S.No  |  DISTRICT  |  ZONE  |  INDUSTRIAL PARK  |  PLOT NO  |  ALLOTMENT NUMBER  |  NAME OF THE INDUSTRY  |  ALLOTMENT DATE  |  PROVISIONAL ALLOTMENT DATE  |  FINAL ALLOTMENT DATE  |  DATE OF PHYSICAL POSSESSION  |  ALLOTMENT VALUE  |  REBATE AMOUNT  |  NET ALLOTMENT VALUE  |  ADVANCE TO BE PAID  |  AMOUNT RECEIVED  |  LAST PAID DATE  |  BALANCE ADVANCE AMOUNT  |  STATUS OF ALLOTMENT  |  CANCELLATION  |  CATEGORY OF ALLOTMENT  |  EXTENT IN SQM  |  IMPLEMENTATION STATUS CODE NEW  |  IMPLEMENTATION DUE DATE  |  DCP DATE  |  EOT PERIOD  |  NOTICE ISSUED DATE  |  IMPL ZM REMARKS  |  ALLOTMENT AGE IN DAYS  |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
ANAKAPALLI |
Anakapalli |
IP_ATCHUTAPURAM_DenotifiedArea |
93 |
65447 |
STS POLYPLAST PRIVATE LIMITED |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
18,903,150.00
|
0.00 |
18,903,150.00 |
18,903,150.00 |
1,890,315.00 |
29-FEB-2024 |
17,012,836.00 |
Provisional Allotment |
- |
NA |
5355 |
NA |
21-FEB-2026 |
- |
- |
- |
Yet to implement |
36 |
2 |
ANAKAPALLI |
Anakapalli |
IP_ATCHUTAPURAM_DenotifiedArea |
15B4 |
65449 |
SUTARI PHARMA LLP |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
165,002,256.00
|
0.00 |
165,002,256.00 |
165,002,256.00 |
15,714,501.00 |
29-FEB-2024 |
149,287,760.00 |
Provisional Allotment |
- |
NA |
44517 |
NA |
21-FEB-2026 |
- |
- |
- |
Yet to implement |
36 |
3 |
ANAKAPALLI |
Anakapalli |
IP_ATCHUTAPURAM_DenotifiedArea |
27A44 |
65875 |
VEERA WASTE MANAGEMENT SYSTEMS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
42,409,420.00
|
0.00 |
42,409,420.00 |
42,409,420.00 |
4,240,942.00 |
29-FEB-2024 |
38,168,480.00 |
Provisional Allotment |
- |
BC,Others |
12014 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
4 |
ANAKAPALLI |
Anakapalli |
IP_ATCHUTAPURAM_DenotifiedArea |
27A26 |
65897 |
ADITYA BIRLA SPECIALITY CHEMICALS PRIVATE LIMITED |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
39,183,000.00
|
0.00 |
39,183,000.00 |
39,183,000.00 |
3,918,300.00 |
29-FEB-2024 |
35,264,700.00 |
Provisional Allotment |
- |
General,Others |
11100 |
NA |
14-MAR-2026 |
- |
- |
- |
Yet to implement |
14 |
5 |
ANAKAPALLI |
Anakapalli |
IP_ATCHUTAPURAM_DenotifiedArea |
24D |
66089 |
TRIVENI INTERMEDIATES PRIVATE LIMITED |
22-MAR-2024 |
22-MAR-2024 |
- |
- |
71,429,552.00
|
0.00 |
71,429,552.00 |
71,429,552.00 |
7,142,955.00 |
15-MAR-2024 |
64,286,596.00 |
Provisional Allotment |
- |
General |
0 |
R3 |
21-MAR-2026 |
- |
- |
- |
- |
7 |
6 |
CHITTOOR |
Chittoor |
UDL Palamaneru 2.43 |
UDL Block 1 |
65567 |
M/s . SRI VENKATESWARA MOTOR SERVICE |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
49,588,072.00
|
0.00 |
49,588,072.00 |
49,588,072.00 |
4,958,807.00 |
29-FEB-2024 |
44,629,264.00 |
Provisional Allotment |
NA |
NA |
9835 |
R3 |
21-FEB-2026 |
- |
- |
- |
Provisional allotment orders issued on 29.02.2024. Amendment Orders issued 29.02.2024. |
36 |
7 |
CHITTOOR |
Chittoor |
IP GD NELLORE |
Plot No.40 |
65979 |
PURE CHEMICALS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,376,340.00
|
0.00 |
1,376,340.00 |
1,376,340.00 |
137,634.00 |
29-FEB-2024 |
1,238,706.00 |
Provisional Allotment |
NA |
General,Others |
1130 |
NA |
15-MAR-2026 |
- |
- |
- |
Provisional allotment orders issued on 15.03.2024 |
14 |
8 |
GUNTUR |
Bapatla |
AN CHIRALA |
347,348 |
65455 |
M/s. RANI ASSOCIATES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
671,400.00
|
0.00 |
671,400.00 |
671,400.00 |
0.00 |
- |
671,400.00 |
Provisional Allotment |
- |
NA |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
9 |
GUNTUR |
Bapatla |
AN CHIRALA |
49,50 |
65531 |
SANAM ANITHA |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
805,680.00
|
0.00 |
805,680.00 |
805,680.00 |
0.00 |
- |
805,680.00 |
Provisional Allotment |
- |
NA |
360 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
10 |
GUNTUR |
Bapatla |
AN CHIRALA |
435 |
65974 |
BISMILLAH SERVICING WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
392,634.72
|
0.00 |
392,634.72 |
392,635.00 |
0.00 |
- |
392,635.00 |
Provisional Allotment |
- |
General,Others |
172 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
11 |
GUNTUR |
Bapatla |
AN CHIRALA |
434 |
65975 |
SURYA MOTOR WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
554,710.69
|
0.00 |
554,710.69 |
554,711.00 |
0.00 |
- |
554,711.00 |
Provisional Allotment |
- |
General,Others |
243 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
12 |
GUNTUR |
Bapatla |
AN CHIRALA |
12 |
66003 |
Maturi Siva Kumari |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
741,897.00
|
0.00 |
741,897.00 |
741,897.00 |
0.00 |
- |
741,897.00 |
Provisional Allotment |
- |
General,Others |
195 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
13 |
GUNTUR |
Bapatla |
AN CHIRALA |
53,54 |
66006 |
Karukutla Ruben |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
805,680.00
|
0.00 |
805,680.00 |
805,680.00 |
0.00 |
- |
805,680.00 |
Provisional Allotment |
- |
SC,Others |
360 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
14 |
GUNTUR |
Bapatla |
AN CHIRALA |
89 |
66004 |
Kuppam Santhi Sri |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
951,150.00
|
0.00 |
951,150.00 |
951,150.00 |
0.00 |
- |
951,150.00 |
Provisional Allotment |
- |
General,Others |
250 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
15 |
GUNTUR |
Bapatla |
AN CHIRALA |
2,25,26,27,3,4 |
66005 |
Maturi Rama Mohana Rao |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
4,322,025.50
|
0.00 |
4,322,025.50 |
4,322,026.00 |
0.00 |
- |
4,322,026.00 |
Provisional Allotment |
- |
General,Others |
1136 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
16 |
GUNTUR |
Bapatla |
AN CHIRALA |
123,124 |
65934 |
Mikkili Ajay Kumar |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
704,970.00
|
0.00 |
704,970.00 |
704,970.00 |
0.00 |
- |
704,970.00 |
Provisional Allotment |
- |
SC,Others |
315 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
17 |
GUNTUR |
Bapatla |
AN CHIRALA |
39 |
65936 |
Prabhu Garage |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
485,646.00
|
0.00 |
485,646.00 |
485,646.00 |
0.00 |
- |
485,646.00 |
Provisional Allotment |
- |
SC,Others |
217 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
18 |
GUNTUR |
Bapatla |
AN CHIRALA |
126,127 |
65937 |
Manchala Rathnkar Babu |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
693,780.00
|
0.00 |
693,780.00 |
693,780.00 |
0.00 |
- |
693,780.00 |
Provisional Allotment |
- |
SC,Others |
310 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
19 |
GUNTUR |
Guntur |
AN_GUNTUR_PHASE_IV |
P NO_368 B NO_22M |
65964 |
Friends Auto Repairs |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
339,880.00
|
0.00 |
339,880.00 |
339,880.00 |
0.00 |
- |
339,880.00 |
Provisional Allotment |
- |
SC,Others |
29 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
20 |
GUNTUR |
Palnadu |
MSME-PIDUGURALLA |
21 |
65506 |
SHAIK RIZWANA WATER SERVICING CENTER |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
245,511.00
|
0.00 |
245,511.00 |
245,511.00 |
98,205.00 |
23-MAR-2024 |
147,306.00 |
Provisional Allotment |
- |
NA |
81 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
21 |
GUNTUR |
Palnadu |
MSME-RAYAVARAM |
82,83,91,92 |
65971 |
BHAVYA POLYMERS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
