
65309
PRANAY AUTO STEELS OLD IRON WORKS
22-DEC-2023
19-JAN-2024
-
-
1,980,236.00
990,118.00
990,118.00
247,530.00
0.00
-
247,530.00
Provisional Allotment
-
SC
1247
NA
26-DEC-2025
-
-
-
Provisional allotment issued on 04.01.2024
99
35
TIRUPATI SPL PROJECTS
Tirupati
IP ATTIVARAM
Pl.No.7B
65103
GV THERAPEUTICS
20-NOV-2023
23-NOV-2023
-
-
20,852,864.00
2,000,000.00
18,852,864.00
4,713,216.00
0.00
-
4,713,216.00
Provisional Allotment
-
SC
12928
NA
19-NOV-2025
-
-
-
Allotment issued on 23.11.2023
156
36
TIRUPATI SPL PROJECTS
Tirupati
IP ATTIVARAM
Pl.No.34
65269
PNM LIFESCIENCE PRIVATE LIMITED
22-DEC-2023
27-JAN-2024
-
-
17,959,450.00
2,000,000.00
15,959,450.00
3,989,863.00
400,000.00
04-APR-2024
3,589,863.00
Provisional Allotment
-
SC
10118
R3
26-DEC-2025
-
-
-
Provisional allotment issued on 27.01.2024
91
37
VIJAYAWADA
Krishna
IP_VEERAPANENIGUDEM-PH-1
B23
65187
KUSHAL ENGINEERING
20-NOV-2023
24-NOV-2023
-
-
4,351,558.00
2,175,779.00
2,175,779.00
543,945.00
0.00
-
543,945.00
Provisional Allotment
-
SC
1954
R3
19-NOV-2025
-
-
-
Provisional Allotment
155
38
VIJAYAWADA
Krishna
IP_VEERAPANENIGUDEM-PH-1
B65,B66
65354
M/s. SRI CHANDRASEKHARA INDUSTRIES
22-DEC-2023
23-DEC-2023
-
-
3,567,654.00
0.00
3,567,654.00
891,914.00
0.00
-
891,914.00
Provisional Allotment
-
SC
1602
NA
26-DEC-2025
-
-
-
Provisional Allotment
126
39
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
Plot No-31/43,Plot No-31/60
64945
M/s. SR PAPER INDUSTRIES
20-NOV-2023
23-NOV-2023
-
-
3,313,934.00
0.00
3,313,934.00
828,484.00
0.00
-
828,484.00
Provisional Allotment
-
SC
1432
R3
19-NOV-2025
-
-
-
Provisional Allotment
156
40
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
Plot No-31/115
65087
M/s. Sarah Food industries
20-NOV-2023
25-NOV-2023
-
-
3,863,612.00
0.00
3,863,612.00
965,903.00
0.00
-
965,903.00
Provisional Allotment
-
SC
1753
NA
19-NOV-2025
-
-
-
Provisional Allotment
154
41
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
Plot No-31/116
65088
M/s. Leena Enterprises
20-NOV-2023
23-NOV-2023
-
-
3,863,612.00
0.00
3,863,612.00
965,903.00
0.00
-
965,903.00
Provisional Allotment
-
SC
1753
R3
19-NOV-2025
-
-
-
Provisional Allotment
156
42
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
Plot No-31/83,Plot No-31/84
65171
M/s. Havil Industries
20-NOV-2023
23-NOV-2023
-
-
3,279,949.00
1,639,975.00
1,639,974.00
409,994.00
0.00
-
409,994.00
Provisional Allotment
-
SC
1459
NA
19-NOV-2025
-
-
-
Provisional Allotment
156
43
VIJAYAWADA
Krishna
Model Indl. Park, Mallavalli
Plot No-31/29,Plot No-31/30
65348
M/s. Syam Enterprises
22-DEC-2023
23-DEC-2023
-
-
2,208,408.00
0.00
2,208,408.00
552,102.00
0.00
-
552,102.00
Provisional Allotment
-
SC
1002
NA
26-DEC-2025
-
-
-
Provisional Allotment
126