466,800.00
|
0.00 |
466,800.00 |
466,800.00 |
46,680.00 |
29-FEB-2024 |
420,120.00 |
Provisional Allotment |
- |
BC,Others |
1200 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
22 |
GUNTUR |
Palnadu |
MSME-RAYAVARAM |
69,71 |
65894 |
Vijaya Lakshmi Industries |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
540,710.00
|
0.00 |
540,710.00 |
540,710.00 |
54,071.00 |
29-FEB-2024 |
486,639.00 |
Provisional Allotment |
- |
General,Others |
1390 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
23 |
GUNTUR |
Palnadu |
MSME-RAYAVARAM |
72 |
65930 |
LAKSHMI POLYMERS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
596,337.00
|
0.00 |
596,337.00 |
596,337.00 |
59,634.00 |
29-FEB-2024 |
536,703.00 |
Provisional Allotment |
- |
BC,Others |
1533 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
24 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_423,AN_424 |
65460 |
M/s MADHU AUTOZONE |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
387,600.00
|
0.00 |
387,600.00 |
387,600.00 |
0.00 |
- |
387,600.00 |
Provisional Allotment |
- |
NA |
200 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
25 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_49 |
65462 |
MOHAMMED AUTO MOBILES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
0.00 |
- |
581,400.00 |
Provisional Allotment |
- |
NA |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
26 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_131,AN_132,AN_133 |
65461 |
NAVEENA AGENCIES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
2,246,142.00
|
0.00 |
2,246,142.00 |
2,246,142.00 |
17,142.00 |
27-MAR-2024 |
2,229,000.00 |
Provisional Allotment |
- |
NA |
1159 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
27 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_224 |
65466 |
ZUBAIR CAR WATER SERVICE |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
1,124,040.00
|
0.00 |
1,124,040.00 |
1,124,040.00 |
0.00 |
- |
1,124,040.00 |
Provisional Allotment |
- |
NA |
580 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
28 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_139 |
65467 |
M/s YADAV AUTOMOBILES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
0.00 |
- |
581,400.00 |
Provisional Allotment |
- |
NA |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
29 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_69 |
65469 |
SANA TINKERING WORK SHOP |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
0.00 |
- |
581,400.00 |
Provisional Allotment |
- |
NA |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
30 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_98,AN_99 |
65472 |
ANU MOTORS REPAIRINGS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
0.00 |
- |
1,162,800.00 |
Provisional Allotment |
- |
NA |
600 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
31 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_57 |
65488 |
GOUSE CAR MECHANIC |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
0.00 |
- |
581,400.00 |
Provisional Allotment |
- |
NA |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
32 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_141 |
65490 |
SRI VENKATESWARA RE-BORE WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
0.00 |
- |
581,400.00 |
Provisional Allotment |
- |
NA |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
33 |
KADAPA |
Annamayya |
MSME, PILER |
38,39 |
65491 |
M/s SLV TAILORING AND READYMADE GARMENTS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
501,778.81
|
0.00 |
501,778.81 |
501,779.00 |
1,779.00 |
22-MAR-2024 |
500,000.00 |
Provisional Allotment |
- |
NA |
540 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
34 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_434,AN_435,AN_470,AN_471 |
65495 |
SULTHAN AUTO GARAGE |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
790,704.00
|
0.00 |
790,704.00 |
790,704.00 |
0.00 |
- |
790,704.00 |
Provisional Allotment |
- |
NA |
400 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
35 |
KADAPA |
Annamayya |
MSME, PILER |
77 |
65496 |
NSD RAJU PAPER PLATES MANUFACTURING UNIT |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
557,532.00
|
0.00 |
557,532.00 |
557,532.00 |
0.00 |
- |
557,532.00 |
Provisional Allotment |
- |
NA |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
36 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_266 |
65502 |
M/s SREENIVASA TINKERING WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
843,030.00
|
0.00 |
843,030.00 |
843,030.00 |
0.00 |
- |
843,030.00 |
Provisional Allotment |
- |
NA |
435 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
37 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_100,AN_101 |
65515 |
M/s ARFA ENTERPRISES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
0.00 |
- |
1,162,800.00 |
Provisional Allotment |
- |
NA |
600 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
38 |
KADAPA |
Annamayya |
MSME, PILER |
36,37 |
65520 |
M/s PREMCHAND GROUNDNUT OIL INDUSTRY |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
557,532.00
|
278,766.00 |
278,766.00 |
278,766.00 |
0.00 |
- |
278,766.00 |
Provisional Allotment |
- |
NA |
600 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
39 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_24 |
65525 |
UNIVERSAL DIESEL WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
565,353.38
|
0.00 |
565,353.38 |
565,353.00 |
0.00 |
- |
565,353.00 |
Provisional Allotment |
- |
NA |
287 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
40 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_381 |
65529 |
M/s SHAHEENA AUTO ZONE |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
0.00 |
- |
193,800.00 |
Provisional Allotment |
- |
NA |
100 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
41 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_54 |
65528 |
SAI DURGA ENGINEERING WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
0.00 |
- |
581,400.00 |
Provisional Allotment |
- |
NA |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
42 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_282,AN_283 |
65533 |
M/s MADURI SERVICE CENTER |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
0.00 |
- |
1,162,800.00 |
Provisional Allotment |
- |
- |
600 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
43 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_298,AN_299 |
65534 |
M/s SRI VENKATESWARA AUTO DIESEL WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
0.00 |
- |
1,162,800.00 |
Provisional Allotment |
- |
- |
600 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
44 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_195 |
65536 |
SRI LAKSHMI VENKATESWARA AUTO DENTING WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
0.00 |
- |
581,400.00 |
Provisional Allotment |
- |
- |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
45 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_309 |
65539 |
M/s MOKHITHA AUTO SERVICE MOTORS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
0.00 |
- |
581,400.00 |
Provisional Allotment |
- |
- |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
46 |
KADAPA |
Annamayya |
MSME, PILER |
66 |
65543 |
M/s. Gouse Water Servicesing Centre |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
278,766.00
|
0.00 |
278,766.00 |
278,766.00 |
0.00 |
- |
278,766.00 |
Provisional Allotment |
- |
- |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
47 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_492,AN_517 |
65566 |
M/s SONU AUTO GARRIAGE |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
366,282.00
|
0.00 |
366,282.00 |
366,282.00 |
1,000.00 |
28-MAR-2024 |
365,282.00 |
Provisional Allotment |
- |
NA |
180 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
48 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_491 |
65570 |
MADINA TYRE WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
177,908.41
|
0.00 |
177,908.41 |
177,908.00 |
0.00 |
- |
177,908.00 |
Provisional Allotment |
- |
NA |
90 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
49 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_431 |
65572 |
M/s A K ENTERPRISES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
0.00 |
- |
193,800.00 |
Provisional Allotment |
- |
- |
100 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
50 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_72 |
65579 |
C M CAR MECHANIC |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
General |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
51 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_73 |
65580 |
AMEER CAR MECHANIC |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
General |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
52 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_74 |
65581 |
VGR AUTO MOBILE SERVICES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
BC |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
53 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_145 |
65584 |
SIVA SHANKAR ENTERPRISES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
581,400.00
|
290,700.00 |
290,700.00 |
290,700.00 |
0.00 |
- |
290,700.00 |
Provisional Allotment |
- |
SC |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
54 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_438,AN_467 |
66007 |
KIRAN AUTO ZONE |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
387,600.00
|
0.00 |
387,600.00 |
387,600.00 |
0.00 |
- |
387,600.00 |
Provisional Allotment |
- |
BC,Others |
200 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
55 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_438,AN_439,AN_466,AN_467 |
65856 |
S K V ARC WELDING SHOP |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
773,262.00
|
0.00 |
773,262.00 |
773,262.00 |
73,644.00 |
29-FEB-2024 |
699,618.00 |
Provisional Allotment |
- |
BC,Others |
380 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
56 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_440,AN_441,AN_464,AN_465 |
65857 |
SHAIK HASAN BASHA ENGINEERING WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
773,262.00
|
0.00 |
773,262.00 |
773,262.00 |
73,644.00 |
29-FEB-2024 |
699,618.00 |
Provisional Allotment |
- |
Minority,Others |
380 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
57 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_121 |
65859 |
NOOR AUTO LINING WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
General,Others |
300 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
58 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_122,AN_123 |
65858 |
VENKATESH AUTO MOBILES SERVICE |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
116,280.00 |
29-FEB-2024 |
1,046,520.00 |
Provisional Allotment |
- |
General,Others |
600 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
59 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_186,AN_187 |
65864 |
N V R ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,374,042.00
|
687,021.00 |
687,021.00 |
687,021.00 |
0.00 |
- |
687,021.00 |
Provisional Allotment |
- |
SC,Others |
709 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
60 |
KADAPA |
Annamayya |
IP AND AN_PILER |
41,42 |
65865 |
SRI CHOWDESHWARI TEXTILES AND READYMADES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
4,601,897.50
|
0.00 |
4,601,897.50 |
4,601,897.00 |
451,166.00 |
29-FEB-2024 |
4,150,731.00 |
Provisional Allotment |
- |
General,Others |
1550 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
61 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_102 |
65866 |
INTERNATIONAL GARAGE |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
General,Others |
300 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
62 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_145 |
65868 |
M D AUTO GARAGE |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
581,400.00
|
290,700.00 |
290,700.00 |
290,700.00 |
58,140.00 |
29-FEB-2024 |
232,560.00 |
Provisional Allotment |
- |
Minority,Others |
300 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
63 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_93 |
65869 |
J B WATER WASH |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
0.00 |
- |
581,400.00 |
Provisional Allotment |
- |
SC,Others |
300 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
64 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_79 |
65872 |
RAMESH ELECTRICAL WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
BC,Others |
300 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
65 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_127,AN_128 |
65874 |
M N R AUTO MOBILE SERVICES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
116,280.00 |
29-FEB-2024 |
1,046,520.00 |
Provisional Allotment |
- |
General,Others |
600 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
66 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_193 |
65885 |
DSNR CAR WASH AND DECORS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
50,000.00 |
20-MAR-2024 |
1,112,800.00 |
Provisional Allotment |
- |
ST,Others |
300 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
67 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_257 |
65886 |
SREE VENKATESWARA TWO WHEELER AND FOUR WHEELER SER |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
843,030.00
|
0.00 |
843,030.00 |
843,030.00 |
0.00 |
- |
843,030.00 |
Provisional Allotment |
- |
SC,Others |
435 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
68 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_260 |
65888 |
RAMANA AUTO DIESEL WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
843,030.00
|
0.00 |
843,030.00 |
843,030.00 |
0.00 |
- |
843,030.00 |
Provisional Allotment |
- |
SC,Others |
435 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
69 |
KADAPA |
Annamayya |
MSME, PILER |
160,161 |
65890 |
SRI VENKATESHWARA ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
557,532.00
|
278,766.00 |
278,766.00 |
278,766.00 |
54,660.00 |
29-FEB-2024 |
224,106.00 |
Provisional Allotment |
- |
General,Others |
600 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
70 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_157 |
65891 |
SHAKEER DIESEL MECHANIC |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
General,Others |
300 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
71 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_369,AN_370 |
65896 |
N V R ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
0.00 |
- |
1,162,800.00 |
Provisional Allotment |
- |
SC,Others |
600 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
72 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_422 |
65900 |
MASHAALLAH CAR DIESEL MECHANIC |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
19,380.00 |
29-FEB-2024 |
174,420.00 |
Provisional Allotment |
- |
BC,Others |
100 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
73 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_421 |
65901 |
MD AUTO TINKERING |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
19,380.00 |
29-FEB-2024 |
174,420.00 |
Provisional Allotment |
- |
BC,Others |
100 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
74 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_154,AN_165 |
65903 |
SANDRA AUTO GARAGE |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
116,280.00 |
29-FEB-2024 |
1,046,520.00 |
Provisional Allotment |
- |
General,Others |
600 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
75 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_420 |
65906 |
BISMILLAH MOHAMMAD TRACTOR MECHANIC SERVICE |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
19,380.00 |
29-FEB-2024 |
174,420.00 |
Provisional Allotment |
- |
BC,Others |
100 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
76 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_68 |
65907 |
BISMILLAH IRON WORKS AND FRAMES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
Minority,Others |
300 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
77 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_165 |
65908 |
SAFA CAR DECORS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
General,Others |
300 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
78 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_163 |
65909 |
S S S AUTO MECHANIC |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
581,400.00
|
0.00 |
581,400.00 |
581,400.00 |
58,140.00 |
29-FEB-2024 |
523,260.00 |
Provisional Allotment |
- |
Minority,Others |
300 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
79 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_380 |
65910 |
ZAYAN AUTO EXTRA FITTING WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
19,380.00 |
29-FEB-2024 |
174,420.00 |
Provisional Allotment |
- |
General,Others |
100 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
80 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_155,AN_156 |
65911 |
SHAIK MOHAMMED SAMAN ELECTRICAL WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,162,800.00
|
0.00 |
1,162,800.00 |
1,162,800.00 |
116,280.00 |
29-FEB-2024 |
1,046,520.00 |
Provisional Allotment |
- |
Minority,Others |
600 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
81 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_419 |
65915 |
MUBARAK AUTO ZONE |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
19,380.00 |
29-FEB-2024 |
174,420.00 |
Provisional Allotment |
- |
BC,Others |
100 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
82 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_383 |
65919 |
PUSHPA ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
19,380.00 |
29-FEB-2024 |
174,420.00 |
Provisional Allotment |
- |
General,Others |
100 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
83 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_440,AN_465 |
65926 |
SUBBU ARC WELDING GARAGE |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
348,840.00
|
0.00 |
348,840.00 |
348,840.00 |
34,884.00 |
29-FEB-2024 |
313,956.00 |
Provisional Allotment |
- |
BC,Others |
180 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
84 |
KADAPA |
Annamayya |
MSME, PILER |
200,206 |
65929 |
SRI VENKATESWARA SPICES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
546,600.00
|
0.00 |
546,600.00 |
546,600.00 |
54,660.00 |
29-FEB-2024 |
491,940.00 |
Provisional Allotment |
- |
General,Technocrat |
600 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
85 |
KADAPA |
Annamayya |
IP AND AN_PILER |
AN_430 |
65935 |
MASHA ALLAH AUTO MOBILE WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
193,800.00
|
0.00 |
193,800.00 |
193,800.00 |
19,380.00 |
29-FEB-2024 |
174,420.00 |
Provisional Allotment |
- |
BC,Others |
100 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
86 |
KADAPA |
Annamayya |
MSME Park - Tallapaka |
Plot No.81,Plot No.82 |
65871 |
DEVALRAJU INDUSTRIES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
2,378,448.00
|
0.00 |
2,378,448.00 |
2,378,448.00 |
237,845.00 |
29-FEB-2024 |
2,140,603.00 |
Provisional Allotment |
- |
General,Others |
2988 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
87 |
KADAPA |
Annamayya |
MSME Park - Tallapaka |
Plot No.10 |
65943 |
CSR Enterprises |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
845,352.00
|
0.00 |
845,352.00 |
845,352.00 |
84,535.00 |
05-MAR-2024 |
760,817.00 |
Provisional Allotment |
- |
General,Others |
1062 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
88 |
KADAPA |
YSR |
IDP_PULIVENDULA |
UDL-12 |
65608 |
Ashwitha Canteen |
23-FEB-2024 |
23-FEB-2024 |
- |
- |
142,290.00
|
0.00 |
142,290.00 |
142,290.00 |
0.00 |
- |
142,290.00 |
Provisional Allotment |
- |
NA |
181 |
R3 |
22-FEB-2026 |
- |
- |
- |
- |
35 |
89 |
KADAPA |
YSR |
MSE - CDP |
Plot No 31 |
65878 |
RAMU INDUSTRY |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,443,112.00
|
0.00 |
1,443,112.00 |
1,443,112.00 |
144,311.00 |
29-FEB-2024 |
1,298,801.00 |
Provisional Allotment |
- |
General,Others |
1012 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
90 |
KADAPA |
YSR |
MIP_KOPPARTHY- Ph-I |
Plot_160,Plot_161 |
65916 |
ASB ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
10,271,184.00
|
0.00 |
10,271,184.00 |
10,271,184.00 |
1,027,119.00 |
29-FEB-2024 |
9,244,065.00 |
Provisional Allotment |
- |
BC,Others |
16674 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
91 |
KADAPA |
YSR |
MIP_KOPPARTHY- Ph-I |
Plot_132B |
65920 |
TEJA GLASSTECH |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
2,293,984.00
|
0.00 |
2,293,984.00 |
2,293,984.00 |
229,398.00 |
29-FEB-2024 |
2,064,586.00 |
Provisional Allotment |
- |
General,Others |
3724 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
92 |
KADAPA |
YSR |
MIP_KOPPARTHY- Ph-I |
Plot_163 |
65921 |
TEJ PHARMA |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
4,985,904.00
|
0.00 |
4,985,904.00 |
4,985,904.00 |
498,590.00 |
29-FEB-2024 |
4,487,314.00 |
Provisional Allotment |
- |
General,Others |
8094 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
93 |
KADAPA |
YSR |
YSR EMC - KOPPARTHY |
Plot No.26,Plot No.27,Plot No.33,Plot No.34 |
65977 |
Channelplay Limited |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
12,128,886.00
|
0.00 |
12,128,886.00 |
12,128,886.00 |
0.00 |
- |
12,128,886.00 |
Provisional Allotment |
- |
general |
40842 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
94 |
KADAPA |
YSR |
YSR EMC - KOPPARTHY |
Plot No.10,Plot No.11,Plot No.12,Plot No.13,Plot No.14,Plot No.15 |
66090 |
Teknodome India Private Limited |
22-MAR-2024 |
22-MAR-2024 |
- |
- |
4,857,435.00
|
0.00 |
4,857,435.00 |
4,857,435.00 |
485,744.00 |
19-MAR-2024 |
4,371,691.00 |
Provisional Allotment |
- |
General |
16355 |
R3 |
21-MAR-2026 |
- |
- |
- |
- |
7 |
95 |
KADAPA |
YSR |
YSR JAGANANNA MEGA INDUST. HUB |
Plot No.223 |
65482 |
VENNELA INDUSTRIES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
5,859,000.00
|
0.00 |
5,859,000.00 |
5,859,000.00 |
0.00 |
- |
5,859,000.00 |
Provisional Allotment |
- |
NA |
9450 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
96 |
KADAPA |
YSR |
YSR JAGANANNA MEGA INDUST. HUB |
Plot No.27 |
65609 |
Adeep Life Sciences Private Limited |
23-FEB-2024 |
23-FEB-2024 |
- |
- |
64,028,640.00
|
0.00 |
64,028,640.00 |
64,028,640.00 |
0.00 |
- |
64,028,640.00 |
Provisional Allotment |
- |
NA |
103272 |
R3 |
22-FEB-2026 |
- |
- |
- |
- |
35 |
97 |
KADAPA |
YSR |
YSR JAGANANNA MEGA INDUST. HUB |
Common Amentity -2B |
65957 |
SANCTUARY HOTEL AND RESORTS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
9,653,586.00
|
0.00 |
9,653,586.00 |
9,653,586.00 |
567,858.00 |
29-FEB-2024 |
9,085,728.00 |
Provisional Allotment |
- |
general |
9160 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
98 |
KADAPA |
YSR |
YSR JAGANANNA MEGA INDUST. HUB |
Common Amentity - 2C |
65958 |
SANCTUARY HOTEL AND RESORTS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
20,935,602.00
|
0.00 |
20,935,602.00 |
20,935,602.00 |
1,231,506.00 |
29-FEB-2024 |
19,704,096.00 |
Provisional Allotment |
- |
general |
19864 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
99 |
KADAPA |
YSR |
YSR JAGANANNA MEGA INDUST. HUB |
Plot No.208,Plot No.209,Plot No.210,Plot No.217,Plot No.218,Plot No.219 |
65983 |
Varun Motors Pvt Ltd |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
24,862,000.00
|
0.00 |
24,862,000.00 |
24,862,000.00 |
0.00 |
- |
24,862,000.00 |
Provisional Allotment |
- |
General,Others |
40100 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
100 |
KAKINADA |
Kakinada |
MSME-PEDDAPURAM |
20B |
65984 |
Sri Veerabhadra Motors |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
414,630.00
|
0.00 |
414,630.00 |
414,630.00 |
0.00 |
- |
414,630.00 |
Provisional Allotment |
- |
General,Others |
150 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
101 |
KURNOOL |
Nandyal |
UDL-SANJAMALA-II (Waqf Land) |
UDL-1 |
65367 |
THE RAMCO CEMENTS LIMITED |
11-JAN-2024 |
11-JAN-2024 |
- |
- |
2,718,054.00
|
0.00 |
2,718,054.00 |
2,718,054.00 |
0.00 |
- |
2,718,054.00 |
Provisional Allotment |
- |
- |
11049 |
R3 |
10-JAN-2026 |
- |
- |
- |
- |
78 |
102 |
PRAKASAM |
Prakasam |
APIIC_ONGOLE_GC |
497 |
60689 |
DHANALAKSHMI INDUSTRIES |
30-JAN-2024 |
30-JAN-2024 |
- |
- |
4,419,450.00
|
2,000,000.00 |
2,419,450.00 |
2,419,450.00 |
0.00 |
- |
2,419,450.00 |
Provisional Allotment |
NA |
SC/ST |
2806 |
NA |
31-MAR-2025 |
- |
- |
- |
Re allotment order given on 30.01.2024 |
59 |
103 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
103 |
65551 |
AKSHAYA SWARNA CATTLE FEED |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
444,900.00
|
0.00 |
444,900.00 |
444,900.00 |
44,490.00 |
29-FEB-2024 |
400,410.00 |
Provisional Allotment |
- |
NA |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
104 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
2,3 |
65887 |
SAANVI ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
889,800.00
|
0.00 |
889,800.00 |
889,800.00 |
88,980.00 |
29-FEB-2024 |
800,820.00 |
Provisional Allotment |
- |
General,Technocrat |
600 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
105 |
PUTTAPARTHY |
Anantapur |
MSME-RAPTHADU |
Plot-8 |
65913 |
SRH INDUSTRIES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
453,798.00
|
0.00 |
453,798.00 |
453,798.00 |
44,490.00 |
29-FEB-2024 |
409,308.00 |
Provisional Allotment |
- |
General,Others |
300 |
NA |
- |
- |
- |
- |
Provisional Allotment orders issued on 16.03.2024 |
14 |
106 |
PUTTAPARTHY |
Sri Sathya Sai |
Gudipalli-UDL |
UDL-6 |
65933 |
PIONEER POLYLEATHERS PRIVATE LIMITED |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
180,786,016.00
|
0.00 |
180,786,016.00 |
180,786,016.00 |
18,078,602.00 |
29-FEB-2024 |
162,707,424.00 |
Provisional Allotment |
- |
General,Technocrat |
200206 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
107 |
PUTTAPARTHY |
Sri Sathya Sai |
IP GUDIPALLI |
Plto-12(Commercial) |
65959 |
VK HVAC SYSTEMS SERVICES PRIVATE LIMITED |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
16,979,550.00
|
0.00 |
16,979,550.00 |
16,979,550.00 |
1,617,100.00 |
29-FEB-2024 |
15,362,450.00 |
Provisional Allotment |
- |
bcOther |
7851 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
108 |
PUTTAPARTHY |
Sri Sathya Sai |
IP GUDIPALLI |
Plot-13,Plot-18 |
65883 |
PUNGJINSOLUTIONINDIAPRIVATELIMITED |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
34,014,224.00
|
0.00 |
34,014,224.00 |
34,014,224.00 |
3,334,728.00 |
29-FEB-2024 |
30,679,498.00 |
Provisional Allotment |
- |
General,Others |
16188 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
109 |
PUTTAPARTHY |
Sri Sathya Sai |
IP-R.Anantapur |
Plot 10,Plot 11,Plot 7,Plot 8,Plot 9 |
65884 |
rRGEOCYCLE(iNDIA)PRIVATELIMITED |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
2,463,692.00
|
0.00 |
2,463,692.00 |
2,463,692.00 |
246,370.00 |
29-FEB-2024 |
2,217,322.00 |
Provisional Allotment |
- |
General,Others |
11788 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
110 |
PUTTAPARTHY |
Sri Sathya Sai |
Kappalabanda-MSME |
Plot-159 |
65452 |
KARTHIKEYA PET BOTTLES |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
521,400.00
|
0.00 |
521,400.00 |
521,400.00 |
452,140.00 |
27-MAR-2024 |
69,260.00 |
Provisional Allotment |
- |
NA |
300 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
111 |
PUTTAPARTHY |
Sri Sathya Sai |
MSME_KOTIPI |
13 |
65918 |
mahanandiPolymers |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
628,609.69
|
0.00 |
628,609.69 |
628,610.00 |
61,628.00 |
29-FEB-2024 |
566,982.00 |
Provisional Allotment |
- |
General,Others |
477 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
112 |
TIRUPATI |
Tirupati |
CC_TIRUPATHI |
UNDIVIDED SHARE-1 |
65516 |
P SRINADHA REDDY |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
7,158,413.50
|
0.00 |
7,158,413.50 |
7,158,413.00 |
0.00 |
- |
7,158,413.00 |
Provisional Allotment |
- |
NA |
102 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
113 |
TIRUPATI |
Tirupati |
CC_TIRUPATHI |
UNDIVIDED SHARE-2 |
65517 |
VANKADARA NARASIMHA RAO |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
7,158,413.50
|
0.00 |
7,158,413.50 |
7,158,413.00 |
0.00 |
- |
7,158,413.00 |
Provisional Allotment |
- |
NA |
102 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
114 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - I |
CFC |
66029 |
SRI VIJAYESHWARA PRIVATE LIMITED |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
125,746,544.00
|
0.00 |
125,746,544.00 |
125,746,544.00 |
0.00 |
- |
125,746,544.00 |
Provisional Allotment |
- |
general |
24282 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
115 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
CFC 1D |
65560 |
SV EV Station and Restaurant |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
13,952,385.00
|
0.00 |
13,952,385.00 |
13,952,385.00 |
0.00 |
- |
13,952,385.00 |
Provisional Allotment |
- |
NA |
5140 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
116 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
CFC 1B |
65955 |
M/s VIMANA VENKATESWARA COMPLEX |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
23,719,054.00
|
0.00 |
23,719,054.00 |
23,719,056.00 |
0.00 |
- |
23,719,056.00 |
Provisional Allotment |
- |
general |
4064 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
117 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
CFC 4B/5,CFC 4B/6 |
66026 |
M/s.CHAGANAM GOWRISANKAR |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
25,658,560.00
|
0.00 |
25,658,560.00 |
25,658,560.00 |
0.00 |
- |
25,658,560.00 |
Provisional Allotment |
- |
general |
14176 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
118 |
TIRUPATI |
Tirupati |
ELECTRONIC MFG CLUSTER - II |
87 and 88 |
65931 |
Longwell Technology India Private Limited |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
60,895,060.00
|
0.00 |
60,895,060.00 |
60,895,060.00 |
5,970,104.00 |
29-FEB-2024 |
54,924,956.00 |
Provisional Allotment |
- |
BC,Others |
32984 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
119 |
TIRUPATI |
Tirupati |
IP,Thatiparthy (UDL) |
UDL 4A,UDL 4B |
65945 |
EEYA METAL & ALLOYS PRIVATE LIMITED |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
10,641,288.00
|
0.00 |
10,641,288.00 |
10,641,288.00 |
4,300,000.00 |
20-MAR-2024 |
6,341,288.00 |
Provisional Allotment |
- |
general |
16296 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
120 |
TIRUPATI SPL PROJECTS |
Sri Potti Sriramulu Nellore |
MSME Park Kothapalli KoruGunta |
99 |
65316 |
Sri Srinivasa Diesel & Hydraulic Mechanic |
22-DEC-2023 |
02-JAN-2024 |
- |
- |
438,600.00
|
219,300.00 |
219,300.00 |
219,300.00 |
184,212.00 |
29-FEB-2024 |
35,088.00 |
Provisional Allotment |
- |
BC,Women |
300 |
NA |
26-DEC-2025 |
- |
- |
- |
Provisional allotment issued on 02.01.2024 |
87 |
121 |
TIRUPATI SPL PROJECTS |
Sri Potti Sriramulu Nellore |
MSME Park Kothapalli KoruGunta |
34 |
65327 |
Sri Srinivasa Auto Garrage |
22-DEC-2023 |
02-JAN-2024 |
- |
- |
438,600.00
|
0.00 |
438,600.00 |
438,600.00 |
186,772.00 |
29-FEB-2024 |
251,828.00 |
Provisional Allotment |
- |
BC,Women |
300 |
NA |
26-DEC-2025 |
- |
- |
- |
Provisional allotment issued on 02.01.2024 |
87 |
122 |
TIRUPATI SPL PROJECTS |
Sri Potti Sriramulu Nellore |
MSME Park Kothapalli KoruGunta |
11,40 |
65587 |
REFRIGERATION ALLIED WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
982,464.00
|
0.00 |
982,464.00 |
982,464.00 |
0.00 |
- |
982,464.00 |
Provisional Allotment |
- |
BC |
640 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
123 |
TIRUPATI SPL PROJECTS |
Sri Potti Sriramulu Nellore |
MSME Park Kothapalli KoruGunta |
82,83 |
65976 |
PRL Aluminium Bowl Manufacturers |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
877,200.00
|
0.00 |
877,200.00 |
877,200.00 |
0.00 |
- |
877,200.00 |
Provisional Allotment |
- |
ST,Others |
600 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
124 |
TIRUPATI SPL PROJECTS |
Sri Potti Sriramulu Nellore |
Kothapalli Koru Gunta UDL |
UDL Blcok-5C-A |
65962 |
Siva Rama Krishna Industries |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
2,289,152.00
|
0.00 |
2,289,152.00 |
2,289,152.00 |
0.00 |
- |
2,289,152.00 |
Provisional Allotment |
- |
genOther |
1619 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
125 |
TIRUPATI SPL PROJECTS |
Sri Potti Sriramulu Nellore |
Kothapalli Koru Gunta UDL |
UDL Blcok-5C |
65893 |
SHS Garments and Tailoring Works |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
2,335,490.00
|
0.00 |
2,335,490.00 |
2,335,490.00 |
0.00 |
- |
2,335,490.00 |
Provisional Allotment |
- |
SC,Others |
2591 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
126 |
TIRUPATI SPL PROJECTS |
Tirupati |
AN West Gudur |
223 |
65307 |
SRI PENUSILA LAKSHMI NARASIMHA ENGINEERING WORKS |
22-DEC-2023 |
04-JAN-2024 |
- |
- |
462,108.00
|
0.00 |
462,108.00 |
462,108.00 |
0.00 |
- |
462,108.00 |
Provisional Allotment |
- |
Women |
291 |
NA |
26-DEC-2025 |
- |
- |
- |
Provisional allotment issued on 04.01.2024 |
85 |
127 |
TIRUPATI SPL PROJECTS |
Tirupati |
AN West Gudur |
55,56 |
65612 |
SRI SANKAR REDDY ENGINEERING WORKS |
23-FEB-2024 |
23-FEB-2024 |
- |
- |
886,104.00
|
0.00 |
886,104.00 |
886,104.00 |
0.00 |
- |
886,104.00 |
Provisional Allotment |
- |
- |
558 |
R3 |
22-FEB-2026 |
- |
- |
- |
- |
35 |
128 |
TIRUPATI SPL PROJECTS |
Tirupati |
AN West Gudur |
188 |
65877 |
OM Sai Oxygen Gas Agency |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
665,372.00
|
0.00 |
665,372.00 |
665,372.00 |
66,537.00 |
29-FEB-2024 |
598,835.00 |
Provisional Allotment |
- |
General,Others |
419 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
129 |
TIRUPATI SPL PROJECTS |
Tirupati |
AN West Gudur |
120 |
65938 |
CHARUNYA LAHARI LAKSHMI CAR MECHANICAL WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
349,360.00
|
0.00 |
349,360.00 |
349,360.00 |
34,936.00 |
29-FEB-2024 |
314,424.00 |
Provisional Allotment |
- |
General,Others |
220 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
130 |
TIRUPATI SPL PROJECTS |
Tirupati |
IP_MAMBATTU PHASE-II |
2 |
66030 |
STALLION INDIA FLUOROCHEMICALS LIMITED |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
29,088,696.00
|
0.00 |
29,088,696.00 |
29,088,696.00 |
0.00 |
- |
29,088,696.00 |
Provisional Allotment |
- |
General,Others |
19628 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
131 |
TIRUPATI SPL PROJECTS |
Tirupati |
IP NAIDUPET |
Pl.No.47 (Block-C),Pl.No.48 (Block-C) |
66031 |
Hella Infra Market Private Limited |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
62,708,276.00
|
2,000,000.00 |
60,708,276.00 |
60,708,276.00 |
0.00 |
- |
60,708,276.00 |
Provisional Allotment |
- |
General,Others |
33805 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
132 |
TIRUPATI SPL PROJECTS |
Tirupati |
IP NAIDUPET |
Pl.No.10 (Block-A),Pl.No.8 (Block-A),Pl.No.9 (Block-A) |
66091 |
Nayara Energy Limited |
22-MAR-2024 |
22-MAR-2024 |
- |
- |
380,672,384.00
|
0.00 |
380,672,384.00 |
380,672,384.00 |
48,950,484.00 |
05-MAR-2024 |
331,721,920.00 |
Provisional Allotment |
- |
General |
0 |
R3 |
21-MAR-2026 |
- |
- |
- |
- |
7 |
133 |
TIRUPATI SPL PROJECTS |
Tirupati |
SEZ NAIDUPETA |
33,38-A |
65478 |
Eminence BioFuel Private Limited |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
173,740,192.00
|
0.00 |
173,740,192.00 |
173,740,192.00 |
0.00 |
- |
173,740,192.00 |
Provisional Allotment |
- |
NA |
91825 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
134 |
TIRUPATI SPL PROJECTS |
Tirupati |
SEZ NAIDUPETA |
34-A,37-A |
65914 |
BIRLA CARBON AP PRIVATE LIMITED |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
84,232,504.00
|
0.00 |
84,232,504.00 |
84,232,512.00 |
8,258,090.00 |
29-FEB-2024 |
75,974,416.00 |
Provisional Allotment |
- |
General,Others |
44518 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
135 |
VIJAYAWADA |
Krishna |
IP_VEERAPANENIGUDEM-PH-1 |
B35 |
65522 |
SYNTHETIC ENERGY PRIVATE LIMITED |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
1,817,232.00
|
0.00 |
1,817,232.00 |
1,817,232.00 |
0.00 |
- |
1,817,232.00 |
Provisional Allotment |
- |
NA |
800 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
136 |
VIJAYAWADA |
Krishna |
IP_VEERAPANENIGUDEM-PH-1 |
B29 |
65981 |
GREENLIGHT ENERGY SOLUTIONS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,759,330.00
|
0.00 |
1,759,330.00 |
1,759,330.00 |
0.00 |
- |
1,759,330.00 |
Provisional Allotment |
- |
BC,Others |
790 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
137 |
VIJAYAWADA |
Krishna |
IP_VEERAPANENIGUDEM-PH-1 |
B55 |
65982 |
MATESREE MODULAR |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,786,054.00
|
0.00 |
1,786,054.00 |
1,786,054.00 |
0.00 |
- |
1,786,054.00 |
Provisional Allotment |
- |
General,Others |
802 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
138 |
VIJAYAWADA |
Krishna |
IP_VEERAPANENIGUDEM-PH-1 |
B25 |
65973 |
INDIRA INDUSTRIES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,814,960.50
|
0.00 |
1,814,960.50 |
1,814,960.00 |
0.00 |
- |
1,814,960.00 |
Provisional Allotment |
- |
SC,Others |
799 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
139 |
VIJAYAWADA |
Krishna |
IP_VEERAPANENIGUDEM-PH-1 |
B2 |
65967 |
JAHNAVI SOLUTIONS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
3,053,217.00
|
0.00 |
3,053,217.00 |
3,053,217.00 |
0.00 |
- |
3,053,217.00 |
Provisional Allotment |
- |
SC,Others |
1371 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
140 |
VIJAYAWADA |
Krishna |
IP_VEERAPANENIGUDEM-PH-1 |
PL.NO.-69 |
66109 |
HB Frozen Foods |
28-MAR-2024 |
28-MAR-2024 |
- |
- |
1,620,414.00
|
0.00 |
1,620,414.00 |
1,620,414.00 |
0.00 |
- |
1,620,414.00 |
Provisional Allotment |
- |
SC_W |
1805 |
R3 |
27-MAR-2026 |
- |
- |
- |
- |
1 |
141 |
VIJAYAWADA |
Krishna |
IP_VEERAPANENIGUDEM-PH-1 |
PL.NO.-75 |
66110 |
Rajyalakshmi Enterprises |
28-MAR-2024 |
28-MAR-2024 |
- |
- |
1,399,725.00
|
0.00 |
1,399,725.00 |
1,399,725.00 |
0.00 |
- |
1,399,725.00 |
Provisional Allotment |
- |
SC |
2161 |
R3 |
27-MAR-2026 |
- |
- |
- |
- |
1 |
142 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
PLOT NO._23/65 |
65463 |
M/s Naveen Enterprises |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
1,106,408.00
|
0.00 |
1,106,408.00 |
1,106,408.00 |
0.00 |
- |
1,106,408.00 |
Provisional Allotment |
- |
NA |
502 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
143 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/22 |
65487 |
M/s. Nitin Polymers |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
3,306,000.00
|
0.00 |
3,306,000.00 |
3,306,000.00 |
0.00 |
- |
3,306,000.00 |
Provisional Allotment |
- |
NA |
1500 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
144 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/106,Plot No-31/107 |
65501 |
M/s. Deepak Packaging Industry |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
2,204,000.00
|
0.00 |
2,204,000.00 |
2,204,000.00 |
0.00 |
- |
2,204,000.00 |
Provisional Allotment |
- |
NA |
1000 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
145 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/105 |
65998 |
M A Industries |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,102,000.00
|
0.00 |
1,102,000.00 |
1,102,000.00 |
110,200.00 |
29-FEB-2024 |
991,800.00 |
Provisional Allotment |
- |
General,Others |
500 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
146 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/104 |
65968 |
VNP PROJECTS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,379,704.00
|
0.00 |
1,379,704.00 |
1,379,704.00 |
0.00 |
- |
1,379,704.00 |
Provisional Allotment |
- |
General,Others |
626 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
147 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/90 |
65995 |
Dharsha Industries |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
2,219,428.00
|
0.00 |
2,219,428.00 |
2,219,428.00 |
0.00 |
- |
2,219,428.00 |
Provisional Allotment |
- |
BC,Others |
1007 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
148 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/102,Plot No-31/103 |
65969 |
SHAN ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
2,481,704.00
|
0.00 |
2,481,704.00 |
2,481,704.00 |
0.00 |
- |
2,481,704.00 |
Provisional Allotment |
- |
SC,Others |
1126 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
149 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No_31/10 |
65989 |
ROHI FOODS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
3,306,000.00
|
0.00 |
3,306,000.00 |
3,306,000.00 |
0.00 |
- |
3,306,000.00 |
Provisional Allotment |
- |
SC,Others |
1500 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
150 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/11 |
65990 |
ARK FOODS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
3,306,000.00
|
0.00 |
3,306,000.00 |
3,306,000.00 |
0.00 |
- |
3,306,000.00 |
Provisional Allotment |
- |
SC,Others |
1500 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
151 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/12 |
65991 |
JC FOODS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
3,306,000.00
|
0.00 |
3,306,000.00 |
3,306,000.00 |
0.00 |
- |
3,306,000.00 |
Provisional Allotment |
- |
SC,Others |
1500 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
152 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/114 |
65993 |
L J technologies |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
3,863,612.00
|
0.00 |
3,863,612.00 |
3,863,612.00 |
0.00 |
- |
3,863,612.00 |
Provisional Allotment |
- |
General,Others |
1753 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
153 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/91,Plot No-31/92 |
65997 |
Maanvik Handi Crafts |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
4,438,856.00
|
0.00 |
4,438,856.00 |
4,438,856.00 |
0.00 |
- |
4,438,856.00 |
Provisional Allotment |
- |
SC,Others |
2014 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
154 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/17,Plot No-31/18 |
65924 |
Sri Lakshmi Ganesh Industries |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
6,612,000.00
|
0.00 |
6,612,000.00 |
6,612,000.00 |
0.00 |
- |
6,612,000.00 |
Provisional Allotment |
- |
ST,Others |
3000 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
155 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No_31/7 |
65928 |
TEJASWI PRE ENGINEERING BUILDING SOLUTION |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
3,306,000.00
|
0.00 |
3,306,000.00 |
3,306,000.00 |
0.00 |
- |
3,306,000.00 |
Provisional Allotment |
- |
SC,Others |
1500 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
156 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No-31/120 |
65941 |
K M R ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
2,204,000.00
|
0.00 |
2,204,000.00 |
2,204,000.00 |
0.00 |
- |
2,204,000.00 |
Provisional Allotment |
- |
SC |
1000 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
157 |
VIJAYAWADA |
Krishna |
Model Indl. Park, Mallavalli |
Plot No_31/6 |
65942 |
RYAN ICE CREEMS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
3,306,000.00
|
0.00 |
3,306,000.00 |
3,306,000.00 |
0.00 |
- |
3,306,000.00 |
Provisional Allotment |
- |
SC |
1500 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
158 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
49 |
65484 |
RAMA LAKSHMANA ELECTRICAL WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
207,315.00
|
0.00 |
207,315.00 |
207,315.00 |
0.00 |
- |
207,315.00 |
Provisional Allotment |
- |
NA |
51 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
159 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
252 |
65493 |
NIKHIL WORKSHOP |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
273,655.81
|
136,828.00 |
136,827.80 |
136,828.00 |
0.00 |
- |
136,828.00 |
Provisional Allotment |
- |
NA |
66 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
160 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
62 |
65504 |
NAGABABU WORKSHOP |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
207,315.00
|
103,658.00 |
103,657.00 |
103,657.00 |
0.00 |
- |
103,657.00 |
Provisional Allotment |
- |
NA |
51 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
161 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
11 |
65507 |
VENKATESWARA TRADERS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
207,315.00
|
0.00 |
207,315.00 |
207,315.00 |
186,583.00 |
27-MAR-2024 |
20,732.00 |
Provisional Allotment |
- |
NA |
51 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
162 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
190 |
65508 |
JAI HANUMAN VEHICLE PAINTS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
207,315.00
|
0.00 |
207,315.00 |
207,315.00 |
0.00 |
- |
207,315.00 |
Provisional Allotment |
- |
NA |
51 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
163 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
213 |
65532 |
VENKATESWARA MECHANICAL WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
207,315.00
|
0.00 |
207,315.00 |
207,315.00 |
0.00 |
- |
207,315.00 |
Provisional Allotment |
- |
- |
51 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
164 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
145 |
65540 |
RAZA ENGINEERING WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
211,461.30
|
0.00 |
211,461.30 |
211,461.00 |
0.00 |
- |
211,461.00 |
Provisional Allotment |
- |
- |
51 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
165 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
130 |
65544 |
LAKSHMI COMMAN KATTALU WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
207,315.00
|
0.00 |
207,315.00 |
207,315.00 |
0.00 |
- |
207,315.00 |
Provisional Allotment |
- |
- |
51 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
166 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
132 |
65550 |
LAKSHMAIAH ELECTRICAL WORKS |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
207,315.00
|
103,658.00 |
103,657.00 |
103,657.00 |
0.00 |
- |
103,657.00 |
Provisional Allotment |
- |
NA |
51 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
167 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
200 |
65575 |
SHAHIDA EV SERVICE |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
207,315.00
|
0.00 |
207,315.00 |
207,315.00 |
0.00 |
- |
207,315.00 |
Provisional Allotment |
- |
- |
51 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
168 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
46 |
65944 |
MASTAN MECHANICAL WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
207,315.00
|
0.00 |
207,315.00 |
207,315.00 |
0.00 |
- |
207,315.00 |
Provisional Allotment |
- |
Minority,Others |
51 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
169 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
47 |
65970 |
RAVI WELDING WORSK |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
207,315.00
|
0.00 |
207,315.00 |
207,315.00 |
0.00 |
- |
207,315.00 |
Provisional Allotment |
- |
BC,Others |
51 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
170 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
93 |
65986 |
SRI VENKATESWARA MECHANICAL WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
207,315.00
|
0.00 |
207,315.00 |
207,315.00 |
186,583.00 |
27-MAR-2024 |
20,732.00 |
Provisional Allotment |
- |
General,Others |
51 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
171 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
25 |
65994 |
BHARAT ENTERPRISES |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
207,315.00
|
0.00 |
207,315.00 |
207,315.00 |
0.00 |
- |
207,315.00 |
Provisional Allotment |
- |
Minority,Others |
51 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
172 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
44 |
66002 |
PADMA LIGHTINGS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
207,315.00
|
0.00 |
207,315.00 |
207,315.00 |
0.00 |
- |
207,315.00 |
Provisional Allotment |
- |
General,Others |
51 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
173 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
250 |
65999 |
SAIBABU TRACTOR MECHANICAL WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
268,290.00
|
134,145.00 |
134,145.00 |
134,145.00 |
0.00 |
- |
134,145.00 |
Provisional Allotment |
- |
General,Others |
66 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
174 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
227 |
66001 |
U PVC GLASS AND HARDWARE |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
268,290.00
|
0.00 |
268,290.00 |
268,290.00 |
0.00 |
- |
268,290.00 |
Provisional Allotment |
- |
SC,Others |
66 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
175 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
206 |
65853 |
SRI LAKSHMI PRASANNA INVERTER AND BATTERY WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
207,315.00
|
0.00 |
207,315.00 |
207,315.00 |
0.00 |
- |
207,315.00 |
Provisional Allotment |
- |
ST,Others |
51 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
176 |
VIJAYAWADA |
Krishna |
AN CHALLAPALLI |
211 |
65922 |
ESWAR ELECTRICAL WORKS |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
207,315.00
|
103,658.00 |
103,657.00 |
103,657.00 |
0.00 |
- |
103,657.00 |
Provisional Allotment |
- |
ST,Others |
51 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
177 |
VIJAYAWADA |
Krishna |
State Food Park, Mallavalli |
Plot No.3A,Plot No.3B |
65524 |
Khyathi Food Manufacturers |
22-FEB-2024 |
22-FEB-2024 |
- |
- |
1,322,400.00
|
0.00 |
1,322,400.00 |
1,322,400.00 |
0.00 |
- |
1,322,400.00 |
Provisional Allotment |
- |
NA |
600 |
R3 |
21-FEB-2026 |
- |
- |
- |
- |
36 |
178 |
VIJAYAWADA |
Krishna |
State Food Park, Mallavalli |
Plot No.17 |
66000 |
AASHRITHA FEEDS PRIVATE LIMITED |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
53,521,936.00
|
0.00 |
53,521,936.00 |
53,521,936.00 |
0.00 |
- |
53,521,936.00 |
Provisional Allotment |
- |
General,Others |
24284 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
179 |
VIJAYAWADA |
Krishna |
State Food Park, Mallavalli |
Plot No.3E |
65923 |
Sri Laksmi Cattle Feed |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
1,485,496.00
|
742,748.00 |
742,748.00 |
742,748.00 |
0.00 |
- |
742,748.00 |
Provisional Allotment |
- |
SC,Others |
674 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |
180 |
VIJAYAWADA |
NTR |
UDL Aunmanchipalli |
UDL Anumanchipalli |
65978 |
SPADS POLYPLAST PRODUCTS PVT LTD |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
9,643,488.00
|
0.00 |
9,643,488.00 |
9,643,488.00 |
8,679,139.00 |
22-MAR-2024 |
964,349.00 |
Provisional Allotment |
- |
General,Others |
11818 |
R3 |
15-MAR-2026 |
- |
- |
- |
- |
14 |
181 |
VISAKHAPATNAM |
Visakhapatnam |
IP_GAMBHEERAM_ITSEZ |
PLOT NO. 7 |
65895 |
Saif Automations Services LLP |
15-MAR-2024 |
15-MAR-2024 |
- |
- |
14,516,928.00
|
0.00 |
14,516,928.00 |
14,516,928.00 |
1,451,693.00 |
29-FEB-2024 |
13,065,235.00 |
Provisional Allotment |
- |
General,Technocrat |
1116 |
R3 |
14-MAR-2026 |
- |
- |
- |
- |
14 |